       BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 30 JUNE 2003



BHP Billiton today released its production report for the quarter ended 30 June
2003.
  * Record annual Western Australian Iron Ore production of 76.5 million tonnes 
    and record annual shipments of 80.3 million tonnes (100 per cent basis).

  * Record quarterly plant throughput of 1.18 million tonnes achieved at 
    Ekati(TM) (Canada) (100 per cent basis).

  * Record annual nickel production of 78,100 tonnes.


  * Total Petroleum Products - Total production for the June 2003 quarter was
    30 million barrels of oil equivalent, 7 per cent higher than the March 2003
    quarter and 10 per cent lower than the June 2002 quarter. Total production
    for the year ended 30 June 2003 was 122 million barrels of oil equivalent, a
    decrease of 9 per cent compared with the year ended 30 June 2002.

      * Oil and Condensate - Production for the June 2003 quarter was 15.6
        million barrels, 2 per cent higher than the 15.3 million barrels
        produced in the March 2003 quarter, mainly due to a full quarter of
        production from Boris (US), increased condensate production from Bass
        Strait (Australia) as a result of increased gas demand and a higher
        proportion of wet gas from Bream, along with improved reliability and
        successful infill drilling at Liverpool Bay (UK). This was partly offset
        by natural field decline in Laminaria (Australia) and Griffin
        (Australia). As expected, production for the quarter was lower than the
        19.7 million barrels produced in the June 2002 quarter, mainly due to
        natural field decline in Bass Strait, Laminaria, Griffin, Liverpool Bay
        and Typhoon (US). Typhoon performance was also affected by well
        workovers largely offset by the commencement of production from Boris.

      * Natural Gas - Production for the June 2003 quarter was 72.9 billion
        cubic feet, 9 per cent higher than the 67.0 billion cubic feet produced
        in the March 2003 quarter. Seasonal conditions led to increased demand
        for Bass Strait natural gas during the June 2003 quarter, which was
        partly offset by maintenance shut downs at Bruce (UK). Production for
        the quarter was 3 per cent higher than the 70.7 billion cubic feet
        produced in the June 2002 quarter due to increased demand for North West
        Shelf (Australia) LNG and domestic gas and higher sales from Liverpool
        Bay. This was partly offset by lower demand from Bass Strait driven by
        milder weather conditions and natural field decline in West Cameron
        (US).


  * Alumina - Production for the June 2003 quarter was 1.1 million tonnes,
    compared with 1.0 million tonnes in the June 2002 and March 2003 quarters.
    Production increased at Worsley (Australia) with hydrate stockpiled in the
    previous quarter being processed. Higher year on year production mainly
    reflects a return to full production at Alumar (Brazil) following the end of
    government enforced power rationing in the March 2002 quarter.

  * Aluminium - Production for the June 2003 quarter was 273,000 tonnes,
    compared with 263,000 tonnes in the June 2002 quarter and 267,000 tonnes in
    the March 2003 quarter. The increase mainly reflects the ramp up of
    production from the Mozal 2 (Mozambique) expansion where first metal was
    cast in April 2003, six months ahead of schedule. Higher year on year
    production also reflects increased tonnages from Hillside (South Africa) due
    to the success of the capacity creep program, completion of the pot relining
    program in June 2002 and non-recurrence of the September 2001 power outage,
    combined with a return to full production at Alumar and Valesul (Brazil)
    following the end of government enforced power rationing in the March 2002
    quarter.

  * Copper - Production for the June 2003 quarter was 229,200 tonnes, 7 per
    cent higher than the 213,500 tonnes produced in the June 2002 quarter. This
    scheduled increase mainly reflects the ramp up of the Escondida (Chile)
    Phase IV expansion.

  * Iron Ore - Record annual Western Australian production of 76.5 million
    tonnes (100 per cent basis) was 6 per cent higher than the previous year, in
    response to strong demand in all Asian markets, particularly China. A new
    annual shipping record was set during the year in Western Australia, where
    despatches to customers were 80.3 million tonnes (100 per cent basis), an
    increase of 13 per cent compared with the 2002 year. Annual production from
    Samarco (Brazil) of 7.9 million tonnes was 40 per cent higher than the
    previous year, a reflection of strong customer demand resulting in the
    restart of previously idled pelletising capacity. Total iron ore production
    for the June 2003 quarter was 19.4 million tonnes (BHP Billiton share), 14
    and 13 per cent higher than the June 2002 and March 2003 quarters
    respectively.

  * Metallurgical Coal - Production for the June 2003 quarter of 9.0 million
    tonnes was in line with the June 2002 quarter and 5 per cent higher than the
    March 2003 quarter. Annual production of 34.6 million tonnes, while 3 per
    cent lower than in the corresponding period, reflects stronger customer
    demand in the second half of the year, offset by adverse mining conditions
    at the Crinum mine (Australia) and the closure of Tower Colliery
    (Australia). Annual shipments of Queensland Coal (Australia) were in line
    with the previous year. Annual shipments of Illawarra Coal (Australia) were
    7.2 million tonnes, 7 per cent higher, also reflecting strong customer
    demand.

  * Manganese - Annual ore production of 4.1 million tonnes was 16 per cent
    higher than 2002 in response to strong customer demand, particularly from
    China. Full year alloy production of 737,000 tonnes was 19 per cent higher
    than 2002 also due to increased customer demand.

  * Ekati(TM) Diamonds - Record plant throughput of 1.18 million tonnes (100
    per cent basis) was achieved at Ekati(TM) (Canada) during the June 2003
    quarter, reflecting benefits of a processing plant de-bottlenecking program.
    Combined with improved ore grade, quarterly production of 1.30 million
    carats and annual production of 4.34 million carats were 27 per cent and 19
    per cent respectively higher than for the corresponding period last year.

  * Energy Coal - Production for the June 2003 quarter was 22.0 million
    tonnes, compared with 20.6 million tonnes in the June 2002 quarter and 19.7
    million tonnes in the March 2003 quarter. The increase mainly reflects
    higher production at Mount Arthur North (Australia) where deliveries to both
    the export and domestic thermal coal markets were in accordance with the
    ramp up plan, and higher production at Cerrejon Coal (Colombia) largely
    reflecting strong demand from the European market during the June 2003
    quarter.

  * Nickel - Record annual production of 31,200 tonnes was achieved at the QNI
    Yabulu refinery (Australia) during 2003, 9 per cent higher than production
    during the previous year. This mainly reflects ore processing enhancements
    resulting from operating excellence initiatives. Cerro Matoso (Colombia)
    also achieved record production, reflecting the ramp-up of Line 2 and
    benefits from ongoing improvement programs. Total Nickel production for the
    June 2003 quarter was 21,000 tonnes, compared with 17,700 tonnes in the June
    2002 quarter and 18,600 tonnes in the March 2003 quarter, a result of
    operating excellence initiatives at both sites.

  * Ferrochrome - Annual production of 990,000 tonnes was 18 per cent higher
    than in the previous year, driven by the restart of idle furnaces in
    response to increased market demand. Production for the June 2003 quarter
    was 259,000 tonnes, compared with 223,000 tonnes in the June 2002 quarter
    and 263,000 tonnes in the March 2003 quarter.


                                        ****

Further information on BHP Billiton can be found on our Internet site: 
http://www.bhpbilliton.com

Australia                                                     United Kingdom
Andrew Nairn, Investor Relations                              Mark Lidiard, Investor & Media Relations
Tel: +61 3 9609 3952 Mobile: +61 408 313 259                  Tel: +44 20 7802 4156
email: Andrew.W.Nairn@bhpbilliton.com                         email: Mark.Lidiard@bhpbilliton.com

Tania Price, Media Relations                                  Ariane Gentil, Media Relations
Tel: +61 3 9609 3815 Mobile: +61 419 152 780                  Tel: +44 20 7802 4177 Mobile: +44 78 81 51 8715
email: Tania.Price@bhpbilliton.com                            email: Ariane.Gentil@bhpbilliton.com

Tracey Whitehead, Media Relations                             South Africa
Tel: +61 3 9609 4202 Mobile: +61 419 404 978                  Michael Campbell, Investor & Media Relations
email: Tracey.Whitehead@BHPBilliton.com                       Tel: +27 11 376 3360 Mobile: +27 82 458 2587
                                                              email: Michael.J.Campbell@bhpbilliton.com
United States
Francis McAllister, Investor Relations
Tel: +1 713 961 8625 Mobile: +1 713 480 3699
email: Francis.R.McAllister@bhpbilliton.com




BHP BILLITON PRODUCTION SUMMARY
                                                QUARTER ENDED               YEAR ENDED                 % CHANGE
                                                                                              JUN Q03  JUN Q03   FY 03
                                          JUNE      MARCH     JUNE        JUNE      JUNE         vs       vs       vs
                                          2002      2003      2003        2003      2002      JUN Q02  MAR Q03   FY 02
PETROLEUM
  Crude oil & condensate    ('000 bbl)     19,732    15,310    15,635      65,893    78,519       -21%       2%     -16%
  Natural gas                  (bcf)        70.66     66.99     72.91      281.17    283.47         3%       9%      -1%
  LPG                          ('000       180.43    160.62    205.57      743.12    697.56        14%      28%       7%
                              tonnes)
  Ethane                       ('000        25.62     22.35     24.97       94.90     87.13        -3%      12%       9%
                              tonnes)
  Total Petroleum Products   (million          34        28        30         122       134       -10%       7%      -9%
                               boe)
ALUMINIUM
  Alumina                      ('000        1,018     1,003     1,060       4,092     3,943         4%       6%       4%
                              tonnes)
  Aluminium                    ('000          263       267       273       1,074       992         4%       2%       8%
                              tonnes)
BASE METALS
  Copper                       ('000        213.5     231.3     229.2       870.5     824.3         7%      -1%       6%
                              tonnes)
  Lead                       (tonnes)      64,768    59,065    59,389     240,042   236,066        -8%       1%       2%
  Zinc                       (tonnes)      38,942    46,755    54,396     193,808   162,493        40%      16%      19%
  Gold                       (ounces)      72,032    57,802    25,752     207,882   286,971       -64%     -55%     -28%
  Silver                       ('000       11,833    10,355     9,643      41,128    41,958       -19%      -7%      -2%
                              ounces)
  Molybdenum                 (tonnes)         232       260       280       1,010       658        21%       8%      54%

CARBON STEEL MATERIALS
  Iron ore                     ('000       17,080    17,237    19,420      73,732    67,907        14%      13%       9%
                              tonnes)
  Metallurgical coal           ('000        9,359     8,556     9,026      34,622    35,532        -4%       5%      -3%
                              tonnes)
  Manganese ores               ('000          784       890     1,058       4,102     3,535        35%      19%      16%
                              tonnes)
  Manganese alloys             ('000          169       177       195         737       618        15%      10%      19%
                              tonnes)
  Hot briquetted iron          ('000            -       465       458       1,670     1,047       100%      -2%      60%
                              tonnes)
DIAMONDS AND SPECIALTY PRODUCTS
  Diamonds                     ('000        1,023     1,015     1,300       4,340     3,650        27%      28%      19%
                              carats)
ENERGY COAL
  Energy coal                  ('000       20,571    19,735    21,991      81,703    82,835         7%      11%      -1%
                              tonnes)
STAINLESS STEEL MATERIALS
  Nickel                       ('000         17.7      18.6      21.0        78.1      68.9        19%      13%      13%
                              tonnes)
  Chrome ores                  ('000          664       679       720       2,826     2,451         8%       6%      15%
                              tonnes)
  Ferrochrome                  ('000          223       263       259         990       837        16%      -2%      18%
                              tonnes)
  Throughout this report figures in italics indicate adjustments made since the figure was
  previously reported.

BHP BILLITON ATTRIBUTABLE PRODUCTION
                                                           QUARTER ENDED                               YEAR ENDED
                          BHP Billiton    JUNE       SEPT       DEC       MARCH       JUNE           JUNE       JUNE
                            Interest      2002       2002       2002       2003       2003           2003       2002
PETROLEUM
Production
   Crude oil & condensate  (000 bbl)       19,732     18,550     16,398     15,310     15,635         65,893     78,519
   Natural gas               (bcf)          70.66      71.86      69.41      66.99      72.91         281.17     283.47
   LPG                       ('000         180.43     208.96     167.97     160.62     205.57         743.12     697.56
                            tonnes)
   Ethane                    ('000          25.62      27.67      19.91      22.35      24.97          94.90      87.13
                            tonnes)
   Total Petroleum          (million           34         33         30         28         30            122        134
   Products                   boe)
ALUMINIUM
ALUMINA
Production ('000 tonnes)
   Worsley                    86%             686        698        662        658        724          2,742      2,696
   Suriname                   45%             215        221        213        222        223            879        851
   Alumar                     36%             117        112        123        123        113            471        396
   Total                                    1,018      1,031        998      1,003      1,060          4,092      3,943
ALUMINIUM
Production ('000 tonnes)
   Hillside                   100%            132        135        134        133        132            534        501
   Bayside                    100%             43         46         45         48         46            185        175
   Alumar                    46.3%             46         44         44         45         45            178        153
   Valesul                   45.5%             11         11         11         10         11             43         37
   Mozal                      47%              31         32         32         31         39            134        126
   Total                                      263        268        266        267        273          1,074        992
BASE METALS (a)
COPPER
Payable metal in concentrate ('000
tonnes)
   Escondida (b)             57.5%           94.4       68.4      105.6      118.5      126.6          419.1      339.1
   Tintaya (b)                100%            0.2          -          -          -          -              -       44.9
   Antamina (c)              33.8%           30.5       25.7       26.4       23.6       21.2           96.9       81.9
   Alumbrera (d)              25%            12.8       11.1       13.4        9.9          -           34.4       48.5
   Highland Valley Copper    33.6%           16.1       14.9       14.3       13.2       13.8           56.2       62.1
   Selbaie                    100%            2.6        2.8        2.1        1.7        1.8            8.3       10.2
   Total                                    156.6      122.9      161.8      166.9      163.4          614.9      586.6
Cathode ('000 tonnes)
   Escondida                 57.5%           21.5       17.9       19.1       20.4       21.1           78.5       86.5
   Cerro Colorado             100%           31.3       32.5       33.1       32.5       33.0          131.1      130.8
   Tintaya (b)                100%            1.3        8.4        8.9        9.0        9.1           35.4        1.3
   San Manuel                 100%              -          -          -          -          -              -        6.3
   Pinto Valley               100%            2.8        2.8        2.7        2.5        2.6           10.6       12.8
   Total                                     56.9       61.6       63.8       64.4       65.8          255.6      237.7
LEAD
Payable metal in concentrate (tonnes)
   Cannington                 100%         63,799     61,676     57,651     58,711     59,389        237,427    231,764
   Pering (e)                 100%            969      1,567        694        354          -          2,615      4,302
   Total                                   64,768     63,243     58,345     59,065     59,389        240,042    236,066
   Refer footnotes on
   page 5.
BASE METALS (continued)
ZINC
Payable metal in concentate (tonnes)
   Cannington                 100%         12,511     15,182     14,721     15,480     18,479         63,862     58,856
   Antamina (c)              33.8%         13,518     18,189     15,424     20,519     28,553         82,685     48,326
   Selbaie                    100%          8,121      9,840      6,540      6,421      7,364         30,165     34,196
   Pering (e)                 100%          4,793      5,331      7,430      4,335          -         17,096     21,115
   Total                                   38,942     48,542     44,115     46,755     54,396        193,808    162,493
GOLD
Payable metal in concentrate (ounces)
   Escondida (b)             57.5%         17,694     10,074     15,936     17,458     20,664         64,132     52,338
   Tintaya (b)                100%              -          -          -          -          -              -     22,252
   Alumbrera (d)              25%          47,993     39,279     46,940     35,084          -        121,303    185,413
   Selbaie                    100%          5,117      4,486      5,069      4,146      4,081         17,782     22,201
   Highland Valley Copper    33.6%          1,228      1,314      1,230      1,114      1,007          4,665      4,767
   Total                                   72,032     55,153     69,175     57,802     25,752        207,882    286,971
SILVER
Payable metal in concentrate ('000
ounces)
   Cannington                 100%         10,265      9,612      8,326      8,773      8,161         34,872     35,964
   Escondida                 57.5%            344        304        387        471        538          1,700      1,257
   Antamina (c)              33.8%            461        536        557        617        517          2,227      1,719
   Alumbrera (d)             25.0%             56         53         72         75          -            200        237
   Highland Valley Copper    33.6%            183        162        159        140        143            604        709
   Selbaie                    100%            524        593        369        279        284          1,525      2,073
   Total                                   11,833     11,260      9,870     10,355      9,643         41,128     41,958
MOLYBDENUM
Payable metal in concentrate (tonnes)
   Highland Valley Copper    33.6%            232        220        250        260        280          1,010        658
CARBON STEEL MATERIALS
IRON ORE
Production ('000 tonnes)
   Mt Newman Joint            85%           5,413      5,486      5,287      4,964      6,221         21,958     23,374
   Venture
   Goldsworthy Joint          85%           1,690      1,891      1,808      1,497      1,516          6,712      6,447
   Venture
   Yandi Joint Venture        85%           6,663      7,796      8,187      7,452      8,353         31,788     27,256
   Jimblebar                  100%          1,476      1,433      1,186      1,371      1,428          5,418      5,201
   Samarco                    50%           1,838      2,022      1,979      1,953      1,902          7,856      5,629
   Total                                   17,080     18,628     18,447     17,237     19,420         73,732     67,907
METALLURGICAL COAL (f)
Production ('000 tonnes)
   BMA (g)                    50%           5,686      4,652      5,032      5,838      5,769         21,291     21,701
   BHP Mitsui Coal (h)        80%           1,746      1,863      1,472      1,200      2,033          6,568      6,743
   Illawarra                  100%          1,927      2,135      1,886      1,518      1,224          6,763      7,088
   Total                                    9,359      8,650      8,390      8,556      9,026         34,622     35,532
   Refer footnotes on
   page 5.
CARBON STEEL MATERIALS (cont'd)
MANGANESE ORES
Saleable production ('000 tonnes)
   South Africa (i)           60%             475        581        560        534        574          2,249      1,867
   Australia (i)              60%             309        514        499        356        484          1,853      1,668
   Total                                      784      1,095      1,059        890      1,058          4,102      3,535
MANGANESE ALLOYS
Saleable production ('000 tonnes)
   South Africa (i)           60%             121        124        125        117        137            503        406
   Australia (i)              60%              48         51         65         60         58            234        212
   Total                                      169        175        190        177        195            737        618
HOT BRIQUETTED IRON
Production ('000 tonnes)
   Boodarie(TM) Iron (j)     100%              -         333        414        465        458          1,670       1,047
DIAMONDS AND SPECIALTY PRODUCTS
DIAMONDS
Production ('000 carats)
   Ekati(TM)                   80%           1,023        954      1,071      1,015      1,300          4,340      3,650
ENERGY COAL
Production ('000 tonnes)
   South Africa               100%         13,815     13,838     13,333     13,256     13,812         54,239     55,710
   USA                        100%          3,703      2,800      4,339      3,147      3,877         14,163     13,245
   Australia                  100%          1,390      1,244      1,234      1,922      2,041          6,441      4,555
   Indonesia (k)              80%             208        216         29         28          -            273      4,622
   Colombia (l)               33%           1,455      1,231      1,713      1,382      2,261          6,587      4,703
   Total                                   20,571     19,329     20,648     19,735     21,991         81,703     82,835
STAINLESS STEEL MATERIALS
NICKEL
Production ('000 tonnes)
   CMSA                      99.8%            9.9       11.7       11.9       11.1       12.2           46.9       40.4
   Yabulu                     100%            7.8        7.4        7.5        7.5        8.8           31.2       28.5
   Total                                     17.7       19.1       19.4       18.6       21.0           78.1       68.9
CHROME ORES
Saleable production ('000 tonnes)
   South Africa (i)           60%             664        713        714        679        720          2,826      2,451
FERROCHROME
Saleable production ('000 tonnes)
   South Africa (i)           60%             223        238        230        263        259            990        837
   Refer footnotes on
   page 5.
   (a) Metal production is reported on the basis of payable metal.
   (b) Sulphide production at Escondida and Tintaya was reduced in November 2001 and January 2002 respectively due to
   weak market conditions. Commercial production of copper cathode commenced at Tintaya in June 2002.
   The Escondida Phase IV expansion was commissioned in October 2002.
   (c) Antamina commenced commercial production in October 2001.
   (d) BHP Billiton announced the sale of its interest in Alumbrera in March 2003. The sale transaction reached closure
   in June 2003.
   Participation in the joint venture ceased on 2 April 2003.
   (e) Production ceased, ahead of mine closure, in February 2003.
   (f) Coal production is reported on the basis of saleable product. Production figures include some thermal coal.
   (g) BHP Billiton acquired its share of South Blackwater in July 2001. South Blackwater is equally owned by BHP
   Billiton and
   Mitsubishi Development Pty Ltd. Effective January 2002, South Blackwater production is reported in BMA.
   (h) Shown on 100% basis before 20% outside equity interest.
   (i) Shown on 100% basis. BHP Billiton interest in saleable production is 60%.
   (j) Boodarie Iron recommenced production in July 2002 following the suspension of operations due to a tube failure
   in a gas
   re-heating furnace.
   (k) Production shown on 86.5% basis after allowing for Indonesian state owned corporation's 13.5% share of
   production.
   BHP Billiton sold its interest in the Senakin and Satui mines effective 30 November 2001. Mining operations
   at Petangis ceased in October 2002.
   (l) BHP Billiton increased its interest in Cerrejon Zona Norte to 33.3% from 16.7% effective Februrary 2002.

PRODUCTION AND SHIPMENT REPORT
                                                           QUARTER ENDED                               YEAR ENDED
                                          JUNE       SEPT       DEC       MARCH       JUNE           JUNE       JUNE
                                          2002       2002       2002       2003       2003           2003       2002
PETROLEUM
BHP Billiton attributable production unless otherwise stated.
CRUDE OIL & CONDENSATE ('000 barrels)
   Bass Strait                              6,786      6,799      5,799      5,391      5,643         23,632     27,976
   North West Shelf - condensate            1,466      1,602      1,510      1,566      1,560          6,238      5,633
   North West Shelf - Wanaea/Cossack        1,892      1,876      1,655      1,679      1,606          6,816      7,314
   Laminaria                                2,200      2,914      1,869      1,419      1,161          7,363      9,728
   Griffin                                  1,587      1,281      1,089        831        708          3,909      5,458
   Pakistan                                    18         18         17         16         14             65         74
   Typhoon/Boris (a)                        1,754      1,233        654        852      1,430          4,169      5,376
   Americas                                   861        718        652        816        715          2,901      3,669
   Liverpool Bay                            2,574      1,838      2,463      2,174      2,344          8,819     11,042
   Bruce/Keith                                594        271        690        566        454          1,981      2,248
   Total                                   19,732     18,550     16,398     15,310     15,635         65,893     78,519
NATURAL GAS (billion cubic feet)
   Bass Strait                              26.77      33.07      21.07      17.51      25.37          97.02      96.86
   North West Shelf -                        2.86       3.62       3.82       3.81       4.07          15.32      13.73
   Domestic
   North West Shelf - LNG                   13.01      16.55      14.93      15.11      15.41          62.00      59.55
   Griffin                                   0.34       0.95       1.03       0.81       0.81           3.60       3.97
   Pakistan                                  3.02       2.83       2.76       2.57       2.33          10.49      11.45
   Typhoon/Boris (a)                         1.93       1.38       0.71       2.03       2.03           6.15       6.19
   Americas                                  4.63       3.91       3.80       3.34       3.42          14.47      19.03
   Bruce                                     7.92       4.59      10.55      10.04       8.17          33.35      30.29
   Keith                                     0.16       0.07       0.15       0.15       0.14           0.51       0.72
   Liverpool Bay                            10.01       4.89      10.59      11.62      11.16          38.26      41.69
   Total                                    70.66      71.86      69.41      66.99      72.91         281.17     283.47
LPG ('000 tonnes)
   Bass Strait                             126.70     149.66     115.23     111.74     135.18         511.81     471.70
   North West Shelf                         35.08      36.32      31.04      32.67      32.39         132.42     140.26
   Bruce                                    17.49      22.45      20.47      15.10      37.24          95.26      81.23
   Keith                                     1.17       0.53       1.23       1.11       0.76           3.63       4.38
   Total                                   180.43     208.96     167.97     160.62     205.57         743.12     697.56
ETHANE ('000 tonnes)                        25.62      27.67      19.91      22.35      24.97          94.90      87.13
TOTAL PETROLEUM PRODUCTS
(million barrels of oil equivalent)          33.7       33.1       30.0       28.4       30.3          121.8      134.2
(b)
   (a) Typhoon commenced production in July 2001. Boris commenced production in February 2003.
   (b) Total barrels of oil equivalent (boe) conversions based on the following:
   6000 scf of natural gas equals 1 boe
   1 tonne of LPG equals 11.6 boe
   1 tonne of ethane equals 4.4667 boe
PRODUCTION AND SHIPMENT REPORT
                                                            QUARTER ENDED                               YEAR ENDED
                                           JUNE       SEPT       DEC       MARCH       JUNE           JUNE       JUNE
                                           2002       2002       2002       2003       2003           2003       2002
ALUMINIUM
BHP Billiton attributable production and sales unless otherwise stated.
('000 tonnes)
ALUMINA
    Production
    Worsley, Australia                         686        698        662        658        724          2,742      2,696
    Paranam, Suriname                          215        221        213        222        223            879        851
    Alumar, Brazil                             117        112        123        123        113            471        396
    Total                                    1,018      1,031        998      1,003      1,060          4,092      3,943
    Sales
    Worsley, Australia                         690        758        606        751        636          2,751      2,676
    Paranam, Suriname                          197        253        201        243        228            925        847
    Alumar, Brazil                             106        130        125        124        107            486        374
    Total                                      993      1,141        932      1,118        971          4,162      3,897
ALUMINIUM
    Production
    Hillside, South Africa                     132        135        134        133        132            534        501
    Bayside, South Africa                       43         46         45         48         46            185        175
    Alumar, Brazil                              46         44         44         45         45            178        153
    Valesul, Brazil                             11         11         11         10         11             43         37
    Mozal, Mozambique                           31         32         32         31         39            134        126
    Total                                      263        268        266        267        273          1,074        992
    Sales
    Hillside, South Africa                     131        124        135        133        143            535        499
    Bayside, South Africa                       53         47         45         48         48            188        181
    Alumar, Brazil                              45         38         52         38         51            179        150
    Valesul, Brazil                             11          9         12          9         10             40         37
    Mozal, Mozambique                           34         27         35         33         41            136        129
    Total                                      274        245        279        261        293          1,078        996

PRODUCTION AND SHIPMENT REPORT
                                                            QUARTER ENDED                               YEAR ENDED
                                           JUNE       SEPT       DEC       MARCH       JUNE           JUNE       JUNE
                                           2002       2002       2002       2003       2003           2003       2002
BASE METALS
BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless
otherwise stated.
Escondida, Chile (a) (b)
   Material mined (100%)  ('000 tonnes)     77,244     74,671     74,303     73,466     74,665        297,105    327,809
   Sulphide ore milled    ('000 tonnes)     11,311     10,142     14,632     16,744     16,416         57,934     43,028
   (100%)
   Average copper grade   (%)                1.74%      1.45%      1.59%      1.49%      1.62%          1.55%      1.69%
   Production ex Mill     ('000 tonnes)      170.3      125.6      191.8      210.8      230.9          759.1      611.5
   (100%)
   Production
   Payable copper         ('000 tonnes)       94.4       68.4      105.6      118.5      126.6          419.1      339.1
   Payable gold           (fine ounces)     17,694     10,074     15,936     17,458     20,664         64,132     52,338
   concentrate
   Copper cathode (SXEW)  ('000 tonnes)       21.5       17.9       19.1       20.4       21.1           78.5       86.5
   Payable silver         ('000 ounces)        344        304        387        471        538          1,700      1,257
   concentrate
   Sales
   Payable copper         ('000 tonnes)       85.3       77.0      104.8      113.5      128.9          424.2      333.0
   Payable gold           (fine ounces)     17,004     11,689     16,709     17,166     20,138         65,702     48,925
   concentrate
   Copper cathode (SXEW)  ('000 tonnes)       22.7       18.1       19.5       19.3       20.3           77.2       88.1
   Payable silver         ('000 ounces)        248        269        400        484        584          1,737      1,207
   concentrate
   (a) Sulphide production at Escondida was reduced in November 2001 due to weak market conditions.
   (b) Includes production from the Escondida Phase IV expansion which commissioned in October 2002.
Tintaya, Peru (a) (b)
   Material mined         ('000 tonnes)          -          -          -          -          -              -     32,111
   Ore milled             ('000 tonnes)          -          -          -          -          -              -      3,280
   Average copper grade   (%)                    -          -          -          -          -              -      1.65%
   Production
   Payable copper         ('000 tonnes)        0.2          -          -          -          -              -       44.9
   Payable gold           (fine ounces)          -          -          -          -          -              -     22,252
   concentrate
   Copper cathode (SXEW)  ('000 tonnes)        1.3        8.4        8.9        9.0        9.1           35.4        1.3
   Sales
   Payable copper         ('000 tonnes)          -          -          -          -          -              -       45.8
   Payable gold           (fine ounces)        212          -          -          -          -              -     24,955
   concentrate
   Copper cathode (SXEW)  ('000 tonnes)        1.9        8.0        8.7        8.7        9.5           34.9        1.9
   (a) Sulphide production at Tintaya was suspended in January 2002 due to weak market conditions.
   (b) Commercial production of copper cathode commenced in June 2002.
Cerro Colorado, Chile
   Material mined         ('000 tonnes)     18,628     17,963     15,027     16,564     16,458         66,012     64,661
   Ore milled             ('000 tonnes)      3,581      3,759      3,942      3,916      4,130         15,747     14,688
   Average copper grade   (%)                1.00%      0.97%      1.03%      1.00%      0.96%          0.99%      1.04%
   Production
   Copper cathode         ('000 tonnes)       31.3       32.5       33.1       32.5       33.0          131.1      130.8
   Sales
   Copper cathode         ('000 tonnes)       34.5       27.2       29.1       39.3       31.5          127.1      133.2
Antamina, Peru (a)
   Material mined (100%)  ('000 tonnes)     28,990     30,235     25,797     25,290     28,353        109,675     69,508
   Ore milled (100%)      ('000 tonnes)      7,250      6,794      6,395      6,424      6,697         26,310     19,877
   Average head grades
   - Copper               (%)                1.43%      1.33%      1.41%      1.32%      1.09%          1.29%      1.39%
   - Zinc                 (%)                0.93%      1.28%      1.15%      1.54%      1.97%          1.49%      1.23%
   Production
   Payable copper         ('000 tonnes)       30.5       25.7       26.4       23.6       21.2           96.9       81.9
   Payable zinc           (tonnes)          13,518     18,189     15,424     20,519     28,553         82,685     48,326
   Payable silver         ('000 ounces)        461        536        557        617        517          2,227      1,719
   Sales
   Payable copper         ('000 tonnes)       28.6       30.6       25.8       22.4       21.2          100.0       86.2
   Payable zinc           (tonnes)          15,009     19,184     14,407     15,400     31,034         80,025     47,023
   Payable silver         ('000 ounces)        489        590        530        575        435          2,130      1,687
   (a) Commercial production commenced in October 2001.
Alumbrera, Argentina (a)
   Material mined (100%)  ('000 tonnes)     26,524     29,356     28,730     26,400          -         84,486    110,134
   Ore milled (100%)      ('000 tonnes)      7,575      8,034      8,703      8,376          -         25,113     29,379
   Average head grades
   - Copper               (%)                0.73%      0.62%      0.69%      0.54%          -          0.62%      0.73%
   - Gold                 (g/t)                1.0        0.8        0.9        0.7          -            0.8        1.0
   Production
   Payable copper         ('000 tonnes)       12.8       11.1       13.4        9.9          -           34.4       48.5
   Payable gold           (fine ounces)     43,020     35,935     42,594     30,730          -        109,259    171,789
   Payable gold - dore    (fine ounces)      4,973      3,344      4,346      4,354          -         12,044     13,624
   Payable silver         ('000 ounces)         56         53         72         75          -            200        237
   Sales
   Payable copper         ('000 tonnes)       11.6       10.3       13.3       10.8          -           34.4       47.2
   Payable gold           (fine ounces)     36,874     33,957     42,381     33,438          -        109,776    166,819
   Payable gold - dore    (fine ounces)      4,466      3,082      4,409      4,159          -         11,650     12,014
   Payable silver         ('000 ounces)         67         53         72         75          -            200        247
   (a) BHP Billiton announced the sale of its interest in Alumbrera in March 2003. The sale transaction reached closure
   in June 2003.
   Participation in the joint venture ceased on 2nd April 2003.
Highland Valley, Canada
   Material mined (100%)  ('000 tonnes)     18,522     20,455     18,682     16,642     18,186         73,965     77,637
   Ore milled (100%)      ('000 tonnes)     12,224     12,941     12,924     11,602     12,565         50,032     49,755
   Average copper grade   (%)                0.43%      0.40%      0.39%      0.40%      0.39%          0.39%      0.42%
   Production
   Payable copper         ('000 tonnes)       16.1       14.9       14.3       13.2       13.8           56.2       62.1
   Payable molybdenum     ('000 tonnes)       0.23       0.22       0.25       0.26       0.28           1.01       0.66
   Payable silver         ('000 ounces)        183        162        159        140        143            604        709
   Payable gold           (fine ounces)      1,228      1,314      1,230      1,114      1,007          4,665      4,767
   concentrate
   Sales
   Payable copper         ('000 tonnes)       14.9       14.4       17.5       10.0       10.7           52.6       62.7
   Payable molybdenum     ('000 tonnes)       0.22       0.19       0.22       0.26       0.23           0.90       0.67
   Payable silver         ('000 ounces)        173        153        189        106        116            564        729
   Payable gold           (fine ounces)      1,467      1,240      1,644        843        793          4,520      6,465
   concentrate
Cannington, Australia
   Material mined         ('000 tonnes)        574        631        573        601        588          2,393      2,240
   Ore milled             ('000 tonnes)        575        599        564        589        560          2,312      2,176
   Average head grades
   - Silver               (g/t)                675        564        535        550        525            544        615
   - Lead                 (%)                13.6%      11.7%      11.9%      11.8%      12.1%          11.9%      12.9%
   - Zinc                 (%)                 3.9%       4.3%       4.3%       4.3%       5.3%           4.5%       4.6%
   Production
   Payable silver         ('000 ounces)     10,265      9,612      8,326      8,773      8,161         34,872     35,964
   Payable lead           (tonnes)          63,799     61,676     57,651     58,711     59,389        237,427    231,764
   Payable zinc           (tonnes)          12,511     15,182     14,721     15,480     18,479         63,862     58,856
   Sales
   Payable silver         ('000 ounces)     10,788      9,401      9,081      8,956      8,412         35,850     35,448
   Payable lead           (tonnes)          67,650     59,856     62,735     57,961     58,742        239,294    229,362
   Payable zinc           (tonnes)          14,761     12,077     14,849     18,056     13,288         58,270     64,935
Selbaie, Canada
   Ore milled             ('000 tonnes)      1,016      1,049        999        919        982          3,949      4,063
   Average head grades
   - Zinc                 (%)                1.26%      1.37%      1.09%      1.11%      1.18%          1.19%      1.34%
   - Copper               (%)                0.34%      0.33%      0.28%      0.25%      0.24%          0.28%      0.34%
   - Gold                 (g/t)               0.25       0.23       0.25       0.23       0.23           0.24       0.27
   - Silver               (g/t)              28.99      35.10      22.75      22.15      20.62          25.36      30.12
   Production
   Payable zinc           (tonnes)           8,121      9,840      6,540      6,421      7,364         30,165     34,196
   Payable copper         (tonnes)           2,642      2,789      2,111      1,654      1,768          8,322     10,186
   Payable gold           (ounces)           5,117      4,486      5,069      4,146      4,081         17,782     22,201
   concentrate
   Payable silver         ('000 ounces)        524        593        369        279        284          1,525      2,073
   Sales
   Payable zinc           (tonnes)           7,877      9,861      7,245      6,649      6,812         30,567     34,464
   Payable copper         (tonnes)           2,459      2,823      2,107      2,751      1,612          9,293     10,876
   Payable gold           (ounces)           5,142      5,932      3,082      5,508      4,280         18,802     26,304
   concentrate
   Payable silver         ('000 ounces)        573        527        478        444        355          1,804      1,783
Pering, South Africa (a)
   Ore milled             ('000 tonnes)        338        320        288        151          -            759      1,349
   Average head grades
   - Zinc                 (%)                1.85%      2.21%      3.34%      3.47%          -          2.89%      1.88%
   - Lead                 (%)                0.52%      0.66%      0.40%      0.33%          -          0.50%      0.49%
   Production
   Payable zinc           (tonnes)           4,793      5,331      7,430      4,335          -         17,096     21,115
   Payable lead           (tonnes)             969      1,567        694        354          -          2,615      4,302
   Sales
   Payable zinc           (tonnes)           3,667      3,701      6,179      5,343      4,466         19,689     18,203
   Payable lead           (tonnes)             729      1,367      1,327        995        117          3,806      4,610
   (a) Production ceased, ahead of mine closure, in February 2003.
San Manuel, USA (a)
   Production
   Copper cathode (SXEW)  ('000 tonnes)          -          -          -          -          -              -        6.3
   (a) San Manuel SXEW operations closed in March 2002.
Pinto Valley, USA
   Production
   Copper cathode (SXEW)  ('000 tonnes)        2.8        2.8        2.7        2.5        2.6           10.6       12.8
   Sales
   Copper cathode (SXEW)  ('000 tonnes)        2.9        2.7        2.6        2.6        2.6           10.5       12.7
PRODUCTION AND SHIPMENT REPORT
                                                           QUARTER ENDED                               YEAR ENDED
                                          JUNE       SEPT       DEC       MARCH       JUNE           JUNE       JUNE
                                          2002       2002       2002       2003       2003           2003       2002
CARBON STEEL MATERIALS
BHP Billiton attributable production and sales unless otherwise stated.
('000 tonnes)
IRON ORE (a)
Pilbara, Australia
   Production
   Mt Newman Joint                          5,413      5,486      5,287      4,964      6,221         21,958     23,374
   Venture
   Goldsworthy Joint Venture (b)            1,690      1,891      1,808      1,497      1,516          6,712      6,447
   Yandi Joint Venture                      6,663      7,796      8,187      7,452      8,353         31,788     27,256
   Jimblebar                                1,476      1,433      1,186      1,371      1,428          5,418      5,201
   Total (BHP Billiton                     15,242     16,606     16,468     15,284     17,518         65,876     62,279
   share)
   Total production                        17,671     19,284     19,165     17,739     20,359         76,547     72,350
   (100%)
   Shipments
   Lump                                     4,151      4,335      4,290      4,352      4,193         17,170     14,679
   Fines                                   10,517     11,842     13,896     12,144     13,187         51,069     45,959
   Total (BHP Billiton                     14,668     16,177     18,186     16,496     17,380         68,239     60,638
   share)
   Total shipments (100%)                  17,256     19,033     21,396     19,407     20,448         80,284     71,338
   (a) Iron ore production and shipments are reported on a wet tonnes basis.
   (b) Includes bulk sample production from Mining Area C.
Samarco, Brazil
   Production                               1,838      2,022      1,979      1,953      1,902          7,856      5,629
   Shipments                                1,768      2,034      2,004      2,049      2,153          8,240      6,069
METALLURGICAL COAL (a)
Queensland, Australia
   Production
   BMA
   Blackwater                               1,669      1,633      1,603      1,668      1,937          6,841      5,843
   Goonyella                                  904        734        812      1,191      1,075          3,812      3,776
   Peak Downs                               1,185        789        757      1,009      1,076          3,631      3,828
   Saraji                                     716        427        629        599        666          2,321      2,547
   Norwich Park                               527        573        451        610        527          2,161      2,073
   South Blackwater (b)                         -          -          -          -          -              -      1,194
   Gregory/Crinum                             685        496        780        761        488          2,525      2,440
   BMA total                                5,686      4,652      5,032      5,838      5,769         21,291     21,701
   BHP Mitsui Coal (c)
   Riverside                                  928        927        400        300      1,014          2,641      3,402
   South Walker Creek                         818        936      1,072        900      1,019          3,927      3,341
   BHP Mitsui Coal total                    1,746      1,863      1,472      1,200      2,033          6,568      6,743
   Queensland total                         7,432      6,515      6,504      7,038      7,802         27,859     28,444
   Shipments
   Coking coal                              5,252      4,165      4,034      4,707      4,395         17,301     18,866
   Weak coking coal                         1,124      1,739      1,503      1,569      1,525          6,336      5,995
   Thermal coal                               734      1,022        800        852        943          3,617      2,833
   Total                                    7,110      6,926      6,337      7,128      6,863         27,254     27,694
   (a) Coal production is reported on the basis of saleable product. Production figures include some thermal coal.
   (b) BHP Billiton acquired its share of South Blackwater in July 2001. South Blackwater is equally owned by BHP
   Billiton and
   Mitsubishi Development Pty Ltd. Effective Jauary 2002, South Blackwater production is included in Blackwater.
   (c) BHP Mitsui Coal production shown on 100% basis before 20% outside equity interest.
Illawarra, Australia
   Production                               1,927      2,135      1,886      1,518      1,224          6,763      7,088
   Shipments
   Coking coal                              1,543      1,515      1,900      1,611      1,571          6,597      6,210
   Thermal coal                               268        134         95        242        179            650        547
   Total                                    1,811      1,649      1,995      1,853      1,750          7,247      6,757
MANGANESE ORES
South Africa
   Saleable production                        475        581        560        534        574          2,249      1,867
   (a)
   (a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.
Australia
   Saleable production                        309        514        499        356        484          1,853      1,668
   (a)
   (a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.
MANGANESE ALLOYS
South Africa
   Saleable production                        121        124        125        117        137            503        406
   (a)
   (a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.
Australia
   Saleable production                         48         51         65         60         58            234        212
   (a)
   (a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.
HOT BRIQUETTED IRON
Boodarie(TM) Iron,
Australia (a)
   Production                                   -        333        414        465        458          1,670      1,047
   Shipments                                   93        202        464        416        487          1,569      1,144
   (a) Boodarie Iron recommenced production in July 2002 following the suspension of operations due to a tube failure
   in a gas
   re-heating furnace.
PRODUCTION AND SHIPMENT REPORT
                                                            QUARTER ENDED                               YEAR ENDED
                                           JUNE       SEPT       DEC       MARCH       JUNE           JUNE       JUNE
                                           2002       2002       2002       2003       2003           2003       2002
DIAMONDS AND SPECIALTY PRODUCTS
BHP Billiton attributable production and sales unless otherwise stated.
DIAMONDS
Ekati(TM), Canada
   Ore Processed (100%)   ('000 tonnes)        883        996      1,045      1,087      1,182          4,310      3,354
   Production             ('000 carats)      1,023        954      1,071      1,015      1,300          4,340      3,650
PRODUCTION AND SHIPMENT REPORT
                                                            QUARTER ENDED                               YEAR ENDED
                                           JUNE       SEPT       DEC       MARCH       JUNE           JUNE       JUNE
                                           2002       2002       2002       2003       2003           2003       2002
ENERGY COAL
BHP Billiton attributable production and sales unless otherwise stated.
('000 tonnes)
Ingwe, South Africa
   Production                               13,815     13,838     13,333     13,256     13,812         54,239     55,710
   Sales
   Export                                    5,744      5,648      6,609      5,696      6,339         24,292     23,721
   Local utility                             7,767      7,836      7,263      7,160      7,926         30,185     29,003
   Inland                                      742        471        412        340        337          1,560      3,780
   Total                                    14,253     13,955     14,284     13,196     14,602         56,037     56,503
New Mexico, USA
   Production
   Navajo Coal                               2,030      1,602      2,154      1,797      2,497          8,050      7,207
   San Juan Coal (a)                         1,673      1,198      2,185      1,350      1,380          6,113      6,038
   Total                                     3,703      2,800      4,339      3,147      3,877         14,163     13,245
   Sales - local utility                     3,469      3,546      3,348      3,316      3,643         13,853     13,247
   (a) Includes production from longwall operations commenced at San Juan in October 2002.
Hunter Valley, Australia
   Production                                1,390      1,244      1,234      1,922      2,041          6,441      4,555
   Sales
   Export                                    1,056        783        881      1,036      1,301          4,001      3,135
   Inland                                      337        366        276        704      1,285          2,631      1,455
   Total                                     1,393      1,149      1,157      1,740      2,586          6,632      4,590
Kalimantan, Indonesia
   Production (a)
   Senakin (b)                                   -          -          -          -          -              -      1,962
   Satui (b)                                     -          -          -          -          -              -      1,845
   Petangis (c)                                208        216         29         28          -            273        815
   Total                                       208        216         29         28          -            273      4,622
   Sales - export                              243        189         49         56          -            294      4,481
   (a) Reported on 86.5% basis after allowing for the Indonesian state-owned corporation's 13.5% share of all
   production.
   (b) BHP Billiton sold its interest in Senakin and Satui effective 30 November 2001.
   (c) Mining operations at Petangis ceased in October 2002.
Cerrejon Coal, Colombia
(a)
   Production                                1,455      1,231      1,713      1,382      2,261          6,587      4,703
   Sales - export                            1,144      1,246      1,851      1,971      2,247          7,315      3,901
   (a) BHP Billiton increased its interest in CZN from 16.7% to 33.3% effective February 2002.
PRODUCTION AND SHIPMENT REPORT
                                                            QUARTER ENDED                               YEAR ENDED
                                           JUNE       SEPT       DEC       MARCH       JUNE           JUNE       JUNE
                                           2002       2002       2002       2003       2003           2003       2002
STAINLESS STEEL MATERIALS
BHP Billiton attributable production and sales unless otherwise stated.
('000 tonnes)
NICKEL
CMSA, Colombia
    Production                                 9.9       11.7       11.9       11.1       12.2           46.9       40.4
    Sales                                     11.6       10.5       12.8       10.3       13.5           47.1       41.6
Yabulu, Australia
    Production
    Nickel                                     7.8        7.4        7.5        7.5        8.8           31.2       28.5
    Cobalt                                     0.4        0.5        0.5        0.4        0.5            1.9        1.7
    Sales
    Nickel                                     7.1        7.1        8.3        8.1        9.5           33.0       29.0
    Cobalt                                     0.5        0.5        0.5        0.5        0.5            2.0        1.9
CHROME ORES
South Africa
    Saleable production                        664        713        714        679        720          2,826      2,451
    (a)
    (a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.
FERROCHROME
South Africa
    Saleable production                        223        238        230        263        259            990        837
    (a)
    (a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.


BHP Billiton Limited ABN 49 004 028 077                 BHP Billiton Plc Registration number 3196209
Registered in Australia                                 Registered in England and Wales
Registered Office: 600 Bourke Street Melbourne Victoria Registered Office: Neathouse Place London SW1V 1BH United
3000                                                    Kingdom
Telephone +61 3 9609 3333 Facsimile +61 3 9609 3015     Telephone +44 20 7802 4000 Facsimile +44 20 7802 4111

              The BHP Billiton Group is headquartered in Australia






                      This information is provided by RNS
            The company news service from the London Stock Exchange
END

MSCEAAXLAALDEEE