Talisman Energy Inc.



Talisman Energy (UK) Limited, a wholly owned subsidiary of Talisman Energy Inc.,
has commenced production from the Blane field.

The Blane field was discovered in 1989 and Talisman has a 43% interest. The
Company drilled two horizontal development wells in 2006, which are expected to
produce at a peak rate of 17,000 boe/d. An injection well will be drilled in the
fourth quarter of 2007. Oil will be transported via the Ula Tambar System and
Norpipe pipeline network to Teeside, UK.

The Blane reservoir is located 160 miles east of Aberdeen and straddles the UK
and Norwegian sectors of the North Sea. The Blane development wells in the UK
sector are tied back by pipeline to the Ula Platform in the Norwegian sector.

Blane is in UKCS Block 30/3a and NCS Block 1/2 (unitized at 82% and 18%,
respectively). Talisman Energy (UK) Limited operates the Blane Field (25%) along
with its partners Talisman Energy Norge AS (18.0%), ENI UK Limited (13.9%), ENI
ULX Limited (4.1%), MOC Exploration (U.K.) Limited (a subsidiary of Nippon Oil
Corporation) (14.0%), Bow Valley Petroleum (U.K.) Limited (12.5%) and Roc Oil
(GB) Limited (12.5%).

Talisman Energy Inc. is an independent upstream oil and gas company
headquartered in Calgary, Alberta, Canada. Talisman has operations in Canada and
its subsidiaries operate in the North Sea, Southeast Asia, Australia, North
Africa, the United States and Trinidad and Tobago. Talisman's subsidiaries are
also active in a number of other international areas. Talisman is committed to
conducting its business in an ethically, socially and environmentally
responsible manner. The Company is a participant in the United Nations Global
Compact and included in the Dow Jones Sustainability (North America) Index, as
well as the Jantzi Social Index. Talisman's shares are listed on the Toronto
Stock Exchange in Canada and the New York Stock Exchange in the United States
under the symbol TLM.

For further information, please contact:

David Mann, Senior Manager, Corporate                   Christopher J. LeGallais
        & Investor Communications                       Senior Manager, Investor Relations
Phone: 403-237-1196 Fax: 403-237-1210                   Phone: 403-237-1957 Fax: 403-237-1210
E-mail: tlm@talisman-energy.com                         Email: tlm@talisman-energy.com

27-07

Forward-Looking Statements

This news release contains statements that constitute forward-looking statements
or forward-looking information (collectively "forward-looking statements")
within the meaning of applicable securities legislation. These forward-looking
statements include statements regarding: peak production estimates from the
Blane field; drilling plans; transportation plans; and other expectations,
beliefs, plans, goals, objectives, assumptions, information and statements about
possible future events, conditions, results of operations or performance.

Often, but not always, forward-looking statements use words or phrases such as:
"expects," "does not expect" or "is expected," "anticipates" or "does not
anticipate," "plans" or "planned," "estimates" or "estimated," "projects" or
"projected," "forecasts" or "forecasted," "believes," "intends," "likely,"
"possible," "probable," "scheduled," "positioned," "goals," or "objectives" or
state that certain actions, events or results "may," "could," "would," "might"
or "will" be taken, occur or be achieved.

Undue reliance should not be placed on forward-looking statements.
Forward-looking statements are based on current expectations, estimates and
projections that involve a number of risks and uncertainties, which could cause
actual results to differ materially from those anticipated by Talisman and
described in the forward-looking statements. These risks and uncertainties
include:

* the risks of the oil and gas industry, such as operational risks in exploring
for, developing and producing crude oil and natural gas, market demand and
unpredictable facilities outages;

* risks and uncertainties involving geology of oil and gas deposits;

* the uncertainty of reserves estimates, reserves life and underlying reservoir
risk;

* the uncertainty of estimates and projections relating to production, costs and
expenses;

* potential delays or changes in plans with respect to development projects;

* risk that adequate pipeline capacity to transport the gas to market may not be
available;

* health, safety and environmental risks;

* changes to general economic and business conditions;

* the possibility that government policies or laws may change or governmental
approvals may be delayed or withheld; and

* the Company's ability to implement its business strategy.

Readers are cautioned that the foregoing list of risks and uncertainties is not
exhaustive. Additional information on these and other factors which could affect
the Company's operations or financial results are included: (1) under the
heading "Risk Factors" in the Company's Annual Information Form; and (2) under
the headings "Management's Discussion and Analysis - Risk Factors" and elsewhere
in the Company's 2006 Annual Financial Report. Additional information may be
found in the Company's other reports on file with Canadian securities regulatory
authorities and the United States Securities and Exchange Commission.

Forward-looking statements are based on the estimates and opinions of the
Company's management at the time the statements are made. The Company assumes no
obligation to update forward-looking statements should circumstances or
management's estimates or opinions change, except as required by law.

Gross Production

In this news release, Talisman makes reference to estimated production volumes.
Such production volumes are estimated on a gross basis, which means they are
estimated prior to the deduction of royalties and similar payments. In the US,
net production volumes are reported after the deduction of these amounts.

Boe conversion

In this news release, the calculation of barrels of oil equivalent (boe) is
calculated at a conversion rate of six thousand cubic feet (mcf) of natural gas
for one barrel of oil and is based on an energy equivalence conversion method.
Boes may be misleading, particularly if used in isolation. A boe conversion
ratio of 6 mcf:1 bbl is based on an energy equivalence conversion method
primarily applicable at the burner tip and does not represent a value
equivalence at the wellhead.


Citi Fun 25 (LSE:AN26)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Citi Fun 25 Charts.
Citi Fun 25 (LSE:AN26)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Citi Fun 25 Charts.