Tembo Gold Reports Shallow RC Drill Hole TRC0003 at Ngula 1 Target With 4.73 g/t Gold Over 23.00 Metres, Including 28.57 g/t ...
January 30 2013 - 7:28AM
Marketwired Canada
Tembo Gold Corp. (TSX VENTURE:TEM)(OTCQX:TBGPF)(FRANKFURT:T23) ("Tembo" or the
"Company") is pleased to report the results from the first of a planned series
of close-spaced drill holes at the Ngula 1 target at its Tembo Gold Project in
the Lake Victoria goldfield of Tanzania. Hole TRC0003 was drilled to test the
lateral continuity of a wide zone of mineralization previously intersected and
reported (March 13th, 2012) in diamond drill hole, TDD0004, which returned, 3.13
g/t gold over 25.89m.
It is interpreted that in a 150m wide east-west structural corridor at Ngula 1,
there are at least two wide structural deformation zones that host
mineralization. Drill holes TRC003 and TDD0004 intersected the zone that is
interpreted as the large structure in the southern half of the structural
corridor at Tembo. Meanwhile, hole TDD0041, reported January 15th, 2013, which
was the first deep hole at Ngula 1, returned 22.81 g/t gold over 15.00m at a
downhole depth of 299m, and is interpreted to have intersected the large
structure in the northern half of this structural corridor.
Highlights of the latest drill results include:
-- TRC0003: 4.73 g/t gold over 23.00m from a downhole depth of 54.00m
including 28.57 g/t gold over 3.00m and 5.28 g/t gold over 4.00m.
Tembo Gold President & CEO, David Scott stated: "This drill hole is the first
close-spaced hole drilled at Ngula 1 that is designed to test the continuity of
the mineralized zones intersected in the 2012 drilling campaign. The planned
series of closer-spaced drill holes will provide us with the density of data we
require to enable us to undertake geological modeling and resource definition.
The widths and grades encountered in this hole, that correlate well with hole
TDD0004, are at a shallow depth and suggest that a resource may be defined at
Ngula 1 that could be considered for open pit exploitation. The results also
show that where the shear structures are mineralized with gold, there is
typically a high-grade core to the mineralization. This implies that there is
potential to identify deeper high-grade resources in the future that could be
economically exploited by an underground operation."
The results of hole TRC0003 are presented in Table 1, and are shown on Figure 1
together with highlights from previous Ngula 1 drilling results.
Ngula 1 Target
The Ngula 1 target consists of a 600m long, 150-200m wide corridor of massive
and locally intensely sheared mafic meta-volcanic rocks bounded to the north and
south by thin meta-sedimentary units. This package contains numerous intense
shear structures that typically have elevated gold values. Based on the
structural intersections achieved to date, the current interpretation is that
the corridor of deformed meta-volcanic rocks contains two wide shear zones, one
in the northern half and one in the southern half. A single section through the
package may host as many as 5-10 such structures ranging in width from less than
one metre to several tens of metres. The structures are predominantly steeply
north dipping and are thought to represent sub-parallel and often
interconnecting splays and subsidiary structures to the principle east-west
shears, with secondary cross-cutting northwest and northeast structures also
present. Zones of intersection and convergence are considered to be the favoured
location for wider zones of mineralization and higher grade. Gold mineralization
is closely associated with quartz veining, alteration and disseminated
sulphides, which include dominant pyrrhotite, and lesser pyrite and
chalcopyrite. The stronger and more sulphide rich structures (pyrrhotite) are
interpreted to correspond closely to lineaments that are evident in the
structural interpretation of magnetic imagery.
Significant drill results have been returned to date at Ngula 1 and these are
available in earlier Press Releases (March 13, 2012; June 7, 2012; September 26,
2012 and January 16, 2013). The drilling program consists of alternating
100m-spaced diamond and reverse circulation drill hole sections drilled from the
south to test the zone at vertical depths down to -200m, and 100m-spaced diamond
hole drill sections drilled from the north to similar depths. Recent deeper
drilling has intersected wide zones of high-grade gold mineralization at a
vertical depth of approximately 250m. The lateral and vertical drill spacing of
existing holes does not permit a detailed structural interpretation or
correlation between all drill holes to be undertaken. In order to commence
resource definition, closer-spaced drilling will be undertaken throughout 2013
to improve confidence in the geological interpretation. Drillhole TRC0003 is the
first of these close-spaced drill holes to be reported.
Table 1: Tembo Project, Ngula 1 Target, RC Drill Results as of January 30, 2012
----------------------------------------------------------------------------
BH ID From To Width (m) Gold g/t Width Gold g/t Width (m) Gold g/t
----------------------------------------------------------------------------
TRC0003 21.00 22.00 1.00 1.89 2.00 3.76
22.00 23.00 1.00 5.63
----------------------------------------------------------------------------
54.00 55.00 1.00 77.90 23.00 4.73 3.00 28.57
55.00 56.00 1.00 5.68
56.00 57.00 1.00 2.13
-------------------
57.00 58.00 1.00 0.19
58.00 59.00 1.00 0.06
59.00 60.00 1.00 0.11
60.00 61.00 1.00 0.19
61.00 62.00 1.00 0.13
62.00 63.00 1.00 0.08
63.00 64.00 1.00 0.05
64.00 65.00 1.00 0.05
65.00 66.00 1.00 0.14
66.00 67.00 1.00 0.13
67.00 68.00 1.00 0.03
68.00 69.00 1.00 0.10
69.00 70.00 1.00 0.02
70.00 71.00 1.00 0.03
71.00 72.00 1.00 0.21
72.00 73.00 1.00 1.13
-------------------
73.00 74.00 1.00 5.55 4.00 5.28
74.00 75.00 1.00 2.74
75.00 76.00 1.00 11.70
76.00 77.00 1.00 0.46
----------------------------------------------------------------------------
Notes:
1. Widths represent drill intersection widths not corrected for drill hole
inclination and dip of the geological zone. True widths have not been
determined. The drill hole inclination of 60deg and sub vertical dip of
the structures suggests that the true width will be approximately 50% of
the intersected width.
2. Drill holes have not been drilled in numerical sequence and not all
drill holes in a sequence have necessarily been drilled. Drill hole
numbers represent the original drill hole identification assigned when
planned.
3. No capping of high-grade values has been applied to the assay results.
To view "Figure 1. Ngula 1 Highlight Drill Results," please visit the following
link: http://media3.marketwire.com/docs/Figure1Ngula.pdf.
Table 2: Tembo Project, Ngula 1 Target, Drill Hole Collar Coordinates, Drill
Hole Inclination and Azimuth, and Depth for the Latest Drill Hole TRC0013
Hole ID Easting Northing Elevation Azimuth Dip EOH
TRC0013 436800 9647165 1243 000 -60 250.00
QA/QC
A stringent QA/QC practice is being applied to all sample batches. A Verified
Reference Material standard is inserted every 20th sample, a known blank or
blank standard every 20th sample and all samples with assays greater than 0.5
g/t gold are re-assayed. 1% of all samples are submitted to an alternative
laboratory for check analysis. In addition the laboratory adheres to an internal
QA/QC procedure including standard samples and repeats and blanks inserted
independently.
The above information has been prepared under the supervision of David Scott,
Pr. Sci. Nat., who is designated as a "Qualified Person" with the ability and
authority to verify the authenticity and validity of the data.
About Tembo Gold Corp.
Tembo Gold (TSX VENTURE:TEM) is a Canadian publicly listed mineral exploration
company focused on the exploration and development of gold projects in Tanzania
and the rest of Africa. The Company currently has 100% interest in the Tembo
Gold Project that is located adjacent to African Barrick's Bulyanhulu Mine in
the prolific Lake Victoria Greenstone belt in Tanzania. The company is led by a
highly experienced team with a proven history of developing, financing, and
operating mining projects in Africa.
On Behalf of the Board of Directors of Tembo,
David Scott, President & CEO
Forward-Looking Statements
Certain information set out in this news release constitutes forward-looking
information. Forward looking statements are often, but not always, identified by
the use of words such as "seek", "anticipate", "plan", "continue", "estimate",
"expect", "may", "will", "intend", "could", "might", "should", "believe" and
similar expressions. In particular, this news release contains forward-looking
statements in respect of the use of the net proceeds from the Private Placement,
the completion and timing of additional closings of the Non-Brokered Private
Placement, the payment of certain finders' fees and the listing of the Common
Shares on the TSXV. Forward-looking statements are based upon the opinions and
expectations of management of the Company as at the effective date of such
statements and, in certain cases, information provided or disseminated by third
parties. Although the Company believes that the expectations reflected in such
forward-looking statements are based upon reasonable assumptions, and that
information obtained from third party sources is reliable, they can give no
assurance that those expectations will prove to have been correct. With respect
to forward-looking statements contained in this news release, the Company has
made assumptions regarding, among other things, the ability to develop the
Company's properties, the economic climate in the jurisdictions where the
Company carries on operations and commodity prices. Although the Company
believes that the expectations reflected in the forward-looking statements
contained in this document, and the assumptions on which such forward-looking
statements are made, are reasonable, there can be no assurance that such
expectations will prove to be correct. Readers are cautioned not to place undue
reliance on forward-looking statements included in this document, as there can
be no assurance that the plans, intentions or expectations upon which the
forward-looking statements are based will occur. By their nature,
forward-looking statements involve numerous assumptions, known and unknown risks
and uncertainties that contribute to the possibility that the predictions,
forecasts, projections and other forward-looking statements will not occur,
which may cause actual results in future periods to differ materially from any
estimates or projections of future performance or results expressed or implied
by such forward-looking statements. These risks and uncertainties include, among
other things, a significant drop in the price of gold, political turmoil in
Tanzania and other risk factors set forth in the Company's continuous
disclosure. Readers are cautioned that this list of risk factors should not be
construed as exhaustive. These statements are made as at the date hereof and
unless otherwise required by law, the Company does not intend, or assume any
obligation, to update these forward-looking statements.
FOR FURTHER INFORMATION PLEASE CONTACT:
Apex Capital Inc.
Brett Allan
416.907.4148
ballan@apexcap.ca
Tembo Gold Corp.
Marc Cernovitch
Director & VP Business Development
416.619.9010
mcernovitch@tembogold.com
Tembo Gold (TSXV:TEM)
Historical Stock Chart
From Dec 2024 to Jan 2025
Tembo Gold (TSXV:TEM)
Historical Stock Chart
From Jan 2024 to Jan 2025