ZHENJIANG, China, July 29,
2024 /PRNewswire/ -- In recent years, adhering
closely to the requirements of building a new-type power system and
a digital distribution network, State Grid Corporation of
China has actively explored the
deep integration of digital-intelligence technologies with
distribution network expertise, establishing a digital distribution
network demonstration zone in Zhenjiang, Jiangsu
Province. Notably, Zhenjiang is the only prefecture-level
city in Jiangsu to embark on such
a digitalization initiative.
During the construction of this demonstration zone, State Grid
Zhenjiang Power Supply Company has achieved remarkable progress by
installing low-voltage power line high-speed carrier communication
acquisition equipment, applying adjustable and controllable digital
grid technologies, and enhancing adaptive drone inspections.
These measures have effectively reduced the average response time
for low-voltage fault repairs from 48 minutes to 25 minutes,
increased drone inspection efficiency to 30 seconds per pole and
tower, and achieved a defect identification rate of over 90%.
Moving forward, State Grid Zhenjiang Power Supply Company will
focus on three key objectives: enhancing power supply reliability,
improving the quality and efficiency of distribution network
operations, and facilitating the local consumption of renewable
energy. It will continue to strengthen the digital foundation
of its distribution network, reinforce the coordinated interaction
between power sources, grids, loads, and storage, and further
develop a safe, green, and efficient smart distribution
network.
View original
content:https://www.prnewswire.com/news-releases/state-grid-builds-digital-distribution-network-demonstration-zone-in-zhenjiang-jiangsu-302208607.html
SOURCE State Grid Zhenjiang Power Supply Company