DAMASCUS, Md., Sept. 23 /PRNewswire-FirstCall/ -- Syndication Inc., (Pink Sheets: SYNJ), reports that McCutcheon Marshall Jr., President and Chairman of the Board for Sentinel Renewable Energy S.C. Inc. and Pinnacle Energy Inc., the wholly owned energy subsidiary of Syndication Inc., is considering a number of candidates for the engineering supervisory position for the Companies 75,000 sq. ft. warehouse project. The Company is considering a number of project managers that would be qualified to operate the Denami 600 series Bio Diesel manufacturing processor. Those qualifications are best articulated by the listed specs below: Denami 600 Turnkey Production Line: Includes: -- Two (2) Denami 600 Biodiesel Processors -- One (1) Environmental Checklist -- On-site installation and commissioning for up to Five (5) days -- On-site training for up to Five (5) days. SAID training may, or will be done after Installation but during or after Commissioning. Additional Major components (these components are based on a typical site as shown in Methes's facility in Mississauga and there may be changes or adjustments that will be reflected in the total price): Major Component Detail Description Qty Insulated Tanks Insulated Storage Tank 7 15,000 gallon vertical storage tank (11.5 x 19 feet) 4 Insulation 2" insulation with cladding 4 Heating coil 4 Level Sensor Level Sensor - Ultra Sonic 4 Fire Rated Valves 3 C.S. Full Port 150 lb. FLGD Ball Valve; Fire Safe 4 Teflon Gasket 1/16 Teflon Gasket 4 Blind Valve STD WELD BLIND FLANG 4 Custom Pipe Weld Assembly's 4 3" ball valves 3 C.S. Full Port 150 lb. FLGD Ball Valves 4 1" ball valves 1 in C.S. 3 PC Full Port Ball Valves 4 Sample Ports 3 Sample Ports (Top, Middle and Bottom) 4 Non-Insulated Tanks Non Insulated Storage Tanks 15,000 gallon vertical storage tank (11.5 x 19 feet) 7 Heating coils 7 Level Sensor Level Sensor - Ultra Sonic 7 Fire Rated Valves 3 C.S. Full Port 150 lb. FLGD Ball Valve Fire Safe 7 Teflon Gasket 1/16 Teflon Gaskets 7 Blind Valve STD WELD BLIND FLANGE 7 Custom Pipe Weld Assembly's 7 3" ball valves 3 C.S. Full Port 150 lb. FLGD Ball Valves 7 1" ball valves 1 in C.S. 3 PC Full Port Ball Valve 7 Sample Ports 3 Sample Ports (Top, Middle and Bottom) 7 Methanol Tank Flammable Storage Tank 12,000 gallon Double Wall vertical storage tank (11 x 15 feet) 1 Level Sensor Level Sensor - Ultra Sonic 1 Level Sensor Level Sensor - Tuning Fork 1 Habonim Ball Valve 2" Fire Safe Type Stainless Ball Valve 1 Habonim Ball Valve 1 Fire Safe Type Stainless Ball Valve 1 12" Vent 1 2" Emergency Pressure Vent 1 2" Working Vent End of line Blanketing Valve 1 Blanketing Valve Nitrogen Blanketing Valve 1 Tank Farm Piping 1 Loading and Unloading 3 Blackpipes, 1" Blackpipes (Victaulic) 3 Heat Trace Heat Cable, 20 Watts per ft. with Jacket 160 Power Connection Kit 110 V Power Connection Kit 4 Temperature Switch Temperature Regulator 2 Insulation 1" Fibreglass insulation 160 Tank Farm Piping 2 Methanol Line 2" Stainless Steel 2 Service Lines Hot water, cooling water and Nitrogen Service lines to the biodiesel processor 5 Containment wall Concrete Block Wall to hold 110% by volume of the largest tank 1 Seal Containment Wall proxy seal 1 Wall Cap Stainless steel Cap 1 Ladder For access into the containment wall Fire Rated Room 2 hr. fire-rated room 30 ft. to the steel deck plus one double steel frame and doors (subject to permitting) 1 Loading Rack; Rack Frame Stainless Stain Frame 1 Pump 7 1/2 HP Centrifugal Pump 3 Filters Filter Bag housing, gooseneck style 3 Truck Hoses 2 Tank Truck Hoses 15 ft. 30; Truck Sample Probe For sample collection from truck before loading 1 Composite Hose 2" x 25 1 Composite Hose 2" x 40 Tote Containment; Tote Containment for Catalyst 2 Boiler 500,000 BTU/hr 1 Air Compressor 7.5 HP, with Air Dryer 1 Material Handling Equipment 1 Booster Pump; To bring feedstock into the machine at a set PSI 1 Nitrogen Generator 1 CFM Nitrogen Generator 1 10 CFM Air Dryer 1 Parker Filter 1 Parker Autodrain 1 Safety Equipment; Eye Wash Station 1 LEL Meter Lower Explosive Limit Meter 1 Safety Glasses 1 First Aid Kit 2 MSDS Binder 3 Supplies Spill containment booms 15 ft., 8" Thick 5 Shovels 2 Brooms 2 Mops 2 Dry/Wet Vacuum 1 Work Bench 2 Construction and Installation; Epoxy Floor Up to 3500 square feet 1 Erect and install tanks 1 Feedstock Chemical Kit Wet Chemistry Kit to test for FFA Level 15 Centrifuge to Test for Water and Sediment "Mac is looking for a pro. This is not a light weight project and his pick would have to be one of the best in the Bio-Diesel production industry. The Denami 600 is arguably the most advanced Bio Diesel manufacturing system on the Globe because, it is able to produce Bio-Fuel from wet or dry feed stock based on the price of the futures markets, (soybean, corn, beef skin, poultry skin or pork skin and the price per gallon at the pump). I stay out of Mac's Office because, he is better at this than I am. He is running the program and he is the best at it," said Brian Sorrentino the CEO of Syndication Inc. The CEO would like to remind and reinforce the shareholders of the pending RECORD DATE of the 2% dividend that is to be paid on all shares owned as of the record date 'October 19th 2009'. "The dividend policy of the Company is designed to increase equity valuation, enhance the potential for equity investment, discourage short trading activity and, most importantly, foster a longer term investor attitude. As the growth in valuation of the Company becomes realized the dividends will become a strong attraction to new shareholders," said Sorrentino. The Company indicates that additional announcements are pending. This press release may contain forward-looking statements covered within the meaning of the Private Securities Litigation Reform Act of 1995. These forward-looking statements relate to, among other things, plans and timing for the introduction or enhancement of our services and products, statements about future market conditions, supply and demand conditions, and other expectations, intentions and plans contained in this press release that are not historical fact and involve risks and uncertainties. Our expectations regarding future revenues depend upon our ability to develop and supply products, which we may not produce today and that meet defined specifications. When used in this press release, the words "plan," "expect," "believe," and similar expressions generally identify forward-looking statements. These statements reflect our current expectations. They are subject to a number of risks and uncertainties, including, but not limited to, changes in technology and changes in pervasive markets. Contact Information: Syndication Inc, Brian Sorrentino Phone # 888-422-5515 For all mail correspondence: Box 503, Damascus, MD 20872 DATASOURCE: Syndication Inc. CONTACT: Brian Sorrentino of Syndication Inc, 1-888-422-5515

Copyright