FOR:  TALISMAN ENERGY INC.

TSX, NYSE SYMBOL:  TLM

September 21, 2007

Talisman Energy Announces First Oil From Its Duart Development

CALGARY, ALBERTA--(Marketwire - Sept. 21, 2007) - Talisman Energy (UK) Limited, a wholly owned subsidiary of
Talisman Energy Inc. (TSX:TLM) (NYSE:TLM), has commenced production from the Duart field approximately two
months ahead of schedule.

The Duart field was discovered in 1988 and is located 116 miles northeast of Aberdeen in Block 14/20b,
approximately five miles west of the Tartan platform. The field was developed with a single well tied back to
the Tartan platform. Duart oil will be exported via the Flotta system, together with other Tartan area
production. Initial production rates are expected to exceed 6,000 bbls/d.

The field is an integral part of Talisman's plans to prolong the life of both the Tartan platform and the
Flotta export system. Talisman Energy (UK) Limited operates the Duart field with a 50% interest and the
remaining 50% is owned by Nexen Petroleum U.K. Limited.

Talisman Energy Inc. is an independent upstream oil and gas company headquartered in Calgary, Alberta, Canada.
Talisman has operations in Canada and its subsidiaries operate in the North Sea, Southeast Asia, Australia,
North Africa, the United States and Trinidad and Tobago. Talisman's subsidiaries are also active in a number of
other international areas. Talisman is committed to conducting its business in an ethically, socially and
environmentally responsible manner. The Company is a participant in the United Nations Global Compact and
included in the Dow Jones Sustainability (North America) Index, as well as the Jantzi Social Index. Talisman's
shares are listed on the Toronto Stock Exchange in Canada and the New York Stock Exchange in the United States
under the symbol TLM.

Forward-Looking Statements

This news release contains statements that constitute forward-looking statements or forward-looking information
(collectively "forward-looking statements") within the meaning of applicable securities legislation. These
forward-looking statements include statements regarding: initial production estimates from the Duart field;
intended pipeline network and processing facility to be utilized; business plans; and other expectations,
beliefs, plans, goals, objectives, assumptions, information and statements about possible future events,
conditions, results of operations or performance.

Often, but not always, forward-looking statements use words or phrases such as: "expects," "does not expect" or
"is expected," "anticipates" or "does not anticipate," "plans" or "planned," "estimates" or "estimated,"
"projects" or "projected," "forecasts" or "forecasted," "believes," "intends," "likely," "possible,"
"probable," "scheduled," "positioned," "goals," or "objectives" or state that certain actions, events or
results "may," "could," "would," "might" or "will" be taken, occur or be achieved.

Undue reliance should not be placed on forward-looking statements. Forward-looking statements are based on
current expectations, estimates and projections that involve a number of risks and uncertainties, which could
cause actual results to differ materially from those anticipated by Talisman and described in the forward-
looking statements. These risks and uncertainties include:

- the risks of the oil and gas industry, such as operational risks in exploring for, developing and producing
crude oil and natural gas, market demand and unpredictable facilities outages;

- risks and uncertainties involving geology of oil and gas deposits;

- the uncertainty of reserves estimates, reserves life and underlying reservoir risk;

- the uncertainty of estimates and projections relating to production, costs and expenses;

- potential delays or changes in plans with respect to development projects;

- risk that adequate pipeline capacity to transport the gas to market may not be available;

- health, safety and environmental risks;

- changes to general economic and business conditions;

- the possibility that government policies or laws may change or governmental approvals may be delayed or
withheld; and

- the Company's ability to implement its business strategy.

Readers are cautioned that the foregoing list of risks and uncertainties is not exhaustive. Additional
information on these and other factors which could affect the Company's operations or financial results are
included: (1) under the heading "Risk Factors" in the Company's Annual Information Form; and (2) under the
headings "Management's Discussion and Analysis - Risk Factors" and elsewhere in the Company's 2006 Annual
Financial Report. Additional information may be found in the Company's other reports on file with Canadian
securities regulatory authorities and the United States Securities and Exchange Commission.

Forward-looking statements are based on the estimates and opinions of the Company's management at the time the
statements are made. The Company assumes no obligation to update forward-looking statements should
circumstances or management's estimates or opinions change, except as required by law.

Gross Production

In this news release, Talisman makes reference to estimated production volumes. Such production volumes are
estimated on a gross basis, which means they are estimated prior to the deduction of royalties and similar
payments. In the US, net production volumes are reported after the deduction of these amounts.


-30-

FOR FURTHER INFORMATION PLEASE CONTACT:

Talisman Energy Inc.
David Mann, Senior Manager,
Corporate & Investor Communications
(403) 237-1196
(403) 237-1210 (FAX)
Email: tlm@talisman-energy.com

OR

Talisman Energy Inc.
Christopher J. LeGallais
Senior Manager, Investor Relations
(403) 237-1957
(403) 237-1210 (FAX)
Email: tlm@talisman-energy.com
Website: www.talisman-energy.com

INDUSTRY:  Energy and Utilities-Oil and Gas
SUBJECT:   OEX

-0-

                                                                
Talisman Energy Inc.



                                                                

Citi Fun 25 (LSE:AN26)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Citi Fun 25 Charts.
Citi Fun 25 (LSE:AN26)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Citi Fun 25 Charts.