MENA Hydrocarbons Inc. ("MENA" or the "Company") (TSX VENTURE:MNH) is pleased to
announce an operations update for Lagia oil field development in Egypt.


Signature of rig contract for drilling and workover

MENA has signed a contract with Petroservices Drilling Overseas (PSDO) of Egypt
for the rental of their 750 HP rig Shams 1 in order to commence operations on
its Lagia oil field development in Egypt. The six well programme consists of
working over two existing wells, the drilling of two development wells and
drilling a further two appraisal wells, one of them contingent. The recently
built rig is on its way from Tian Jin in China and expected to arrive in Egypt
in the first half of February for commencement of operations in the Lagia
license.


MENA has finalised all other work programmes and service contracts to commence
work over and drilling operations. The existing Lagia 6 and 7 wells are expected
to be completed with a subsurface pump whereafter two development wells and two
appraisal wells are planned to be drilled to the top of the Thebes formation at
around 1500 ft. The development wells will be completed with thermal casing in
order to facilitate steam injection as part of a cyclic steam soak pilot project
and fitted with a sucker rod pump. A contract for the rental of a 24 MM BTU
steam plant is currently being negotiated. Temporary Production facilities for
the pilot phase are planned to be rented from Sigma Petroleum Services enabling
Installation in line with drilling activities. The produced oil will be
transported by road tanker to the production facilities of the General Petroleum
Company (GPC) at Ras Gharib. First routine production is expected in the second
quarter of 2012.


Lagia Oil Field

MENA is the sole owner of the Lagia Development Lease covering a 32 square
kilometre block of land located on the Sinai Peninsula, directly adjacent to the
Gulf of Suez. Within the lease, four wells have been drilled between the years
1949 to 2000 that have identified the Lagia oil field. Three producing oil
fields, Sudr, Matarma and Asl, are located as close as 26 km to the north of the
Lagia oil field.


The following table sets forth certain information relating to MENA's crude oil
reserves contained in one main fault block covered by the Lagia Development
Lease and the net present values of future net revenue associated with such
reserves, as evaluated by DeGolyer & MacNaughton Canada Limited ("D&M") in the
report of D&M dated May 19, 2011 evaluating the crude oil reserves of MENA as at
May 18, 2011 (the "Lagia Reserves Report") in accordance with National
Instrument 51 101 - "Standards of Disclosure for Oil and Gas Activities" and the
standards contained in the Canadian Oil and Gas Evaluation Handbook ("COGE") and
NI 51-101. 




                         Gross Working                                      
                    Interest Remaining   Net Present Values of Future Net   
                              Reserves                Revenue               
                 -----------------------------------------------------------
                                                         Discounted         
                                                            US$             
                                               -----------------------------
                           Heavy Crude   Undis-                             
                               Oil bbl  counted   at 5% at 10% at 15% at 20%
                 -----------------------------------------------------------
Proved Developed                                                            
Proved                                                                      
 Undeveloped                 1,149,190   10,387   5,681  2,425    150(1,453)
Probable                     2,898,104   54,816  37,696 26,840 19,646 14,679
                 -----------------------------------------------------------
Total Proved plus                                                           
 Probable                    4,047,294   65,203  43,377 29,265 19,796 13,226
Possible(1)                  6,410,376  107,183  65,759 39,688 25,652 17,039
                 -----------------------------------------------------------
Total Proved plus                                                           
 Probable plus                                                              
 Possible(1)                10,457,670  172,386 107,136 68,953 45,448 30,265
                                                                            
Notes:                                                                      
                                                                            
(1) Possible reserves are those additional reserves that are less certain to
    be recovered than probable reserves. There is a 10% probability that the
    quantities actually recovered will equal or exceed the sum of proved    
    plus probable plus possible reserves.                                   
                                                                            
(2) Pursuant to the Lagia Concession, the Egyptian General Petroleum Company
    will pay MENA's share of income taxes out of its share of the profit oil
    and gas. As Egyptian income tax is factored into the royalty deductions,
    income tax is deducted from all future net revenue amounts. Accordingly,
    the net present value of future net revenue attributable to the reserves
    categories referred to above are the same both before and after         
    deducting future income tax expenses for the purposes of NI 51-101.     
                                                                            
(3) MENA requested that D&M provide the Lagia Reserves Report following the 
    completion of the acquisition of the remaining 25% interest in the Lagia
    Development Lease and the related Lagia Concession. Other than          
    information relating to such acquisition, the Lagia Reserves Report is  
    based on data and other information available as of December 31, 2010.  
                                                                            
(4) It should not be assumed that the estimates of future net revenues      
    presented in the table above represent the fair market value of the     
    reserves.                                                               



D&M also prepared a report dated July 26, 2010 estimating, as of March 31, 2010,
the contingent petroleum resources of certain heavy crude oil accumulations
located in the Lagia oil field (the "Lagia Resource Report"). Estimates of the
gross working-interest (100% interest) contingent oil resources quantities for
certain heavy crude oil accumulations located in the Lagia oil field, as of
March 31, 2010, are summarized as follows, expressed in barrels (bbl) of oil:




                                    Low Estimate Best Estimate High Estimate
                                   -----------------------------------------
Gross working interest contingent                                           
 oil resources, bbl                      356,823     3,374,001    11,992,575
                                                                            
Notes:                                                                      
                                                                            
(1) Recovery efficiency is applied to contingent resources in this table.   
(2) Application of any risk factor to contingent resources quantities does  
    not equate contingent resources with reserves.                          
(3) There is no certainty that it will be commercially viable to produce any
    portion of the contingent resources evaluated and described above.      



The petroleum resources set out above are classified as "contingent resources".
Contingent resources are those quantities of petroleum estimated, as of a given
date, to be potentially recoverable from known accumulations using established
technology or technology under development, but which are not currently
considered to be commercially recoverable due to one or more contingencies.
Contingencies may include factors such as economic, legal, environmental,
political, and regulatory matters or a lack of markets. It is also appropriate
to classify as contingent resources the estimated discovered recoverable
quantities associated with a project in the early evaluation stage. Contingent
resources are further classified in accordance with the level of certainty. See
"Uncertainty Categories" below for further information.


Contingent resources may also be sub-classified based on project maturity and/or
characterized by their economic status. Because of the lack of commerciality or
sufficient development drilling, the contingent resources estimated in the Lagia
Resource Report cannot be classified as reserves. The contingent resources
estimated in the Lagia Resource Report were assigned an economic status of
"undetermined". The principle contingencies identified in the Lagia Resource
Report are that the project is at an early evaluation stage, and further
development is required. There is no certainty that it will be commercially
viable to produce any portion of the contingent resources.


About MENA Hydrocarbons

MENA Hydrocarbons is an international oil and gas company focused on growing an
asset base of production, development and high impact exploration in the Middle
East and North Africa region. In Egypt, MENA owns and operates the development
lease for the Lagia oil field, a 32 square kilometre onshore block located on
the Sinai Peninsula, directly adjacent to the Gulf of Suez. In Syria, MENA owns
a 30% participating interest in Block 9 in Syria, a 10,032 square kilometre
onshore block prospective for crude oil, natural gas and condensate. In the
United States, MENA owns 6,242 gross acres (with an 81.2% average working
interest) in Northwestern Montana with light/medium oil reserves, and 36,201
gross acres (with a 99.5% average working interest) in East-Central Utah
prospective for both commercial gas sand and coal bed methane. MENA's shares
currently trade on the TSX Venture Exchange under the symbol "MNH".


Further information

For more information, please see MENA's corporate presentation on
www.menahydrocarbons.com.


Forward looking information 

This news release contains forward-looking information relating to adding to
reserves and resource estimates, planned development and exploration activities
on the properties in which the Company has interests, and other statements that
are not historical facts. Such forward-looking information is subject to
important risks, uncertainties and assumptions. The results or events predicated
in this forward-looking information may differ materially from actual results or
events. As a result, you are cautioned not to place undue reliance on these
forward-looking information.


Forward-looking information is based on certain factors and assumptions
regarding, among other things, the impact of increasing competition; the general
stability of the economic and political environments in which the Company
operates or owns interests; the timely receipt of any required regulatory
approvals; the ability of the Company to obtain qualified staff, equipment and
services in a timely and cost efficient manner; drilling results; the ability of
the operator of the projects which the Company has an interest in to operate the
field in a safe, efficient and effective manner; the ability of the Company to
obtain financing on acceptable terms; field production rates and decline rates;
the ability to replace and expand oil and natural gas reserves through
acquisition, development of exploration; the timing and costs of pipeline,
storage and facility construction and expansion and the ability of the Company
to secure adequate product transportation; future oil and natural gas prices;
currency, exchange and interest rates; the regulatory framework regarding
royalties, taxes and environmental matters in the jurisdictions in which the
Company operates; and the ability of the Company to successfully market its oil
and natural gas products, and other similar matters. While the Company considers
these assumptions to be reasonable based on information currently available to
it, they may prove to be incorrect.


Forward looking-information is subject to certain factors, including risks and
uncertainties that could cause actual results to differ materially from what is
currently expected. These factors include risks associated with instability of
the economic and political environments in which the Company operates or owns
interests, oil and gas exploration, development, exploitation, production,
marketing and transportation, loss of markets, volatility of commodity prices,
currency fluctuations, imprecision of reserve estimates, environmental risks,
competition from other producers, inability to retain drilling rigs and other
services, incorrect assessment of the value of acquisitions, the inability to
settle the definitive terms of the farmout arrangements, failure to realize the
anticipated benefits of acquisitions, delays resulting from or inability to
obtain required regulatory approvals and ability to access sufficient capital
from internal and external sources, reliance on key personnel, regulatory risks
and delays, including risks relating to the acquisition of necessary licenses
and permits, environmental risks and insurance risks.


The estimates of reserves and resources in this news release constitute
forward-looking information which are subject to certain risks and
uncertainties, including those associated with the drilling and completion of
future wells, limited available geological data and uncertainties regarding the
actual production characteristics of, and recovery efficiencies associated with,
the reservoirs, all of which are being assumed. As estimates, there is no
guarantee that the estimated reserves or resources will be recovered or
produced. Actual reserves and resources may be greater than or less than the
estimates provided in this presentation. Information concerning the independent
evaluations from which these estimates are derived may be accessed under the
Company's profile on SEDAR at www.sedar.com.


You should not place undue importance on forward-looking information and should
not rely upon this information as of any other date. While the Company may elect
to, the Company is under no obligation and does not undertake to update this
information at any particular time, except as required by law.