TIDMAURA

RNS Number : 7284I

Aura Energy Limited

06 December 2022

6th December 2022

 
 Australia's Leading Nuclear Science Organisation Confirms The Quality 
                    of Tiris Project Uranium Product 
      KEY POINTS: 
        *    Australian Nuclear Science and Technology 
             Organisation (ANSTO) Minerals confirms that 
             yellowcake product from the Tiris uranium project in 
             Mauritania meets ASTM International 
             specifications[1]. 
 
 
        *    Key milestone in moving towards the first phase of 
             production at the Tiris project 
 
 
        *    Opens door to marketing discussions with leading 
             nuclear utilities and converters 
====================================================================== 
 

Aura Energy Limited (ASX: AEE, AIM: AURA) is pleased to announce the successful production of yellowcake product from beneficiation pilot plant concentrate samples from the Tiris Uranium Project in Mauritania. The samples used in this program were announced on 23 June 2022. The production of yellowcake in the form of uranium oxide concentrate (UOC) from the samples is a key milestone as the Company moves towards near-term Phase 1 uranium production.

The result successfully completes the uranium recovery test work program at the ANSTO laboratory and indicates that Tiris production could be sold in the international market as a high-standard product without penalties(1) .

s

Figure 1 - ANSTO Produced Yellowcake from Tiris Project. See attachment 1.

Aura's Managing Director, Dave Woodall, commented:

"The successful production of yellowcake from material upgraded in the pilot plant is a significant step for Aura Energy. It opens the door to commercial discussions with nuclear utilities, demonstrates the simple processing parameters required for uranium oxide production at Tiris and provides a strong technical basis for moving the project forward. This will allow us to focus on operating efficiencies as we progress to a final investment decision."

This Announcement contains inside information for the purposes of the UK version of the market abuse regulation (EU No. 596/2014) as it forms part of United Kingdom domestic law by virtue of the European Union (Withdrawal) Act 2018 ("UK MAR").

For Further Information, please contact:

Company

David Woodall

Managing Director and CEO

info@auraenegy.com.au

 
 SP Angel Corporate Finance LLP   WH Ireland Limited 
  (Nominated Advisor and Joint     (Joint Broker) 
  Broker)                          Jessica Cave 
  David Hignell                    Andrew de Andrade 
  Kasia Brzozowska                 +44 (0) 207 220 1666 
  +44 (0) 203 470 0470 
 

About Aura Energy (ASX : AEE, AIM AURA)

Aura Energy is an Australian-based minerals company that has major uranium and polymetallic projects with large resources in Africa and Europe.

The Company is now focused on uranium production from the Tiris Project, a major greenfields uranium discovery in Mauritania, with Aura announcing a Resource Upgrade in August 2021 of 10% or 5.0 million lb U(3) O(8) bringing the total JORC Resource to 56 Mlbs (at a 100 ppm U3O8 lower cut-off grade).

Aura also completed a capital estimate update for the Tiris Definitive Feasibility Study, to reflect current global pricing, with these 2021 figures reconfirming Tiris as one of the lowest capex, lowest operating cost uranium projects.

In October 2021, the Company entered a US$10m Offtake Financing Agreement with Curzon, which includes an additional up to US$10m facility, bringing the maximum available under the agreement to US$20m.

In 2022, Aura will continue to transition from a uranium explorer to a uranium producer, to capitalise on the rapidly growing demand for nuclear power as the world continues to shift towards a decarbonised energy sector.

Disclaimer Regarding Forward-Looking Statements

This ASX announcement (Announcement) contains various forward-looking statements. All statements other than statements of historical fact are forward-looking statements. Forward-looking statements are inherently subject to uncertainties in that they may be affected by a variety of known and unknown risks, variables and factors which could cause actual values or results, performance, or achievements to differ materially from the expectations described in such forward-looking statements. The Company does not give any assurance that the anticipated results, performance, or achievements expressed or implied in those forward-looking statements will be achieved.

Notes to Project Description

The Company confirms that the material assumptions underpinning the Tiris Uranium Production Target and the associated financial information derived from the Tiris production target as outlined in the Aura Energy release dated 18 August 2021 for the Tiris Uranium Project Definitive Feasibility Study continue to apply and have not materially changed.

The Tiris Uranium Project Resource was released on 27 August 2021 "Resource Upgrade of 10% - Tiris Uranium Project". The Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed.

Concerning the Resource statements, there is a low level of geological confidence associated with the inferred mineral resource and there is no certainty that further exploration work will result in the determination of indicated measured resource or that the production target will be realised.

Attachment 1

Tiris UO(4) precipitate impurity concentrations with reference to ASTM standards limit without penalty or rejection. The results generated from bulk metallurgical test work program at ANSTO Minerals on concentrate samples from beneficiation pilot program (see JORC Table 1 below and ASX Release: 23(rd) June 2022)

 
       UO(4) wt%   Limit Without   Limit Without 
        U Basis       Penalty        Rejection 
 As     <0.001         0.05            0.10 
  B      <0.07         0.01            0.10 
 Ca     <0.001         0.05            1.00 
  K      0.06          0.20            2.00 
 Mg     <0.001         0.02            0.50 
 Mo     <0.001         0.10            0.30 
 Na      0.07          0.50            7.50 
  P      <0.07         0.10            0.70 
  S      0.13          1.00            4.00 
 Si      <0.04         0.23            1.17 
 Ti     <0.001         0.01            0.05 
  V      0.02          0.06            0.30 
 Zr      0.01          0.01            0.10 
 Cl      0.02          0.05            0.10 
  F     <0.004         0.01            0.10 
----              --------------  -------------- 
 

APPIX 1

JORC Code 2012

Table 1 Appendix 5A ASX Listing Rules

2022 Tiris Vanadium Resource Estimate

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections)

 
 Criteria       JORC Code explanation                                         Commentary 
 Sampling 
  techniques     *    Nature and quality of sampling (e.g. cut channels,                   -- The data on which this resource 
                      random chips, or specific specialised industry                       estimate is based is from 5 
                      standard measurement tools appropriate to the                        field sampling programmes: 
                      minerals under investigation, such as down hole gamma                1. An air-core (AC) drilling 
                      sondes, or handheld XRF instruments, etc). These                     programme in 2010/11 with grade 
                      examples should not be taken as limiting the broad                   estimation by chemical analysis 
                      meaning of sampling.                                                 of drill samples 
                                                                                           2. An AC drilling programme 
                                                                                           at Lazare in 2012 with grade 
                 *    Include reference to measures taken to ensure sample                 estimation by chemical analysis 
                      representivity and the appropriate calibration of any                of drill samples 
                      measurement tools or systems used.                                   3. An AC drilling programme 
                                                                                           at Sadi in 2015 with grade 
                                                                                           estimation by chemical analysis 
                 *    Aspects of the determination of mineralisation that                  of drill samples 
                      are Material to the Public Report.                                   4. An AC drilling programme 
                                                                                           in 2017 with grade estimation 
                                                                                           by downhole gamma logging 
                 *    In cases where 'industry standard' work has been done                5. A diamond drilling (DD) 
                      this would be relatively simple (e.g. 'reverse                       programme with grade estimation 
                      circulation drilling was used to obtain 1 m samples                  by both chemical analysis of 
                      from which 3 kg was pulverised to produce a 30 g                     core and by downhole gamma 
                      charge for fire assay'). In other cases, more                        logging, for validation purposes. 
                      explanation may be required, such as where there is                  -- The 2011/12 drilling was 
                      coarse gold that has inherent sampling problems.                     the basis of 2 previous Resource 
                      Unusual commodities or mineralisation types (e.g.                    Estimation exercises (ASX release: 
                      submarine nodules) may warrant disclosure of detailed                announcement 14 July 2011 "First 
                      information.                                                         Uranium Resource in Mauritania 
                                                                                           - 50 million pounds", & ASX 
                                                                                           release: 16 July 2014 "Reguibat 
                                                                                           Uranium Project Scoping Study 
                                                                                           Complete). The 2018 resource 
                                                                                           estimation exercise has been 
                                                                                           aimed at upgrading a substantial 
                                                                                           portion of Inferred Resource 
                                                                                           to a higher resource category. 
                                                                                           -- The 2011/12 drillhole spacing 
                                                                                           was predominantly 100m x 200m. 
                                                                                           A portion of the 2012 drilling 
                                                                                           was at a spacing of 50m x 100m 
                                                                                           drilled to define Indicated 
                                                                                           Resources. The 2017 drilling 
                                                                                           was predominantly at a spacing 
                                                                                           of 50m x 50m to define Measured 
                                                                                           Resources. 
                                                                                           -- AC drill cuttings were riffle 
                                                                                           split on site to extract approx. 
                                                                                           2 kg samples for assay for 
                                                                                           the downhole intervals 0 to 
                                                                                           0.5m, 0.5 to 1.0m, 1 to 2m, 
                                                                                           & thereafter in 1m intervals 
                                                                                           to end of hole. 
                                                                                           -- Down hole gamma logging 
                                                                                           in 2017 was by 2 down-hole 
                                                                                           Auslog gamma sondes operated 
                                                                                           by Poseidon Geophysics (Pty) 
                                                                                           Ltd based in Gaborone Botswana 
                                                                                           using 3 geophysicists employed 
                                                                                           by Poseidon geophysics 
                                                                                           -- The 2 sondes were sent to 
                                                                                           the Department of Environment, 
                                                                                           Water & Natural Resources, 
                                                                                           Adelaide South Australia for 
                                                                                           calibration prior to the survey 
               ------------------------------------------------------------  ----------------------------------------------------------------------- 
 Drilling                                                                                -- AC drilling in all programmes 
  techniques      *    Drill type (eg core, reverse circulation, open-hole                was conducted by Wallis Drilling 
                       hammer, rotary air blast, auger, Bangka, sonic, etc)               of Perth WA using a Mantis 
                       and details (eg core diameter, triple or standard                  drillrig and NQ size bit (outer 
                       tube, depth of diamond tails, face-sampling bit or                 diameter 75.7 mm). AC drilling 
                       other type, whether core is oriented and if so, by                 Diamond drilling (DD) was carried 
                       what method, etc).                                                 out by Capital Drilling Mauritanie 
                                                                                          SARL utilising triple tube 
                                                                                          PQ coring (122.6 mm outer diameter 
                                                                                          bit, 85 mm diameter core). 
                                                                                          In 2017 1484 vertical drillholes 
                                                                                          were gamma logged of which 
                                                                                          1428 were AC drillholes and 
                                                                                          56 were cored diamond drillholes. 
               ------------------------------------------------------------  ----------------------------------------------------------------------- 
 Drill sample                                                                            -- In 2011/12/15 AC drilling 
  recovery       *    Method of recording and assessing core and chip                     the total drill return for 
                      sample recoveries and results assessed.                             each sample interval was bagged 
                                                                                          and weighed to an accuracy 
                                                                                          of approximately 0.25 kg to 
                 *    Measures taken to maximise sample recovery and ensure               estimate sample recovery. 
                      representative nature of the samples.                               -- Efforts were made to minimise 
                                                                                          dust loss, eg in most holes 
                                                                                          the first metre was drilled 
                 *    Whether a relationship exists between sample recovery               without applying compressed 
                      and grade and whether sample bias may have occurred                 air, and thereafter minimum 
                      due to preferential loss/gain of fine/coarse                        air necessary to lift the sample 
                      material.                                                           was applied. 
                                                                                          -- No relationship between 
                                                                                          estimated recovery and uranium 
                                                                                          grade was observed. 
                                                                                          -- In view of the ultrafine 
                                                                                          grain size of the uranium mineral 
                                                                                          carnotite, even where high 
                                                                                          recoveries were recorded, it 
                                                                                          is possible that some carnotite 
                                                                                          was lost in dust emitted from 
                                                                                          the drillrig cyclone resulting 
                                                                                          in underestimation of uranium 
                                                                                          grade. 
                                                                                          -- 2017 AC drillholes were 
                                                                                          not physically sampled. 
                                                                                          -- All drillcore was transported 
                                                                                          in covered core trays to Nouakchott 
                                                                                          for geological logging, density 
                                                                                          determination, and core cutting. 
                                                                                          -- Drillcore lengths were measured 
                                                                                          to an accuracy of c. 1 cm immediately 
                                                                                          on removal from the core barrel 
                                                                                          to determine & record core 
                                                                                          recovery. 
                                                                                          -- Given the ultra-fine grained 
                                                                                          nature of the carnotite mineralisation, 
                                                                                          loss of uranium is likely in 
                                                                                          any core runs recording less 
                                                                                          than 100% recovery, and even 
                                                                                          where 100% recovery is recorded 
                                                                                          it is possible some loss of 
                                                                                          carnotite may have occurred. 
               ------------------------------------------------------------  ----------------------------------------------------------------------- 
 Logging 
                  *    Whether core and chip samples have been geologically       *    In 2011/12/15 AC drilling each sample interval was 
                       and geotechnically logged to a level of detail to               geologically logged by an onsite geologist and drill 
                       support appropriate Mineral Resource estimation,                logs were uploaded to Aura's database managed by 
                       mining studies and metallurgical studies.                       Reflex Hub in Perth. A sample of sieved & washed 
                                                                                       chips for each sample interval was retained in chip 
                                                                                       trays for reference. 
                  *    Whether logging is qualitative or quantitative in 
                       nature. Core (or costean, channel, etc) photography. 
                                                                                  *    In 2017 AC drilling only the bottom hole sample was 
                                                                                       geologically logged, and a sample retained in chip 
                  *    The total length and percentage of the relevant                 trays. 
                       intersections logged. 
 
                                                                                  *    Drillcore was photographed, geologically logged and 
                                                                                       logs were recorded on Aura's logging template and 
                                                                                       uploaded to Aura's database managed by Reflex Hub in 
                                                                                       Perth. 385 density measurements (which included 25 
                                                                                       duplicate determinations) were taken on drillcore by 
                                                                                       ALS Laboratories in Nouakchott under the supervision 
                                                                                       of Aura's geologist. 
               ------------------------------------------------------------  ----------------------------------------------------------------------- 
 Sub-sampling 
  techniques      *    If core, whether cut or sawn and whether quarter,          *    2011/12/15 AC drill samples were riffle split on site 
  and sample           half or all core taken.                                         to provide a minimum 2 kg sample for assay and a 
  preparation                                                                          duplicate split for reference and possible umpire 
                                                                                       analysis. 
                  *    If non-core, whether riffled, tube sampled, rotary 
                       split, etc and whether sampled wet or dry. 
                                                                                  *    Duplicates, blanks, and standards were inserted in 
                                                                                       the assay sample stream at regular intervals as 
                  *    For all sample types, the nature, quality and                   detailed in the next section. 
                       appropriateness of the sample preparation technique. 
 
                                                                                  *    Drillcore was cut in half longitudinally by diamond 
                  *    Quality control procedures adopted for all                      saw by ALS Laboratories after marking up by, and 
                       sub-sampling stages to maximise representivity of               under the supervision of, an Aura geologist. 
                       samples. 
 
                                                                                  *    For each half-metre of core half-core was bagged for 
                  *    Measures taken to ensure that the sampling is                   assay 
                       representative of the in-situ material collected, 
                       including for instance results for field 
                       duplicate/second-half sampling.                            *    Given the fine-grained nature of the uranium minerals 
                                                                                       these sample sizes are appropriate 
 
                  *    Whether sample sizes are appropriate to the grain 
                       size of the material being sampled. 
               ------------------------------------------------------------  ----------------------------------------------------------------------- 
 Quality 
  of assay       *    The nature, quality and appropriateness of the                      *    2011/12 AC drill samples were submitted to Stewart 
  data and            assaying and laboratory procedures used and whether                      Laboratories sample preparation facility near 
  laboratory          the technique is considered partial or total.                            Zouerate in Mauritania (In 2012 Stewart Laboratories 
  tests                                                                                        became part of ALS Laboratories). Samples were 
                                                                                               crushed by jaw crusher to -12mm and 1kg was riffle 
                 *    For geophysical tools, spectrometers, handheld XRF                       split for pulverising to +85% passing 75 microns. An 
                      instruments, etc, the parameters used in determining                     c. 100g split was bagged and sent to Stewart 
                      the analysis including instrument make and model,                        Laboratories in Ireland for analysis by pressed 
                      reading times, calibrations factors applied and their                    pellet XRF. Previous analysis comparing different 
                      derivation, etc.                                                         analytical methods (XRF, ICP, DNC) had indicated that 
                                                                                               XRF is an accurate method on this material, if an 
                                                                                               x-ray band is selected for measurement that is not 
                 *    Nature of quality control procedures adopted (eg                         affected by the presence of strontium, and this was 
                      standards, blanks, duplicates, external laboratory                       done. This method will measure total uranium. 2015 AC 
                      checks) and whether acceptable levels of accuracy                        drill samples were submitted to ALS Laboratories 
                      (i.e. lack of bias) and precision have been                              sample preparation facility in Nouakchott Mauritania. 
                      established.                                                             Samples were crushed by jaw crusher to -12mm and 1kg 
                                                                                               was riffle split for pulverising to +85% passing 75 
                                                                                               microns. An c. 100g split was bagged and sent to ALS 
                                                                                               Global in Ireland for analysis by ALS method MC-ICP61 
                                                                                               after 4-acid digestion. This method will measure near 
                                                                                               total uranium. 
 
 
                                                                                          *    Bagged 1/2 core was prepared by ALS Laboratories 
                                                                                               Nouakchott by Method Prep 22 (Crush to 70% less than 
                                                                                               6mm, pulverize entire sample to better than 85% 
                                                                                               passing 75 microns). An c. 100g sample of pulp was 
                                                                                               split off using mini-riffle splitter, placed in 
                                                                                               sample envelope and forwarded by air to ALS in 
                                                                                               Ireland for uranium analysis by ALS Method U-MS62 (U 
                                                                                               by ICP-MS after 4 acid digestion). 4 acid digestion 
                                                                                               provides near total extraction. 
 
 
                                                                                          *    Downhole gamma logging was performed by 2 down-hole 
                                                                                               Auslog gamma sondes comprising: 
 
 
                                                                                          *    DLS5 Winch Controller 
 
 
                                                                                          *    W600-1 12V Portable Winch 
 
 
                                                                                          *    A075 Natural Gamma Tool 
 
 
                                                                                          *    Logging procedures involved: 
 
 
                                                                                          *    Drill holes were gamma logged as soon as possible 
                                                                                               after drilling to avoid radon build-up. 
 
 
                                                                                          *    Each borehole logged in both directions to verify 
                                                                                               consistency 
 
 
                                                                                          *    Logging speed: 2 metres per minute 
 
 
                                                                                          *    Sampling interval: 1 cm 
 
 
                                                                                          *    At least one hole was re-logged after each 20 holes 
                                                                                               as a repeatability check. 
 
 
                                                                                          *    A reference hole was established and relogged every 2 
                                                                                               days as a check on consistency 
 
 
                                                                                          *    Gamma logging procedures & interpretation were 
                                                                                               supervised by consultant David Wilson who qualifies 
                                                                                               as a Competent Person in these matters. 
 
 
                                                                                          *    QAQC procedures for the 2011/12 AC drilling comprised 
                                                                                         , 
                                                                                               on average: 
 
 
                                                                                          *    Field duplicates assays: 1 in every 12 samples 
 
 
                                                                                          *    Blanks: 1 in every 31 samples 
 
 
                                                                                          *    Umpire assays: 1 in every 11 samples Umpire analysis 
                                                                                               was carried on 427 sample intervals. For each of 
                                                                                               these the original pressed pellet XRF sample assayed 
                                                                                               by Stewart Labs was re-assayed by ICP by Stewart Labs 
                                                                                               and also by XRF by ALS Labs and by ICP by ALS. 
 
 
                                                                                          *    Certified Reference material: 1 in every 129 samples 
 
 
                                                                                          *    Total QAQC samples: 1 in every 5 samples 
 
 
                                                                                         Accuracy & precision were 
                                                                                         within acceptable limits. 
               ------------------------------------------------------------  ----------------------------------------------------------------------- 
 Verification                                                                            -- Approximately 2,675 drillholes 
 of sampling     *    The verification of significant intersections by                    were used in this Resource 
 and assaying         either independent or alternative company personnel.                Estimate. In 1484 of these 
                                                                                          U grades was determined by 
                                                                                          downhole gamma logging, and 
                 *    The use of twinned holes.                                           in the remainder U grade was 
                                                                                          determined by chemical assay. 
                                                                                          This provides verification 
                 *    Documentation of primary data, data entry procedures,               of average grades. 57 diamond 
                      data verification, data storage (physical and                       drillholes were both gamma 
                      electronic) protocols.                                              logged and chemically assayed 
                                                                                          for validation purposes. 
                                                                                          -- To test for radioactive 
                 *    Discuss any adjustment to assay data.                               disequilibrium 204 samples 
                                                                                          were sent to either Australian 
                                                                                          Nuclear Science and Technology 
                                                                                          Organisation (ANSTO) in Australia 
                                                                                          or the Activation Laboratories 
                                                                                          (Actlabs) in Canada for equilibrium 
                                                                                          determinations. Results were 
                                                                                          compiled and interpreted by 
                                                                                          D Wilson of 3D Exploration 
                                                                                          who concluded that a factor 
                                                                                          of 1.29 needs to be applied 
                                                                                          to all raw gamma grades to 
                                                                                          provide the correct U grade. 
                                                                                          Diamond drillcore assaying 
                                                                                          confirmed the appropriateness 
                                                                                          of this factor. 
                                                                                          -- All drillhole data recorded 
                                                                                          was uploaded to Aura's online 
                                                                                          database managed by Reflex 
                                                                                          Hub. Analyses were forwarded 
                                                                                          directly from the laboratories 
                                                                                          to Reflex Hub for incorporation 
                                                                                          in the database. 
               ------------------------------------------------------------  ----------------------------------------------------------------------- 
 Location                                                                                -- 2011/12 drillhole collars 
  of data        *    Accuracy and quality of surveys used to locate drill                were surveyed by handheld GPS 
  points              holes (collar and down-hole surveys), trenches, mine                with reported accuracy of +/- 
                      workings and other locations used in Mineral Resource               3 metres. 
                      estimation.                                                         -- All 2017 drillhole collars 
                                                                                          were surveyed by differential 
                                                                                          surveying conducted by IRC-Magma 
                 *    Specification of the grid system used.                              to an accuracy of +/- 20 cm 
                                                                                          in all dimensions. 
                                                                                          -- The grid projection used 
                 *    Quality and adequacy of topographic control.                        is UTM WGS84 Zone 29N 
                                                                                          -- An independent check on 
                                                                                          topography was provided by 
                                                                                          satellite data provided by 
                                                                                          PhotoSat of Vancouver to an 
                                                                                          accuracy of +/- 20 cm confirming 
                                                                                          the quality and adequacy of 
                                                                                          topographic control. 
               ------------------------------------------------------------  ----------------------------------------------------------------------- 
 Data spacing                                                                            -- Drillholes were spaced in 
 and             *    Data spacing for reporting of Exploration Results.                  different programmes at 50m 
 distribution                                                                             x 50m, 50m x 100m, 100m x 100m 
                                                                                          or 100m x 200m. 
                 *    Whether the data spacing, and distribution is                       -- In most cases Measured Resources 
                      sufficient to establish the degree of geological and                are based on 50m x 50m spaced 
                      grade continuity appropriate for the Mineral Resource               drillholes, Indicated Resources 
                      and Ore Reserve estimation procedure(s) and                         are based on 100m x 100m spaced 
                      classifications applied.                                            holes, and Inferred Resources 
                                                                                          on !00m x 200m spaced holes. 
                                                                                          -- Downhole gamma data was 
                 *    Whether sample compositing has been applied.                        composited into 0.5m intervals. 
                                                                                          -- Three 100m x 100m areas 
                                                                                          were drilled at 12.5m spacing 
                                                                                          in both N-S & E-W directions 
                                                                                          for geostatistical purposes 
                                                                                          and to examine variability. 
                                                                                          Variography constructed by 
                                                                                          the resource consultants confirmed 
                                                                                          that the drill spacings are 
                                                                                          appropriate for the Resource 
                                                                                          classifications. Resource classification 
                                                                                          was done by the independent 
                                                                                          resource consultants with no 
                                                                                          input from Aura. 
               ------------------------------------------------------------  ----------------------------------------------------------------------- 
 Orientation                                                                             -- Three 100m x 100m squares 
 of data         *    Whether the orientation of sampling achieves unbiased               were drilled at 12.5m hole 
 in relation          sampling of possible structures and the extent to                   spacing in both N-S and E-W 
 to                   which this is known, considering the deposit type.                  directions to investigate grade 
 geological                                                                               anisotropy. This indicated 
 structure                                                                                a weak NW-SE trend to the mineralisation. 
                 *    If the relationship between the drilling orientation                The drilling pattern employed 
                      and the orientation of key mineralised structures is                is considered appropriate for 
                      considered to have introduced a sampling bias, this                 the mineralisation orientation. 
                      should be assessed and reported if material. 
               ------------------------------------------------------------  ----------------------------------------------------------------------- 
 Sample                                                                                  -- Sample collection was supervised 
  security        *    The measures taken to ensure sample security.                      by geologists. Samples were 
                                                                                          transported as soon as practicable 
                                                                                          to independent sample preparation 
                                                                                          facilities. Approx.65% of drillholes 
                                                                                          were assayed by downhole gamma 
                                                                                          logging and for these sample 
                                                                                          security is not relevant. 
               ------------------------------------------------------------  ----------------------------------------------------------------------- 
 Audits                                                                                  -- Resource estimation in 2012 
  or reviews      *    The results of any audits or reviews of sampling                   was conducted by Oliver Mapeto 
                       techniques and data.                                               of Coffey Mining. This was 
                                                                                          independently reviewed and 
                                                                                          confirmed by Wardell Armstrong 
                                                                                          International in 2016. The 
                                                                                          2021 Resource Estimate at Sadi 
                                                                                          was done by Oliver Mapeto acting 
                                                                                          then as an independent consultant. 
                                                                                          The 2018 resource estimate 
                                                                                          has been carried out by independent 
                                                                                          consulting group H&S Consultants 
                                                                                          Pty Ltd. All of these consulting 
                                                                                          groups have reviewed and endorsed 
                                                                                          the sampling, grade estimation 
                                                                                          and QAQC procedures. 
               ------------------------------------------------------------  ----------------------------------------------------------------------- 
 

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section)

 
 Criteria         JORC Code explanation                                            Commentary 
 Mineral                                                                                      -- The Resource Estimates 
  tenement          *    Type, reference name/number, location and ownership                   are based on drilling conducted 
  and land               including agreements or material issues with third                    on 2 mineral exploration permits 
  tenure status          parties such as joint ventures, partnerships,                         held 100% by Aura Energy: 
                         overriding royalties, native title interests,                         562B4 Oum Ferkik, 2365B4 Oued 
                         historical sites, wilderness or national park and                     EL Foule Sud, on 2 Exploitation 
                         environmental settings.                                               permits: 2492C4 Oued El Foule, 
                                                                                               2491C4 Ain Sder held by Tiris 
                                                                                               Ressources SA, a 100% subsidiary 
                    *    The security of the tenure held at the time of                        of Aura Energy. Aura is in 
                         reporting along with any known impediments to                         the process of divesting 15% 
                         obtaining a licence to operate in the area.                           of Tiris Ressources SA to 
                                                                                               the Mauritanian Government 
                                                                                               as required by the Mining 
                                                                                               Act. 
                                                                                               -- Aura has completed an Environmental 
                                                                                               and Social Impact Assessment 
                                                                                               which concluded there are 
                                                                                               no known issues arising from 
                                                                                               native title, historical sites, 
                                                                                               environmental or third-party 
                                                                                               matters which are likely to 
                                                                                               materially affect exploitation. 
                 ---------------------------------------------------------------  -------------------------------------------------------- 
 Exploration                                                                                  -- Aura is unaware of any 
  done by           *    Acknowledgment and appraisal of exploration by other                  prior exploration on these 
  other parties          parties.                                                              areas. 
                 ---------------------------------------------------------------  -------------------------------------------------------- 
 Geology                                                                                      -- The mineralisation is of 
                    *    Deposit type, geological setting and style of                         the calcrete uranium style. 
                         mineralisation.                                                       It occurs within Proterozoic 
                                                                                               rocks of the Reguibat Craton. 
                                                                                               The mineralisation is developed 
                                                                                               within near surface altered 
                                                                                               and weathered granites and 
                                                                                               within shallow colluvium lying 
                                                                                               on granite or adjacent metasediments. 
                 ---------------------------------------------------------------  -------------------------------------------------------- 
 Drill hole                                                                                   -- Specific drillhole data 
  Information          *    A summary of all information material to the                       is not relevant to the reporting 
                            understanding of the exploration results including a               of this resource estimation 
                            tabulation of the following information for all 
                            Material drill holes: 
 
 
                      1. easting and northing 
                      of the drill hole collar 
                      2. elevation or RL (Reduced 
                      Level - elevation above 
                      sea level in metres) of 
                      the drill hole collar 
                      3. dip and azimuth of 
                      the hole 
                      4. down hole length and 
                      interception depth 
                      5. hole length. 
                       *    If the exclusion of this information is justified on 
                            the basis that the information is not Material and 
                            this exclusion does not detract from the 
                            understanding of the report, the Competent Person 
                            should clearly explain why this is the case. 
                 ---------------------------------------------------------------  -------------------------------------------------------- 
 Data 
 aggregation        *    In reporting Exploration Results, weighting averaging      *    Data aggregation methods are summarised in the 
 methods                 techniques, maximum and/or minimum grade truncations            Resource Estimate report by H&S Consultants which 
                         (e.g., cutting of high grades) and cut-off grades are           this table accompanies. 
                         usually Material and should be stated. 
 
 
                    *    Where aggregate intercepts incorporate short lengths 
                         of high grade results and longer lengths of low grade 
                         results, the procedure used for such aggregation 
                         should be stated and some typical examples of such 
                         aggregations should be shown in detail. 
 
 
                    *    The assumptions used for any reporting of metal 
                         equivalent values should be clearly stated. 
                 ---------------------------------------------------------------  -------------------------------------------------------- 
 Relationship                                                                                 -- All drillholes on which 
 between            *    These relationships are particularly important in the                 the resource estimate is based 
 mineralisation          reporting of Exploration Results.                                     were vertical and approximately 
 widths and                                                                                    perpendicular to the thickness 
 intercept                                                                                     of the mineralisation. 
 lengths            *    If the geometry of the mineralisation with respect to 
                         the drill hole angle is known, its nature should be 
                         reported. 
 
 
                    *    If it is not known and only the down hole lengths are 
                         reported, there should be a clear statement to this 
                         effect (e.g., 'down hole length, true width not 
                         known'). 
                 ---------------------------------------------------------------  -------------------------------------------------------- 
 Diagrams                                                                                     -- Refer to the ASX announcement 
                    *    Appropriate maps and sections (with scales) and                       which this table accompanies. 
                         tabulations of intercepts should be included for any 
                         significant discovery being reported These should 
                         include, but not be limited to a plan view of drill 
                         hole collar locations and appropriate sectional 
                         views. 
                 ---------------------------------------------------------------  -------------------------------------------------------- 
 Balanced                                                                                     -- 
  reporting         *    Where comprehensive reporting of all Exploration 
                         Results is not practicable, representative reporting 
                         of both low and high grades and/or widths should be 
                         practiced to avoid misleading reporting of 
                         Exploration Results. 
                 ---------------------------------------------------------------  -------------------------------------------------------- 
 Other                                                                                        -- Metallurgical testwork 
 substantive        *    Other exploration data, if meaningful and material,                   is ongoing. Information on 
 exploration             should be reported including (but not limited to):                    processing has been reported 
 data                    geological observations; geophysical survey results;                  in ASX announcement: 29 July 
                         geochemical survey results; bulk samples - size and                   2019 "Tiris Uranium Definitive 
                         method of treatment; metallurgical test results; bulk                 Feasibility Study Completed". 
                         density, groundwater, geotechnical and rock                           -- Additional metallurgical 
                         characteristics; potential deleterious or                             test work undertaken on bulk 
                         contaminating substances.                                             samples from the Lazare North 
                                                                                               and Lazare South Resources 
                                                                                               was undertaken at pilot scale 
                                                                                               for the beneficiation circuit 
                                                                                               and reported on 23 June 2022 
                                                                                               " Tests confirm average 550% 
                                                                                               upgrading of uranium at Tiris", 
                 ---------------------------------------------------------------  -------------------------------------------------------- 
 Further                                                                                      -- Refer to the ASX announcement 
  work              *    The nature and scale of planned further work (e.g.,                   which this table accompanies. 
                         tests for lateral extensions or depth extensions or 
                         large-scale step-out drilling). 
 
 
                    *    Diagrams clearly highlighting the areas of possible 
                         extensions, including the main geological 
                         interpretations and future drilling areas, provided 
                         this information is not commercially sensitive. 
                 ---------------------------------------------------------------  -------------------------------------------------------- 
 

Section 3. Estimation and Reporting of Mineral Resources - PART 1

Note this Section 3 has been prepared by H&S Consultants and relates to the Hippolyte, Hippolyte South, Lazare North & Lazare South Resources

 
    Criteria                           JORC Code explanation                                    Commentary 
    Database                                                                                Aura's database was 
   integrity               *    Measures taken to ensure that data has not been          managed by the independent 
                               corrupted by, for example, transcription or keying           organisation Reflex 
                               errors, between its initial collection and its use           Hub, based in Perth. 
                                   for Mineral Resource estimation purposes.                H&SC conducted data 
                                                                                             validation checks 
                                                                                             such as comparing 
                                        Data validation procedures                           assay certificates 
                                                  used.                                     to database records 
                                                                                          and a variety of checks 
                                                                                        for internal inconsistencies 
                                                                                            such as overlapping 
                                                                                             intervals, records 
                                                                                             beyond end of hole 
                                                                                         depth, unassayed intervals 
                                                                                           and unrealistic drill 
                                                                                                 hole data. 
                 -----------------------------------------------------------------  ---------------------------------- 
  Site visits                                                                              H&SC has not visited 
                             *    Comment on any site visits undertaken by the            the Tiris East deposits 
                               Competent Person and the outcome of those visits.           due to time and budget 
                                                                                             constraints. H&SC 
                                                                                             based its view of 
                                            If no site visits                              the geological setting 
                                           have been undertaken                              and mineralisation 
                                            indicate why this                               on drill hole data, 
                                               is the case.                                discussions with Aura 
                                                                                             geologists and on 
                                                                                          information in technical 
                                                                                          reports. Representatives 
                                                                                            of Coffey Mining and 
                                                                                             Wardell Armstrong 
                                                                                          International conducted 
                                                                                            site visits in Aril 
                                                                                             2012 and May 2016 
                                                                                               respectively. 
                 -----------------------------------------------------------------  ---------------------------------- 
   Geological                                                                           The uranium mineralisation 
 interpretation         *    Confidence in (or conversely, the uncertainty of) the        generally forms shallow 
                               geological interpretation of the mineral deposit.             horizontal tabular 
                                                                                             bodies ranging in 
                                                                                            thickness from 1 to 
                        *    Nature of the data used and of any assumptions made.         12 m hosted in weathered 
                                                                                            granite and granitic 
                                                                                         sediments. Differentiation 
                        *    The effect, if any, of alternative interpretations on        of the weathered granite 
                                         Mineral Resource estimation.                     from granitic sediments 
                                                                                             is unreliable from 
                                                                                             AC sample returns. 
                        *    The use of geology in guiding and controlling Mineral          A purely geological 
                                             Resource estimation.                            model of the Tiris 
                                                                                           deposits has not been 
                                                                                                 produced. 
                                          The factors affecting                            H&SC created a surface 
                                           continuity both of                              representing the base 
                                           grade and geology.                               of the estimates in 
                                                                                             order to limit the 
                                                                                          extrapolation of grades 
                                                                                             into volumes that 
                                                                                             had no data. This 
                                                                                           is important at Tiris 
                                                                                             East as there is a 
                                                                                            general decrease in 
                                                                                            uranium grades with 
                                                                                            depth. This surface 
                                                                                            nominally represents 
                                                                                       the top of the less-weathered 
                                                                                             granite, where AC 
                                                                                          drilling could penetrate 
                                                                                            no further. The base 
                                                                                            surface was produced 
                                                                                            using the locations 
                                                                                             of the end of the 
                                                                                             deepest assay from 
                                                                                           each drill hole. Where 
                                                                                           drill holes were very 
                                                                                            close, within around 
                                                                                            15 m, the shallower 
                                                                                             point was removed. 
                                                                                           The base surface also 
                                                                                          honoured mapped surface 
                                                                                                 outcrops. 
                                                                                            At the time that the 
                                                                                         estimates were completed, 
                                                                                           no topographic survey 
                                                                                            data were available. 
                                                                                             The vast majority 
                                                                                             of the 2017 drill 
                                                                                           collar locations were 
                                                                                       surveyed using a Differential 
                                                                                             Global Positioning 
                                                                                            System (DGPS). H&SC 
                                                                                             used the locations 
                                                                                             of all drill hole 
                                                                                           collars that had been 
                                                                                           located with the DGPS 
                                                                                           to create a wireframe 
                                                                                        representing the topographic 
                                                                                          surface. The elevations 
                                                                                             of all drill holes 
                                                                                           that had been located 
                                                                                            using a handheld GPS 
                                                                                             were then derived 
                                                                                           from this topographic 
                                                                                                  surface. 
                                                                                             The proportion of 
                                                                                             the block between 
                                                                                            the topographic and 
                                                                                             base surfaces were 
                                                                                           assigned to the block 
                                                                                             model and used to 
                                                                                            weight the reported 
                                                                                                 estimates. 
                                                                                             The interpretation 
                                                                                           of the mineralisation 
                                                                                           as flat lying tabular 
                                                                                           bodies is undisputed. 
                                                                                            The lateral extents 
                                                                                           of the mineralisation 
                                                                                             are poorly defined 
                                                                                          and additional drilling 
                                                                                            around the edges of 
                                                                                         the deposits may indicate 
                                                                                            that mineralisation 
                                                                                            is more limited than 
                                                                                           currently interpreted. 
                                                                                        Alternative interpretations 
                                                                                             of the geology are 
                                                                                       very unlikely to significantly 
                                                                                        impact estimated resources. 
                                                                                             The continuity of 
                                                                                           both grade and geology 
                                                                                            are affected by the 
                                                                                            extent of weathering 
                                                                                           of the granitic host. 
                                                                                            The continuity does 
                                                                                         not appear to be affected 
                                                                                                by faulting. 
                 -----------------------------------------------------------------  ---------------------------------- 
   Dimensions                        The extent and variability                            The Mineral Resources 
                                       of the Mineral Resource                              reported here occur 
                                         expressed as length                               in four separate areas 
                                    (along strike or otherwise),                             (Hippolyte North, 
                                        plan width, and depth                             Hippolyte South, Lazare 
                                        below surface to the                              North and Lazare South) 
                                       upper and lower limits                               within a SE trending 
                                      of the Mineral Resource.                              rectangle around 40 
                                                                                             km north-south and 
                                                                                            12 km east-west. All 
                                                                                            mineralisation forms 
                                                                                             flat lying tabular 
                                                                                             bodies ranging in 
                                                                                            thickness from 1 to 
                                                                                                   12 m. 
                                                                                           The Mineral Resources 
                                                                                             at Hippolyte North 
                                                                                            at a cut-off of 100 
                                                                                             ppm U3O8 occur in 
                                                                                           an area 6 km east-west 
                                                                                          and 5.5 km north-south. 
                                                                                          This region is comprised 
                                                                                            of several separate 
                                                                                            areas that range in 
                                                                                            plan dimensions from 
                                                                                            500 m to 1.1 km wide 
                                                                                            and 500 m to 2.2 km 
                                                                                           long. The upper limit 
                                                                                           of the mineralisation 
                                                                                             occurs at surface 
                                                                                         and the reported resources 
                                                                                           reach a maximum depth 
                                                                                           of 11 m below surface. 
                                                                                           The Mineral Resources 
                                                                                             at Hippolyte South 
                                                                                            at a cut-off of 100 
                                                                                             ppm U3O8 occur in 
                                                                                          an area 5.6 km east-west 
                                                                                          and 5.4 km north-south. 
                                                                                          This region is comprised 
                                                                                             of three isolated 
                                                                                             areas each with a 
                                                                                             north-south length 
                                                                                            of around 1.3 km and 
                                                                                            an east-west length 
                                                                                             that ranges 400 m 
                                                                                            to 1.1 km. The upper 
                                                                                        limit of the mineralisation 
                                                                                             occurs at surface 
                                                                                         and the reported resources 
                                                                                           reach a maximum depth 
                                                                                            of six metres below 
                                                                                                  surface 
                                                                                           The Mineral Resources 
                                                                                             at Lazare North at 
                                                                                            a cut-off of 100 ppm 
                                                                                           U3O8 occur in an area 
                                                                                            4.5 km east-west and 
                                                                                            2.4 km north-south. 
                                                                                          This region is comprised 
                                                                                             of three isolated 
                                                                                            areas. The smallest 
                                                                                             of these areas has 
                                                                                            an east-west length 
                                                                                         of 900 m and a north-south 
                                                                                            length of 550 m. The 
                                                                                            largest area has an 
                                                                                            east-west length of 
                                                                                         2.2 km m and a north-south 
                                                                                             length of 1.8 km. 
                                                                                             The upper limit of 
                                                                                             the mineralisation 
                                                                                             occurs at surface 
                                                                                         and the reported resources 
                                                                                           reach a maximum depth 
                                                                                           of 12 m below surface. 
                                                                                           The Mineral Resources 
                                                                                             at Lazare South at 
                                                                                            a cut-off of 100 ppm 
                                                                                         U3O8 occur in an irregular 
                                                                                          shape with an east-west 
                                                                                            length of 5.5 km and 
                                                                                            a north-south length 
                                                                                           of 2.7 km. The largest 
                                                                                           area has an east-west 
                                                                                             length of 2.2 km m 
                                                                                             and a north-south 
                                                                                             length of 1.8 km. 
                                                                                             The upper limit of 
                                                                                             the mineralisation 
                                                                                             occurs at surface 
                                                                                         and the reported resources 
                                                                                           reach a maximum depth 
                                                                                           of 10 m below surface. 
                 -----------------------------------------------------------------  ---------------------------------- 
 Estimation and                                                                           The uranium concentrations 
   modelling              *    The nature and appropriateness of the estimation           were estimated by 
   techniques                 technique(s) applied and key assumptions, including         recoverable Multiple 
                                 treatment of extreme grade values, domaining,            Indicator Kriging 
                                 interpolation parameters, maximum distance of            (MIK) using the GS3 
                                        extrapolation from data points.                   geostatistical software. 
                                                                                          The uranium grades 
                                                                                          at the Tiris East 
                            *    The availability of check estimates, previous            deposits exhibit a 
                             estimates and/or mine production records and whether         positively skewed 
                                the Mineral Resource estimate takes appropriate           distribution and therefore 
                                             account of such data.                        show reasonable sensitivity 
                                                                                          to a small number 
                                                                                          of high grades. MIK 
                             *    The assumptions made regarding recovery of              is considered an appropriate 
                                                 by-products.                             estimation method 
                                                                                          for the uranium grade 
                                                                                          distribution at the 
                        *    Estimation of deleterious elements or other non-grade        Tiris East deposits 
                             variables of economic significance (e.g., sulphur for        because it specifically 
                                     acid mine drainage characterisation).                accounts for the changing 
                                                                                          spatial continuity 
                                                                                          at different grades 
                         *    In the case of block model interpolation, the block         through a set of indicator 
                              size in relation to the average sample spacing and          variograms at a range 
                                             the search employed.                         of grade thresholds. 
                                                                                          It also reduces the 
                                                                                          need to use the practice 
                        *    Any assumptions behind modelling of selective mining         of top cutting. 
                                                    units.                                All drill hole intervals 
                                                                                          were composited to 
                                                                                          0.5 m for estimation. 
                        *    Any assumptions about correlation between variables.         The following number 
                                                                                          of half metre composites 
                                                                                          were used to estimate 
                        *    Description of how the geological interpretation was         the deposits: 
                                    used to control the resource estimates.                *    Hippolyte North: 9,920 
 
 
                          *    Discussion of basis for using or not using grade            *    Hippolyte South: 1,078 
                                              cutting or capping. 
 
                                                                                           *    Lazare North: 1,585 
                                       The process of validation, 
                                          the checking process 
                                          used, the comparison                             *    Lazare South: 6,743 
                                         of model data to drill 
                                           hole data, and use 
                                            of reconciliation                             Top-cut values were 
                                           data if available.                             chosen by assessing 
                                                                                          the high end distribution 
                                                                                          of the grade population 
                                                                                          within each zone and 
                                                                                          selecting the value 
                                                                                          at which the distribution 
                                                                                          became erratic. Only 
                                                                                          one composite in Lazar 
                                                                                          North was top-cut. 
                                                                                          This interval had 
                                                                                          a U(3) O(8) grade 
                                                                                          of 7,937 ppm and was 
                                                                                          cut to 3,200 ppm. 
                                                                                          The four deposits 
                                                                                          were subdivided into 
                                                                                          a total of seventeen 
                                                                                          Subzones for estimation. 
                                                                                          Conditional statistics 
                                                                                          were produced for 
                                                                                          each of the Subzones. 
                                                                                          All class grades used 
                                                                                          for estimation of 
                                                                                          the mineralised domains 
                                                                                          were derived from 
                                                                                          the class mean grades. 
                                                                                          Vanadium is a potential 
                                                                                          by-product and vanadium 
                                                                                          oxide ( V(2) O(5) 
                                                                                          ) has been estimated 
                                                                                          for the mineral resources 
                                                                                          using the stoichiometric 
                                                                                          V(2) O(5) /U(3) O(8) 
                                                                                          ratio for carnotite 
                                                                                          group minerals. These 
                                                                                          V(2) O(5) values represent 
                                                                                          potentially recoverable 
                                                                                          vanadium in carnotite 
                                                                                          and not total vanadium 
                                                                                          occurring in mineralisation, 
                                                                                          which is significantly 
                                                                                          higher in almost all 
                                                                                          cases. These potentially 
                                                                                          recoverable V(2) O(5) 
                                                                                          values are based on 
                                                                                          the analysis of a 
                                                                                          substantial database 
                                                                                          of available sample 
                                                                                          data and represent 
                                                                                          average values that 
                                                                                          may be conservative. 
                                                                                          This procedure relies 
                                                                                          on the correlation 
                                                                                          between uranium and 
                                                                                          vanadium in carnotite 
                                                                                          group minerals, which 
                                                                                          are the only uranium 
                                                                                          minerals identified 
                                                                                          to date at Tiris. 
                                                                                          No deleterious elements 
                                                                                          or other non-grade 
                                                                                          variables of economic 
                                                                                          significance have 
                                                                                          been identified or 
                                                                                          estimated. 
                                                                                          The base surface created 
                                                                                          to represent the top 
                                                                                          of the less-weathered 
                                                                                          granite was used to 
                                                                                          limit the extrapolation 
                                                                                          of grades into volumes 
                                                                                          that had no data. 
                                                                                          The Recoverable MIK 
                                                                                          technique employed 
                                                                                          by H&SC in this case 
                                                                                          requires a set of 
                                                                                          14 variogram models, 
                                                                                          one for each of the 
                                                                                          fourteen grade bins 
                                                                                          used. A set of variogram 
                                                                                          models were created 
                                                                                          for Subzones of the 
                                                                                          Hippolyte North, Lazare 
                                                                                          North and Lazare South 
                                                                                          deposits. These variogram 
                                                                                          models were applied 
                                                                                          to Subzones that did 
                                                                                          not have sufficient 
                                                                                          data to generate reliable 
                                                                                          models. 
                                                                                          The Hippolyte North, 
                                                                                          Lazar North and Lazar 
                                                                                          South deposits have 
                                                                                          areas that have been 
                                                                                          drilled on a 50x50 
                                                                                          m grid whereas the 
                                                                                          Hippolyte South areas 
                                                                                          have been drilled 
                                                                                          on a 100x100 m grid. 
                                                                                          Separate block models 
                                                                                          were created for Hippolyte 
                                                                                          North, Lazar North, 
                                                                                          Lazar South and for 
                                                                                          each of the three 
                                                                                          Zones in Hippolyte 
                                                                                          South. Nominal downhole 
                                                                                          sampling interval 
                                                                                          is 0.5 m. Drill hole 
                                                                                          grade data were composited 
                                                                                          to 0.5 m intervals. 
                                                                                          The block dimensions 
                                                                                          were 50 x 50 m in 
                                                                                          plan view and 1 m 
                                                                                          vertically. The plan 
                                                                                          dimensions were chosen 
                                                                                          as it is the nominal 
                                                                                          drill hole spacing 
                                                                                          (preferable for MIK 
                                                                                          estimation). The vertical 
                                                                                          dimension was chosen 
                                                                                          to reflect the anisotropy 
                                                                                          of the mineralisation 
                                                                                          and the downhole data 
                                                                                          spacing. 
                                                                                          The minimum selective 
                                                                                          mining unit size is 
                                                                                          assumed to be 10x10x0.5 
                                                                                          m. 
                                                                                          A three pass search 
                                                                                          strategy was used 
                                                                                          to estimate the U(3) 
                                                                                          O(8) grades at each 
                                                                                          of the deposits. Each 
                                                                                          pass required a minimum 
                                                                                          number of samples 
                                                                                          with data from a minimum 
                                                                                          number of octants 
                                                                                          of the search ellipse 
                                                                                          to be populated. 
                                                                                          Discretisation 
                                                                                          was set to 10x10x0.5 
                                                                                          m. The search criteria 
                                                                                          are shown below. The 
                                                                                          short first axis of 
                                                                                          the search ellipse 
                                                                                          is vertical. 
                                                                                          1. 1.5x60x60m search, 
                                                                                          16-48 samples, minimum 
                                                                                          4 octants 
                                                                                          2. 1.5x150x150m search, 
                                                                                          16-48 samples, minimum 
                                                                                          4 octants 
                                                                                          3. 2.4x240x240m search, 
                                                                                          16-48 samples, minimum 
                                                                                          4 octants 
                                                                                          The maximum distance 
                                                                                          of extrapolation of 
                                                                                          the reported estimates 
                                                                                          from drill hole data 
                                                                                          points is limited 
                                                                                          to 220 m. 
                                                                                          The Hippolyte North 
                                                                                          and Lazar North deposits 
                                                                                          were estimated by 
                                                                                          Mr. Mapeto of Coffey 
                                                                                          Mining in 2011. Lazar 
                                                                                          South was estimated 
                                                                                          by Mr. Mapeto in 2012. 
                                                                                          H&SC has access to 
                                                                                          these block models 
                                                                                          and considers that 
                                                                                          the current Mineral 
                                                                                          Resource Estimate 
                                                                                          takes appropriate 
                                                                                          account of these models. 
                                                                                          Significant additional 
                                                                                          drilling has occurred 
                                                                                          since these estimates 
                                                                                          were produced so the 
                                                                                          volume and confidence 
                                                                                          category have increased. 
                                                                                          Reasonably large differences 
                                                                                          exist between the 
                                                                                          current and previous 
                                                                                          estimates due to differences 
                                                                                          in estimation methodologies. 
                                                                                          No check estimates 
                                                                                          were produced. 
                                                                                          No mining has occurred 
                                                                                          on the Tiris East 
                                                                                          deposits so mine production 
                                                                                          data were unavailable 
                                                                                          for comparison. 
                                                                                          The final H&SC block 
                                                                                          model was reviewed 
                                                                                          visually by H&SC and 
                                                                                          Aura and it was concluded 
                                                                                          that the block model 
                                                                                          fairly represents 
                                                                                          the grades observed 
                                                                                          in the drill holes. 
                                                                                          H&SC also validated 
                                                                                          the block model 
                                                                                          statistically 
                                                                                          using histograms, 
                                                                                          boxplots, scatter 
                                                                                          plots and summary 
                                                                                          statistics. 
                 -----------------------------------------------------------------  ---------------------------------- 
    Moisture                            Whether the tonnages                         Tonnages are estimated 
                                         are estimated on a                           on a dry weight basis. 
                                          dry basis or with                           The moisture content 
                                          natural moisture,                           was not determined. 
                                          and the method of 
                                        determination of the 
                                          moisture content. 
                 -----------------------------------------------------------------  ---------------------------------- 
    Cut-off                               The basis of the                           A cut-off of 100 ppm 
   parameters                         adopted cut-off grade(s)                        U(3) O(8) cut off 
                                        or quality parameters                         is used to report 
                                              applied.                                the resources as it 
                                                                                      is assumed that ore 
                                                                                      can be economically 
                                                                                      mined at this grade 
                                                                                      in an open pit scenario. 
                                                                                      This cut-off is considered 
                                                                                      to be relatively low 
                                                                                      compared to operating 
                                                                                      uranium mines, but 
                                                                                      metallurgical test 
                                                                                      work indicates that 
                                                                                      a significant upgrade 
                                                                                      in uranium and decrease 
                                                                                      in sulphates can be 
                                                                                      achieved by a simple 
                                                                                      grinding and sieving 
                                                                                      process. 
                 -----------------------------------------------------------------  ---------------------------------- 
 Mining factors                                                                            All of the resources 
       or                *    Assumptions made regarding possible mining methods,            reported here have 
  assumptions                   minimum mining dimensions and internal (or, if               been estimated on 
                               applicable, external) mining dilution. It may not            the assumption that 
                               always be possible to make assumptions regarding              the deposits will 
                             mining methods and parameters when estimating Mineral         be mined by open-pit. 
                             Resources. Where no assumptions have been made, this          Recoverable MIK allows 
                                              should be reported.                            for block support 
                                                                                           correction to account 
                                                                                            for the change from 
                                                                                            sample size support 
                                                                                          to the size of a mining 
                                                                                            block. This process 
                                                                                            requires an assumed 
                                                                                            grade control drill 
                                                                                          spacing and the assumed 
                                                                                           size of the Selective 
                                                                                             Mining Unit (SMU). 
                                                                                          The variance adjustment 
                                                                                           factors were estimated 
                                                                                             from the U(3) O(8) 
                                                                                           metal variogram models 
                                                                                             assuming a minimum 
                                                                                          SMU of 10x10x0.5 metres 
                                                                                          (east, north, vertical) 
                                                                                             with high quality 
                                                                                           grade control sampling 
                                                                                            on a 10x10x0.5 metre 
                                                                                           pattern (east, north, 
                                                                                                 vertical). 
                                                                                             The application of 
                                                                                          the variance adjustments 
                                                                                         to the resource estimates 
                                                                                           is expected to provide 
                                                                                          estimates of recoverable 
                                                                                             resources without 
                                                                                             the need to apply 
                                                                                             additional mining 
                                                                                             dilution or mining 
                                                                                             recovery factors. 
                                                                                             Internal dilution, 
                                                                                            that is, within the 
                                                                                           SMU unit is accounted 
                                                                                            for. If a larger SMU 
                                                                                             size or a broader 
                                                                                            grade control drill 
                                                                                           pattern is implemented 
                                                                                          the selectivity assumed 
                                                                                         in the reported resources 
                                                                                            may not be realised. 
                 -----------------------------------------------------------------  ---------------------------------- 
 Metallurgical                       The basis for assumptions                               The metallurgical 
    factors                           or predictions regarding                             test work information 
 or assumptions                      metallurgical amenability.                          supplied to H&SC indicates 
                                          It may not always                                 that the Tiris East 
                                         be possible to make                               deposits are amenable 
                                        assumptions regarding                            to a process of crushing, 
                                       metallurgical treatment                           screening and an alkaline 
                                      processes and parameters                               carbonate leach in 
                                       when reporting Mineral                            order to recover uranium. 
                                         Resources. Where no                               Bench scale test work 
                                        assumptions have been                           indicates that a significant 
                                          made, this should                                  upgrade in uranium 
                                            be reported.                                  and decrease in sulphate 
                                                                                             concentrations can 
                                                                                            be achieved through 
                                                                                                 screening. 
                                                                                            No penalty elements 
                                                                                             identified in work 
                                                                                                  so far. 
                                                                                           Metallurgical testwork 
                                                                                           on Tiris ore has shown 
                                                                                             that about 55% to 
                                                                                            58% of vanadium was 
                                                                                           also extracted during 
                                                                                            the alkaline leach. 
                                                                                            The V(2) O(5) /U(3) 
                                                                                            O(8) ratios for the 
                                                                                             final leach liquor 
                                                                                         are close to the carnotite 
                                                                                            V(2) O(5) /U(3) O(8) 
                                                                                             ratio, indicating 
                                                                                           that effectively only 
                                                                                          vanadium from carnotite 
                                                                                           is being leached under 
                                                                                             these conditions. 
                                                                                            To date, no vanadium 
                                                                                            extraction testwork 
                                                                                            has been carried out 
                                                                                            for the recovery of 
                                                                                             vanadium from the 
                                                                                          pregnant leach solution, 
                                                                                             so further work is 
                                                                                          required to demonstrate 
                                                                                             that a marketable 
                                                                                            vanadium product can 
                                                                                        be produced on a commercial 
                                                                                                   basis. 
                                                                                           No further assumptions 
                                                                                              have been made. 
 
                                                                                             Metallurgical test 
                                                                                            work on 1t composite 
                                                                                           samples representative 
                                                                                          of metallurgical domains 
                                                                                           from the Lazare North 
                                                                                         and Lazare South Resources 
                                                                                            were processed using 
                                                                                             1m rotary scrubber 
                                                                                            and production scale 
                                                                                             Derrick screen at 
                                                                                            Mintek South Africa. 
                                                                                            Concentrate product 
                                                                                           from these tests were 
                                                                                             processed at ANSTO 
                                                                                           Minerals, Sydney using 
                                                                                           leaching, ion exchange 
                                                                                             and precipitation 
                                                                                             conditions defined 
                                                                                             within the process 
                                                                                           design criteria. Final 
                                                                                         Uranium Oxide Concentrate 
                                                                                             (UOC) was produced 
                                                                                            within ASTM standard 
                                                                                           limits without penalty 
                                                                                             and limits without 
                                                                                                 rejection. 
                 -----------------------------------------------------------------  ---------------------------------- 
 Environmental                            Assumptions made                                   Aura has informed 
    factors                              regarding possible                              H&SC that an Environmental 
 or assumptions                           waste and process                                  and Social Impact 
                                      residue disposal options.                             Assessment has been 
                                       It is always necessary                            completed which concluded 
                                       as part of the process                                there are no known 
                                      of determining reasonable                             issues arising from 
                                       prospects for eventual                             native title, historical 
                                         economic extraction                                sites, environmental 
                                      to consider the potential                            or third party matters 
                                        environmental impacts                                that are likely to 
                                          of the mining and                                  materially affect 
                                        processing operation.                                exploitation. H&SC 
                                         While at this stage                                 therefore assumes 
                                          the determination                                  that there are no 
                                     of potential environmental                            known unusual aspects 
                                        impacts, particularly                                of the Tiris East 
                                          for a greenfields                                  deposits that may 
                                       project, may not always                         lead to adverse environmental 
                                          be well advanced,                                 impacts beyond what 
                                         the status of early                                 is expected from a 
                                       consideration of these                                mining operation. 
                                       potential environmental                             Waste rock and process 
                                          impacts should be                                 residue are expected 
                                        reported. Where these                                to be disposed of 
                                        aspects have not been                             in the areas surrounding 
                                       considered this should                           the deposits and processing 
                                         be reported with an                             facility, in a responsible 
                                         explanation of the                               manner and in compliance 
                                      environmental assumptions                              with local mining 
                                                made.                                               law. 
                 -----------------------------------------------------------------  ---------------------------------- 
  Bulk density                           Whether assumed or                                 Dry bulk density of 
                                       determined. If assumed,                               diamond drill core 
                                          the basis for the                                 was measured at the 
                                     assumptions. If determined,                         ALS facility in Nouakchott 
                                      the method used, whether                               using an immersion 
                                      wet or dry, the frequency                              method (Archimedes 
                                        of the measurements,                               principle) on selected 
                                        the nature, size and                               PQ diamond drill core 
                                         representativeness                                  intervals ranging 
                                           of the samples.                                   in size from 10 to 
                                                                                          30 cm. Competent pieces 
                                                                                             of drill core were 
                                                                                           selected on a nominal 
                                                                                             interval of 50 cm. 
                                                                                             The samples chosen 
                                                                                             are believed to be 
                                                                                             representative of 
                                                                                            the surrounding rock 
                                                                                             type. All density 
                                                                                            samples are wrapped 
                                                                                           in cling film to avoid 
                                                                                             water absorption. 
                                                                                           A total of 304 density 
                                                                                             measurements have 
                                                                                           been taken from drill 
                                                                                             core at the Tiris 
                                                                                             East deposits with 
                                                                                            values ranging from 
                                                                                             1.55 to 2.66 t/m3. 
                                                                                          Measured density values 
                                                                                             show that there is 
                                                                                          a reasonable correlation 
                                                                                            between density and 
                                                                                          the depth of the sample. 
                                                                                           A regression was used 
                                                                                            to assign densities 
                                                                                            to each block in the 
                                                                                             block model based 
                                                                                             on the depth below 
                                                                                                  surface. 
                 -----------------------------------------------------------------  ---------------------------------- 
 Classification                                                                             The classification 
                           *    The basis for the classification of the Mineral            is based on the search 
                                 Resources into varying confidence categories.             pass used to estimate 
                                                                                            the block. In order 
                                                                                          to limit small, isolated 
                          *    Whether appropriate account has been taken of all            volumes of different 
                                 relevant factors (i.e., relative confidence in           classification (spotted 
                              tonnage/grade estimations, confidence in continuity          dog effect) the search 
                               of geology and metal values, quality, quantity and         passes used to populate 
                                           distribution of the data).                     each block were locally 
                                                                                             averaged. Pass one 
                                                                                             nominally equates 
                                            Whether the result                             to Measured Resources, 
                                          appropriately reflects                            Pass two translates 
                                          the Competent Person's                           to Indicated Resources 
                                           view of the deposit.                            and Pass three equates 
                                                                                           to Inferred Resources. 
                                                                                         This scheme is considered 
                                                                                        by H&SC to take appropriate 
                                                                                          account of all relevant 
                                                                                             factors, including 
                                                                                          the relative confidence 
                                                                                            in tonnage and grade 
                                                                                           estimates, confidence 
                                                                                             in the continuity 
                                                                                            of geology and metal 
                                                                                          values, and the quality, 
                                                                                         quantity and distribution 
                                                                                                of the data. 
                                                                                             The classification 
                                                                                           appropriately reflects 
                                                                                           the Competent Person's 
                                                                                          (Arnold van der Heyden) 
                                                                                            view of the deposit. 
                 -----------------------------------------------------------------  ---------------------------------- 
   Audits or                             The results of any                                This Mineral Resource 
    reviews                               audits or reviews                                  estimate has been 
                                         of Mineral Resource                            reviewed by Aura personnel. 
                                             estimates.                                   The estimation procedure 
                                                                                          has also been internally 
                                                                                             reviewed by H&SC. 
                                                                                             No material issues 
                                                                                             were identified as 
                                                                                             a result of these 
                                                                                                  reviews. 
                                                                                             No external audits 
                                                                                            have been completed 
                                                                                          on the Mineral Resource 
                                                                                                 estimates. 
                 -----------------------------------------------------------------  ---------------------------------- 
 Discussion of                                                                             The relative accuracy 
    relative                *    Where appropriate a statement of the relative              and confidence level 
   accuracy/                 accuracy and confidence level in the Mineral Resource        in the Mineral Resource 
   confidence                   estimate using an approach or procedure deemed            estimates are considered 
                             appropriate by the Competent Person. For example, the           to be in line with 
                                 application of statistical or geostatistical              the generally accepted 
                              procedures to quantify the relative accuracy of the         accuracy and confidence 
                             resource within stated confidence limits, or, if such         of the nominated JORC 
                             an approach is not deemed appropriate, a qualitative       Mineral Resource categories. 
                                discussion of the factors that could affect the           This has been determined 
                               relative accuracy and confidence of the estimate.             on a qualitative, 
                                                                                         rather than quantitative, 
                                                                                           basis. The main factor 
                         *    The statement should specify whether it relates to         that affects the relative 
                              global or local estimates, and, if local, state the         accuracy and confidence 
                                relevant tonnages, which should be relevant to            of the Mineral Resource 
                               technical and economic evaluation. Documentation              estimate is sample 
                              should include assumptions made and the procedures            data density due to 
                                                     used.                                  the reasonably high 
                                                                                           variability in uranium 
                                                                                                  grades. 
                                            These statements                                 The estimates are 
                                          of relative accuracy                              global although the 
                                            and confidence of                               resources classified 
                                           the estimate should                           as Measured and Indicated 
                                       be compared with production                         are suitable for long 
                                         data, where available.                              term mine planning 
                                                                                             studies. It should 
                                                                                             be noted that the 
                                                                                            Indicated Resources 
                                                                                            are based on broadly 
                                                                                            spaced data and may 
                                                                                           be locally inaccurate. 
                                                                                           Closer spaced drilling 
                                                                                             is necessary prior 
                                                                                         to detailed mine planning. 
                                                                                             No production data 
                                                                                           are available as only 
                                                                                            small scale illegal 
                                                                                            artisanal mining has 
                                                                                            occurred around the 
                                                                                            Tiris East deposits. 
                 -----------------------------------------------------------------  ---------------------------------- 
 

Section 3. Estimation and Reporting of Mineral Resources - PART 2

Note: This Section 3 has been prepared by Oliver Mapeto and relates to the Sadi, Hippolyte West, Marie, Ferkik East & Ferkik West Resources

 
 Criteria         JORC Code explanation                                          Commentary 
 Database                                                                        Aura's database was 
 integrity           *    Measures taken to ensure that data has not been         managed by the independent 
                          corrupted by, for example, transcription or keying      organisation Reflex 
                          errors, between its initial collection and its use      Hub, based in Perth. 
                          for Mineral Resource estimation purposes.               The consultant conducted 
                                                                                  data validation checks 
                                                                                  including comparing 
                    Data validation procedures                                    assay certificates 
                    used.                                                         to database records 
                                                                                  and a variety of checks 
                                                                                  for internal inconsistencies 
                                                                                  such as overlapping 
                                                                                  intervals, records 
                                                                                  beyond end of hole 
                                                                                  depth, unassayed intervals, 
                                                                                  and unrealistic drill 
                                                                                  hole data. Additional 
                                                                                  checks included collar 
                                                                                  details checks. Unrealistic 
                                                                                  RL on historical data 
                                                                                  based on new survey 
                                                                                  data were adjusted 
                                                                                  using nearest neighbour. 
                 -------------------------------------------------------------  ----------------------------------------------------------------- 
 Site visits                                                                     Site visit to the 
                     *    Comment on any site visits undertaken by the            project area was conducted 
                          Competent Person and the outcome of those visits.       by the Consultant 
                                                                                  in April 2012 (Coffey 
                                                                                  Mining). No site visit 
                    If no site visits                                             was conducted during 
                    have been undertaken                                          the recent 2015 Sadi 
                    indicate why this                                             South extension drilling 
                    is the case.                                                  campaign. However, 
                                                                                  based on previous 
                                                                                  site visit the consultant 
                                                                                  is familiar with geological 
                                                                                  setting and mineralisation 
                                                                                  style. 
                 -------------------------------------------------------------  ----------------------------------------------------------------- 
 Geological                                                                      The uranium mineralisation 
 interpretation     *    Confidence in (or conversely, the uncertainty of) the    generally forms shallow 
                         geological interpretation of the mineral deposit.        horizontal tabular 
                                                                                  bodies ranging in 
                                                                                  thickness from 1 to 
                    *    Nature of the data used and of any assumptions made.     12m hosted in weathered 
                                                                                  granite, granitic 
                                                                                  sediments, and calcrete. 
                    *    The effect, if any, of alternative interpretations on    Differentiation of 
                         Mineral Resource estimation.                             the weathered granite 
                                                                                  from granitic sediments 
                                                                                  is unreliable from 
                    *    The use of geology in guiding and controlling Mineral    AC sample returns. 
                         Resource estimation.                                     A purely geological 
                                                                                  model of the Tiris 
                                                                                  deposits has not been 
                   The factors affecting                                          produced. 
                   continuity both of                                             The material above 
                   grade and geology.                                             the top of ore is 
                                                                                  waste largely made 
                                                                                  of loose sandy material. 
                                                                                  The base of ore defines 
                                                                                  the top of consolidated 
                                                                                  material, harder going 
                                                                                  into unmineralized 
                                                                                  granite basement. 
                                                                                  Ore surfaces representing 
                                                                                  the top and base of 
                                                                                  the mineralisation 
                                                                                  using a grade cut-off 
                                                                                  of 100 ppm U308 were 
                                                                                  generated across all 
                                                                                  project areas and 
                                                                                  mineralised zones. 
                                                                                  The top and base of 
                                                                                  ore surfaces were 
                                                                                  used as hard boundaries 
                                                                                  to control grade estimation. 
                                                                                  A lower cut-off grade 
                                                                                  of 75 ppm U308 was 
                                                                                  used to model the 
                                                                                  Sadi South. Due to 
                                                                                  the nature of the 
                                                                                  mineralisation, the 
                                                                                  change in lower cut-off 
                                                                                  grade had marginal 
                                                                                  changes on the mineralised 
                                                                                  volumes. 
                                                                                  The grade varied significantly 
                                                                                  within the drill hole 
                                                                                  intersections. 
                                                                                  At the time that the 
                                                                                  estimates were completed, 
                                                                                  the natural topographical 
                                                                                  surface was not available. 
                                                                                  The 2012 drill data 
                                                                                  had no topographic 
                                                                                  survey data available. 
                                                                                  Most of the 2015 and 
                                                                                  2017 drill collar 
                                                                                  locations were surveyed 
                                                                                  using a Differential 
                                                                                  Global Positioning 
                                                                                  System (DGPS). The 
                                                                                  consultant used drill 
                                                                                  hole collars that 
                                                                                  had been located with 
                                                                                  the DGPS to create 
                                                                                  a wireframe representing 
                                                                                  the topographic surface. 
                                                                                  The elevations of 
                                                                                  all drill holes with 
                                                                                  no survey were then 
                                                                                  interpolated using 
                                                                                  the nearest neighbour. 
                                                                                  The interpretation 
                                                                                  of the mineralisation 
                                                                                  as flat lying tabular 
                                                                                  bodies was defined 
                                                                                  with high confidence 
                                                                                  by the top and base 
                                                                                  of ore surfaces. 
                                                                                  In some zones, pods 
                                                                                  of low-grade mineralisation 
                                                                                  occur showing moderate 
                                                                                  continuity of both 
                                                                                  grade and geology. 
                                                                                  The mineralisation 
                                                                                  is recent and unaffected 
                                                                                  by faulting. 
                 -------------------------------------------------------------  ----------------------------------------------------------------- 
 Dimensions       The extent and variability                                     The Mineral Resource 
                   of the Mineral Resource                                        as reported in the 
                   expressed as length                                            2011 Resource estimate 
                   (along strike or otherwise),                                   lie in the following 
                   plan width, and depth                                          areas, Sadi South, 
                   below surface to the                                           Sadi North, Marie, 
                   upper and lower limits                                         Hippolyte W, Hippolyte 
                   of the Mineral Resource.                                       E, Oum Ferkik West 
                                                                                  and Oum Ferkik East. 
                                                                                  Sadi South resource 
                                                                                  has since been updated 
                                                                                  following infill and 
                                                                                  extension drilling 
                                                                                  campaign in 2015. 
                                                                                  The Mineral Resources 
                                                                                  at a cut-off of 100 
                                                                                  ppm U3O8 was applied 
                                                                                  across all project's 
                                                                                  areas. 
                                                                                  Marie occurs in an 
                                                                                  area 1.2 km east-west 
                                                                                  and 6 km north-south. 
                                                                                  This region is comprised 
                                                                                  of six separate zones 
                                                                                  that range in plan 
                                                                                  dimensions from 200m 
                                                                                  to 1.2 km wide and 
                                                                                  500 m to 1.4km long. 
                                                                                  Hippolyte W occurs 
                                                                                  in an area 0.8 km 
                                                                                  east-west and 2.0 
                                                                                  km north-south. This 
                                                                                  region is comprised 
                                                                                  of three separate 
                                                                                  zones that range in 
                                                                                  plan dimensions from 
                                                                                  150m to 400m wide 
                                                                                  and 400 m to 1.0km 
                                                                                  long 
                                                                                  Hippolyte E occurs 
                                                                                  in an area 3.0 km 
                                                                                  east-west and 4.0 
                                                                                  km north-south. This 
                                                                                  region is comprised 
                                                                                  of three separate 
                                                                                  zones that range in 
                                                                                  plan dimensions from 
                                                                                  150m to 600m wide 
                                                                                  and 400 m to 600m 
                                                                                  long. 
                                                                                  Oum Ferkik West occurs 
                                                                                  as a single zone with 
                                                                                  dimensions of 1.6 
                                                                                  km east-west and 2.5 
                                                                                  km north-south. 
                                                                                  Oum Ferkik East occurs 
                                                                                  in an area 2.0 km 
                                                                                  east-west and 2.0 
                                                                                  km north-south. This 
                                                                                  region is comprised 
                                                                                  of six separate zones 
                                                                                  that range in plan 
                                                                                  dimensions from 150m 
                                                                                  to 400m wide and 400 
                                                                                  m to 1.2km long 
                                                                                  Mineralisation forms 
                                                                                  flat lying tabular 
                                                                                  bodies ranging in 
                                                                                  thickness from 1 to 
                                                                                  12m with some internal 
                                                                                  waste patches occurring 
                                                                                  within the mineralisation 
                                                                                  envelope. In places, 
                                                                                  there the top of mineralisation 
                                                                                  is covered by sand 
                                                                                  or waste overburden. 
                                                                                  Sadi North occurs 
                                                                                  in an area extending 
                                                                                  3.2 km east-west and 
                                                                                  4.0 km north-south. 
                                                                                  This region is comprised 
                                                                                  of six separate zones 
                                                                                  that range in plan 
                                                                                  dimensions from 100m 
                                                                                  to 800m wide and 300 
                                                                                  m to 1400m long. 
                                                                                  Sadi South has been 
                                                                                  updated with extension 
                                                                                  in the north-south 
                                                                                  trending zone extending 
                                                                                  approximately 2.5 
                                                                                  north-south and 1.4km 
                                                                                  east-west. 
                                                                                  Sadi South Mineral 
                                                                                  Resource was defines 
                                                                                  using a lower grade 
                                                                                  cut-off of 75ppm U3O8. 
                                                                                  Ore thickness varies 
                                                                                  from 1m to a maximum 
                                                                                  of 9.5m. 
                                                                                  . 
                 -------------------------------------------------------------  ----------------------------------------------------------------- 
 Estimation and                                                                       The uranium concentrations 
 modelling          *    The nature and appropriateness of the estimation              were estimated using 
 techniques              technique(s) applied and key assumptions, including           the Ordinary Kriging 
                         treatment of extreme grade values, domaining,                 estimation method. 
                         interpolation parameters, maximum distance of                 Sample database has 
                         extrapolation from data points.                               assays samples at 
                                                                                       a nominal 1m sample 
                                                                                       interval. Some samples 
                    *    The availability of check estimates, previous                 were sampled at 0.5m 
                         estimates and/or mine production records and whether          interval using overburden-ore 
                         the Mineral Resource estimate takes appropriate               contact depending 
                         account of such data.                                         on thickness of topsoil 
                                                                                       (sand). 
                                                                                       2m sample composite 
                    *    The assumptions made regarding recovery of                    were created for grade 
                         by-products.                                                  estimation. 
                                                                                       Area specific high-grade 
                                                                                       assays top cuts were 
                    *    Estimation of deleterious elements or other non-grade         applied to minimise 
                         variables of economic significance (e.g. sulphur for          grade spearing. The 
                         acid mine drainage characterisation).                         top-cut values were 
                                                                                       chosen by assessing 
                                                                                       the high-end distribution 
                    *    In the case of block model interpolation, the block           of the grade population 
                         size in relation to the average sample spacing and            within each zone and 
                         the search employed.                                          selecting the value 
                                                                                       at which the distribution 
                                                                                       became erratic 
                    *    Any assumptions behind modelling of selective mining          Each zone was divided 
                         units.                                                        into subzones for 
                                                                                       grade estimation. 
                                                                                       The subzones were 
                    *    Any assumptions about correlation between variables.          based on defined solid 
                                                                                       using a 100ppm lower 
                                                                                       U308 grade cut-off. 
                    *    Description of how the geological interpretation was          Each zone was coded 
                         used to control the resource estimates.                       and only samples within 
                                                                                       the same matching 
                                                                                       zone code were used 
                    *    Discussion of basis for using or not using grade              in estimation. Additional 
                         cutting or capping.                                           estimation parameters 
                                                                                       were applied as follows: 
                                                                                       A three-pass estimation 
                   The process of validation,                                          strategy was adopted 
                   the checking process                                                to estimate the U(3) 
                   used, the comparison                                                O(8) grades. The estimation 
                   of model data to drill                                              search parameters 
                   hole data, and use                                                  are shown below for 
                   of reconciliation                                                   estimation run pass 
                   data if available.                                                  1, 2 and 3. The short 
                                                                                       first axis of the 
                                                                                       search ellipse is 
                                                                                       vertical. 
                                                                                       Pass 1. 300x200x6m 
                                                                                       search, 8-24 samples 
                                                                                       Pass 2. 360x250x6m 
                                                                                       search, 6-24 samples 
                                                                                       Pass 3. 600x400x6m 
                                                                                       search, 4-24 samples 
                                                                                       In addition, upper 
                                                                                       cut-off grade specific 
                                                                                       to the ore zones were 
                                                                                       applied. 
                                                                                       Vanadium is a potential 
                                                                                       by-product and vanadium 
                                                                                       oxide ( V(2) O(5) 
                                                                                       ) has been estimated 
                                                                                       for the mineral resources 
                                                                                       using the stoichiometric 
                                                                                       V(2) O(5) /U(3) O(8) 
                                                                                       ratio for carnotite 
                                                                                       group minerals. These 
                                                                                       V(2) O(5) values represent 
                                                                                       potentially recoverable 
                                                                                       vanadium in carnotite 
                                                                                       and not total vanadium 
                                                                                       occurring in mineralisation, 
                                                                                       which is significantly 
                                                                                       higher in almost all 
                                                                                       cases. These potentially 
                                                                                       recoverable V(2) O(5) 
                                                                                       values are based on 
                                                                                       the analysis of a 
                                                                                       substantial database 
                                                                                       of available sample 
                                                                                       data and represent 
                                                                                       average values that 
                                                                                       may be conservative. 
                                                                                       This procedure relies 
                                                                                       on the correlation 
                                                                                       between uranium and 
                                                                                       vanadium in carnotite 
                                                                                       group minerals, which 
                                                                                       are the only uranium 
                                                                                       minerals identified 
                                                                                       to date at Tiris. 
                                                                                       No deleterious elements 
                                                                                       or other non-grade 
                                                                                       variables of economic 
                                                                                       significance have 
                                                                                       been identified or 
                                                                                       estimated. 
                                                                                       In Sadi South 2021 
                                                                                       Mineral Resource update, 
                                                                                       Inverse Distance -Power 
                                                                                       2 (ID2) estimation 
                                                                                       method was used as 
                                                                                       no reliable variogram 
                                                                                       structure could be 
                                                                                       defined partly due 
                                                                                       to the limited drill 
                                                                                       data and variability 
                                                                                       U308 in grade. An 
                                                                                       alternate estimation 
                                                                                       would not produce 
                                                                                       material different 
                                                                                       outcome. 
                                                                                       In Sadi South Mineral 
                                                                                       Resource update sample 
                                                                                       grade values up to 
                                                                                       2,500ppm U308 were 
                                                                                       reported. 2m composite 
                                                                                       samples were used 
                                                                                       in the grade estimation. 
                                                                                       An upper cut-off grade 
                                                                                       of 850ppm U308 was 
                                                                                       applied on the composite 
                                                                                       before estimation. 
                                                                                       Very few (< 4) samples 
                                                                                       were cut. 
                                                                                       Vanadium resource 
                                                                                       was estimated using 
                                                                                       the stoichiometric 
                                                                                       V(2) O(5) /U(3) O(8) 
                                                                                       ratio for carnotite 
                                                                                       group minerals as 
                                                                                       discussed above 
                                                                                       Drill hole drill spacing 
                                                                                       is generally regular 
                                                                                       grid approximately 
                                                                                       100x 200m over 2.5 
                                                                                       x1.4km 
                                                                                       Parent block model 
                                                                                       size was 50 x 50x 
                                                                                       2m 
                                                                                       Sub-block size 5 x 
                                                                                       5 x 0.5m 
                                                                                       The vertical dimension 
                                                                                       was chosen to reflect 
                                                                                       the anisotropy of 
                                                                                       the mineralisation 
                                                                                       and the downhole data 
                                                                                       spacing. 
                                                                                       A three-pass search 
                                                                                       strategy was used 
                                                                                       to estimate the U(3) 
                                                                                       O(8) grades in Sadi 
                                                                                       South 2021 Mineral 
                                                                                       Resource update. Each 
                                                                                       pass required a minimum 
                                                                                       number of samples 
                                                                                       with data from a minimum 
                                                                                       number of samples 
                                                                                       in the search ellipse 
                                                                                       to be populated with 
                                                                                       discretistion 5x5x2. 
                                                                                       The search criteria 
                                                                                       are shown below. The 
                                                                                       short first axis of 
                                                                                       the search ellipse 
                                                                                       is vertical. 
                                                                                       Pass 1. 250x250x12m 
                                                                                       search, 12-24 samples 
                                                                                       Pass 2. 350x350x12m 
                                                                                       search, 8-24 samples 
                                                                                       Pass 3. 500x500x12m 
                                                                                       search, 6-24 samples 
                                                                                       Sadi South Mineral 
                                                                                       Resource update increased 
                                                                                       in resource volume 
                                                                                       due to additional 
                                                                                       lateral extension 
                                                                                       on the Sadi South 
                                                                                       mineralisation. 
                                                                                       Block model grade 
                                                                                       estimates were validated 
                                                                                       using the following 
                                                                                       methods: 
                                                                                        *    Statistical comparison of block model grades against 
                                                                                             drill composite grades by zone 
 
 
                                                                                        *    Visual check of cross sections, transverse, and long 
                                                                                             sections 
 
 
                                                                                        *    Plan views of grade distribution 
 
 
                                                                                       Comparison of block 
                                                                                       model and drill data 
                                                                                       grade distribution 
                                                                                       using histograms 
                 -------------------------------------------------------------  ----------------------------------------------------------------- 
 Moisture         Whether the tonnages                                           Tonnages are estimated 
                   are estimated on a                                             on a dry weight basis. 
                   dry basis or with                                              The moisture constant 
                   natural moisture,                                              was not determined. 
                   and the method of 
                   determination of the 
                   moisture content. 
                 -------------------------------------------------------------  ----------------------------------------------------------------- 
 Cut-off          The basis of the                                               A cut-off of 100 ppm 
 parameters        adopted cut-off grade(s)                                       U(3) O(8) cut off 
                   or quality parameters                                          is used to report 
                   applied.                                                       the resources as it 
                                                                                  is assumed that ore 
                                                                                  can be economically 
                                                                                  mined at this grade 
                                                                                  in an open pit scenario. 
                                                                                  This cut-off is considered 
                                                                                  to be relatively low 
                                                                                  compared to operating 
                                                                                  uranium mines, but 
                                                                                  metallurgical test 
                                                                                  work indicates that 
                                                                                  a significant upgrade 
                                                                                  in uranium and decrease 
                                                                                  in sulphates can be 
                                                                                  achieved by a simple 
                                                                                  Mineralisation occurs 
                                                                                  as a Uranium vanadate 
                                                                                  mineral and there 
                                                                                  is potential of recovery 
                                                                                  of vanadium as by 
                                                                                  product which justifies 
                                                                                  a lower U308 grade 
                                                                                  cut-off based on information 
                                                                                  supplied to the Consultant 
                                                                                  following recent leaching 
                                                                                  test work on the Tiris 
                                                                                  Uranium Project on 
                                                                                  uranium and Vanadium. 
                 -------------------------------------------------------------  ----------------------------------------------------------------- 
 Mining factors                                                                  The resources reported 
 or                 *    Assumptions made regarding possible mining methods,      here have been estimated 
 assumptions             minimum mining dimensions and internal (or, if           on the assumption 
                         applicable, external) mining dilution. It may not        that the deposits 
                         always be possible to make assumptions regarding         will be mined by open 
                         mining methods and parameters when estimating Mineral    pit mining method. 
                         Resources. Where no assumptions have been made, this     Analysis was done 
                         should be reported.                                      for grade continuity 
                                                                                  and variography. However, 
                                                                                  in some cases, no 
                                                                                  reliable variogram 
                                                                                  structure could defined 
                                                                                  on a zone by zone 
                                                                                  basis. The global 
                                                                                  variogram was assumed 
                                                                                  as this could have 
                                                                                  been affected by lack 
                                                                                  of data due to limited 
                                                                                  extend of the individual 
                                                                                  mineralised zones. 
                                                                                  Parent block model 
                                                                                  size was 50 x 50x 
                                                                                  2m 
                                                                                  Sub-block size 5 x 
                                                                                  5 x 0.5m 
                                                                                  The selected sub-blocks 
                                                                                  were appropriate for 
                                                                                  minimum selective 
                                                                                  mining unit. 
                 -------------------------------------------------------------  ----------------------------------------------------------------- 
 Metallurgical    The basis for assumptions                                      The metallurgical 
 factors           or predictions regarding                                       test work information 
 or assumptions    metallurgical amenability.                                     supplied to the consultant 
                   It may not always                                              is based on reports 
                   be possible to make                                            by H&SC which indicates 
                   assumptions regarding                                          that the Tiris deposits 
                   metallurgical treatment                                        are amenable to a 
                   processes and parameters                                       process of crushing, 
                   when reporting Mineral                                         screening and an alkaline 
                   Resources. Where no                                            carbonate leach in 
                   assumptions have been                                          order to recover uranium. 
                   made, this should                                              Bench scale test work 
                   be reported.                                                   indicates that a significant 
                                                                                  upgrade in uranium 
                                                                                  and decrease in sulphate 
                                                                                  concentrations can 
                                                                                  be achieved through 
                                                                                  screening. 
                                                                                  No penalty elements 
                                                                                  identified in work 
                                                                                  done to date. 
 
                                                                                  No other assumptions 
                                                                                  have been made. 
 
                                                                                  Metallurgical test 
                                                                                  work on Tiris ore 
                                                                                  has shown that about 
                                                                                  55% to 58% of vanadium 
                                                                                  was also extracted 
                                                                                  during the alkaline 
                                                                                  leach. The V(2) O(5) 
                                                                                  /U(3) O(8) ratios 
                                                                                  for the final leach 
                                                                                  liquor are close to 
                                                                                  the carnotite V(2) 
                                                                                  O(5) /U(3) O(8) ratio, 
                                                                                  indicating that effectively 
                                                                                  only vanadium from 
                                                                                  carnotite is being 
                                                                                  leached under these 
                                                                                  conditions. To date, 
                                                                                  no vanadium extraction 
                                                                                  test work has been 
                                                                                  carried out for the 
                                                                                  recovery of vanadium 
                                                                                  from the pregnant 
                                                                                  leach solution, so 
                                                                                  further work is required 
                                                                                  to demonstrate that 
                                                                                  a marketable vanadium 
                                                                                  product can be produced 
                                                                                  on a commercial basis. 
                                                                                  No further assumptions 
                                                                                  have been made. 
 
                                                                                  Final confirmation 
                                                                                  of metallurgical parameters 
                                                                                  were defined on bulk 
                                                                                  composite samples 
                                                                                  sourced from metallurgical 
                                                                                  trenching program 
                                                                                  undertaken in 2018 
                                                                                  and forming the source 
                                                                                  for Feasibility Study 
                                                                                  metallurgical test 
                                                                                  work. Metallurgical 
                                                                                  test work on 1t composite 
                                                                                  samples representative 
                                                                                  of metallurgical domains 
                                                                                  from the Lazare North 
                                                                                  and Lazare South Resources 
                                                                                  were processed using 
                                                                                  1m rotary scrubber 
                                                                                  and production scale 
                                                                                  Derrick screen at 
                                                                                  Mintek South Africa 
                                                                                  (refer ASX announcement 
                                                                                  23(rd) June 2023). 
                                                                                  Concentrate product 
                                                                                  from these tests were 
                                                                                  processed at ANSTO 
                                                                                  Minerals, Sydney using 
                                                                                  leaching, ion exchange 
                                                                                  and precipitation 
                                                                                  conditions defined 
                                                                                  within the process 
                                                                                  design criteria. Final 
                                                                                  Uranium Oxide Concentrate 
                                                                                  (UOC) was produced 
                                                                                  within ASTM standard 
                                                                                  limits (C967-20) without 
                                                                                  penalty and limits 
                                                                                  without rejection. 
                 -------------------------------------------------------------  ----------------------------------------------------------------- 
 Environmental                                                                   Aura completed an 
 factors            *    Assumptions made regarding possible waste and process    Environmental and 
 or assumptions          residue disposal options. It is always necessary as      Social Impact Assessment 
                         part of the process of determining reasonable            which concluded there 
                         prospects for eventual economic extraction to            are no known issues 
                         consider the potential environmental impacts of the      arising from native 
                         mining and processing operation. While at this stage     title, historical 
                         the determination of potential environmental impacts,    sites, environmental 
                         particularly for a greenfields project, may not          or third party matters 
                         always be well advanced, the status of early             which are likely to 
                         consideration of these potential environmental           materially affect 
                         impacts should be reported. Where these aspects have     exploitation. The 
                         not been considered this should be reported with an      consultant therefore 
                         explanation of the environmental assumptions made.       assumes that there 
                                                                                  are no known unusual 
                                                                                  aspects of the Tiris 
                                                                                  Uranium deposits that 
                                                                                  may lead to adverse 
                                                                                  environmental impacts 
                                                                                  beyond what is expected 
                                                                                  from a mining operation. 
                                                                                  Waste rock and process 
                                                                                  residue is expected 
                                                                                  to be disposed of 
                                                                                  in the areas surrounding 
                                                                                  the deposits and processing 
                                                                                  facility. 
                 -------------------------------------------------------------  ----------------------------------------------------------------- 
 Bulk density     Whether assumed or                                             The Mineral Resource 
                   determined. If assumed,                                        estimates for Sadi 
                   the basis for the                                              North Marie, Hippolyte 
                   assumptions. If determined,                                    W, Oum Ferkik West 
                   the method used, whether                                       and Oum Ferkik East 
                   wet or dry, the frequency                                      used an average density 
                   of the measurements,                                           of 2.0/g/cc dry bulk 
                   the nature, size,                                              density based on test 
                   and representativeness                                         done by Aura Energy. 
                   of the samples.                                                This was considered 
                                                                                  realistic for material 
                                                                                  and ore similar ore 
                                                                                  deposits. 
                                                                                  In the August 2021 
                                                                                  Sadi South resource 
                                                                                  update, an average 
                                                                                  density value of 2.1g/cc 
                                                                                  dry bulk density was 
                                                                                  applied based on previous 
                                                                                  work as reported by 
                                                                                  H & SC Consultants 
                 -------------------------------------------------------------  ----------------------------------------------------------------- 
 Classification                                                                       The Mineral Resource 
                     *    The basis for the classification of the Mineral             estimates for Sadi 
                          Resources into varying confidence categories.               South, Marie, Hippolyte 
                                                                                      W, Oum Ferkik West 
                                                                                      and Oum Ferkik East 
                     *    Whether appropriate account has been taken of all           were based on: 
                          relevant factors (i.e., relative confidence in               *    Drill hole drill grid spacing 
                          tonnage/grade estimations, confidence in continuity 
                          of geology and metal values, quality, quantity, and 
                          distribution of the data).                                   *    Mineralisation and grade continuity 
 
 
                    Whether the result                                                 *    The grade estimation search pass used to estimate the 
                    appropriately reflects                                                  block. 
                    the Competent Person's 
                    view of the deposit. 
                                                                                      All mineral Resource 
                                                                                      estimates estimated 
                                                                                      in 2011 were classified 
                                                                                      as Inferred. 
                                                                                      In Sadi South Mineral 
                                                                                      Resource estimate 
                                                                                      reported in August 
                                                                                      2021, there was moderate 
                                                                                      confidence where the 
                                                                                      resource is coherent 
                                                                                      and grade estimated 
                                                                                      search pass one and 
                                                                                      the resource was classified 
                                                                                      as Indicated. Mineral 
                                                                                      Resource estimated 
                                                                                      in pass two and three 
                                                                                      were classified as 
                                                                                      Inferred. 
                                                                                      Regions where grade 
                                                                                      was assigned an average 
                                                                                      grade due to insufficient 
                                                                                      drill data or isolated 
                                                                                      drill holes were not 
                                                                                      classified. 
                 -------------------------------------------------------------  ----------------------------------------------------------------- 
 Audits or        The results of any                                             This Mineral Resource 
 reviews           audits or reviews                                              estimates for Sadi 
                   of Mineral Resource                                            North, Marie, Hippolyte 
                   estimates.                                                     W, Oum Ferkik West 
                                                                                  and Oum Ferkik east 
                                                                                  are based on 2011 
                                                                                  models and these were 
                                                                                  reviewed internally 
                                                                                  by Coffey Mining Consultants. 
                                                                                  No material issues 
                                                                                  were identified as 
                                                                                  a result of these 
                                                                                  reviews. 
                                                                                  However, no audit 
                                                                                  for August 2021 Sadi 
                                                                                  South Mineral Resource 
                                                                                  update has been completed 
                                                                                  by other external 
                                                                                  party. 
                 -------------------------------------------------------------  ----------------------------------------------------------------- 
 Discussion of                                                                   The relative accuracy 
 relative           *    Where appropriate a statement of the relative            and confidence level 
 accuracy/               accuracy and confidence level in the Mineral Resource    in the Mineral Resource 
 confidence              estimate using an approach or procedure deemed           estimates are in line 
                         appropriate by the Competent Person. For example, the    with the generally 
                         application of statistical or geostatistical             accepted accuracy 
                         procedures to quantify the relative accuracy of the      and confidence of 
                         resource within stated confidence limits, or, if such    the nominated JORC 
                         an approach is not deemed appropriate, a qualitative     CODE (2012) Mineral 
                         discussion of the factors that could affect the          Resource categories. 
                         relative accuracy and confidence of the estimate.        This has been determined 
                                                                                  on both qualitative 
                                                                                  and quantitative basis. 
                    *    The statement should specify whether it relates to       The main factor that 
                         global or local estimates, and, if local, state the      affects the relative 
                         relevant tonnages, which should be relevant to           accuracy and confidence 
                         technical and economic evaluation. Documentation         of the Mineral Resource 
                         should include assumptions made and the procedures       estimate is sample 
                         used.                                                    data density and high 
                                                                                  variability in uranium 
                                                                                  grades. Confidence 
                    *    These statements of relative accuracy and confidence     in mineralisation 
                         of the estimate should be compared with production       continuity is moderate. 
                         data, where available.                                   Most blocks were estimated 
                                                                                  in estimation run 
                                                                                  pass 1 and 2. 
                                                                                  In regions where the 
                                                                                  geology and mineralisation 
                                                                                  are continuous and 
                                                                                  grade was estimated 
                                                                                  in estimation run 
                                                                                  pass 1, the confidence 
                                                                                  in the grade estimates 
                                                                                  is high and the resource 
                                                                                  was classified as 
                                                                                  indicated. The rest 
                                                                                  of the resource estimated 
                                                                                  was classified as 
                                                                                  inferred. 
                                                                                  Some blocks were not 
                                                                                  estimated due to insufficient 
                                                                                  drill data particularly 
                                                                                  at the margins of 
                                                                                  the mineralised pods. 
                                                                                  Block not estimated 
                                                                                  in were assigned an 
                                                                                  average grade and 
                                                                                  these blocks were 
                                                                                  not classified. 
                                                                                  The estimates are 
                                                                                  global, and the resources 
                                                                                  classified as Indicated 
                                                                                  are suitable for long 
                                                                                  term mine planning 
                                                                                  studies. It should 
                                                                                  be noted that the 
                                                                                  Indicated Resources 
                                                                                  are based on broadly 
                                                                                  spaced data and may 
                                                                                  be locally inaccurate. 
                                                                                  Closer spaced drilling 
                                                                                  is necessary prior 
                                                                                  to detailed mine planning 
                                                                                  studies to increase 
                                                                                  confidence in the 
                                                                                  mineralisation variability. 
                                                                                  There is no record 
                                                                                  available of historical 
                                                                                  production data as 
                                                                                  only small scale illegal 
                                                                                  artisanal mining has 
                                                                                  occurred around the 
                                                                                  Tiris deposits. 
                 -------------------------------------------------------------  ----------------------------------------------------------------- 
 

[1] ASTM C967-20, "Standard Specification for Uranium Ore Concentrate"

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

MSCUPGWWPUPPUMQ

(END) Dow Jones Newswires

December 06, 2022 02:51 ET (07:51 GMT)

Aura Energy (LSE:AURA)
Historical Stock Chart
From Jul 2024 to Aug 2024 Click Here for more Aura Energy Charts.
Aura Energy (LSE:AURA)
Historical Stock Chart
From Aug 2023 to Aug 2024 Click Here for more Aura Energy Charts.