Carpathian Gold Inc. (TSX:CPN) (the "Corporation" or "Carpathian") is pleased to
announce the initial results from its 2009, Phase II Drill Program at the 100%
owned Riacho Dos Machados gold project ("RDM") located in Minas Gerais State,
Brazil. A total of 18,000 to 22,000 metres of drilling is planned for this Phase
II program and follows the results from the initial NI 43-101 Resource Estimate
announced on May 18th and the results from a Preliminary Economic Assessment
("PEA") announced on August 17th. Two diamond core drill rigs and one reverse
circulation ("RC") drill rig are presently active. The RC drill rig is used
principally for pre-collars and for short drill-holes through the mineralized
zone above the water table or only where dry samples can be obtained.


The principle objective of the Phase II drill program is to upgrade the open-pit
inferred resources to the Measured + Indicated categories as well as extend its
strike length for use in a planned feasibility study in late 2009/early 2010.
The drill program started on May 23rd and to date 34 drill holes have been
completed for a total of approximately 7,000 m. Results from 14 drill holes have
been received and are reported herein. In addition, results from the re-sampling
program of another 41 diamond drill holes completed prior to 1996 by the
previous operator, Companhia Vale do Rio Doce ("Vale"), are also reported.


The initial results are demonstrating good geologic and gold-grade continuity
both along strike and at depth below the existing shallow open-pit (maximum 60
m) with significant intersections (estimated true-widths) as shown by drill hole
FRM-72 which intersected 13.1 m at 2.28 g/t Au 118 m below the pit and
re-sampled Vale drill hole F-53 which intersected 12.1 m at 3.35 g/t Au only 5 m
below the pit.


Highlight assay intersections recently received for the Phase II drill program
are listed below. All of these results represent the portion of the mineralized
zone that is considered to be accessible through the deepening of the open-pit
as shown in the PEA. The gold mineralization occurs in a shear zone with the
existing open-pit developed over a strike length of 1,350 m and to depths
corresponding to top-of-fresh rock. A complete list of the assay results can be
found at the end of this press release. A map showing the location of the drill
holes completed can be found on the Corporation's website at
www.carpathiangold.com.


i) North Pit Area (known as Area V)

- 17.6 m at 2.80 g/t Au, including 1.8 m of 9.55 g/t Au (hole FD-16)

- 12.1 m at 3.35 g/t Au, including 4.0 m at 6.59 g/t Au (hole F-53)

ii) Central Pit Area (know as Area IV)

- 13.4 m at 1.16 g/t Au, including 2.7 m at 3.61 g/t Au (hole FRM 80)

- 19.5 m at 1.98 g/t Au, including 3.3 m of 6.03 g/t Au in (hole F-97)

- 11.7 m of 1.29 g/t Au, including 1.8 m of 4.48 g/t Au (hole F-116)

iii) South Pit Area (known as Area III)

- 12.3 m at 2.01 g/t Au, including 3.8 m at 4.01 g/t Au (hole FRM-70)

- 13.1 m at 2.28 g/t Au, including 4.7 m at 3.97 g/t Au (hole FRM-72)

- 6.9 m at 3.54 g/t Au, including 1.4 m at 6.87 g/t Au (hole SU-05)

Notes: Widths are approximate true thicknesses. Drill hole prefixes 'FRM' are
Carpathian drill holes and 'F', 'FD', and 'SU' are re-sampled drill core from
the Vale drill program.


"We are pleased with the initial results from our infill drill program as they
are validating the geologic model and demonstrating good gold-grade continuity
along strike and down-dip. We believe these results and further planned drilling
will provide an updated resource estimate that will support and improve the
total contained tonnes at open-pit mining grades from the initial NI 43-101
Resource Estimate released on May 18th, 2009", said Dino Titaro, President and
CEO. "We also expect that this Phase II drill program will further enhance the
robust nature of the Preliminary Economic Assessment announced August 12th,
2009, not only supporting the results with higher confidence resource category
but possibly enhancing the mine life and economics through strike extensions to
the mineralization. Engineering and environmental consultants are diligently
working with our team on the project to realize our vision of near-term open-pit
gold production from the RDM project."


Preliminary Economic Assessment Study Result Highlights

On August 18th, 2009 the Corporation announced the results of the Preliminary
Economic Assessment ("PEA") Study on the project which was based solely on the
open-pit mineralization defined in a NI 43-101 Mineral Resource Estimate
released on May 18th, 2009 (see below). The open-pit resource was constrained
within an open-pit shell utilizing the pit-optimizer software (Whittle) with
appropriate mining costs, US$800 per ounce gold price, and a 0.30 g/t Au cut-off
grade. The open-pit mine design for the PEA was constrained to the depth using a
$704 per ounce gold-price whittle pit-shell, as a strategy for lowering the risk
of the Project.


Highlights of the PEA Study include:

- Average annual production of 102,000 ounces of gold per annum over an initial
7.1 year mine life.


- Total operating cash cost of US$428 per gold ounce.

- Project after tax net present value ("NPV") of US$123.3 million based on a 5%
discount rate and a gold price of US$900 per ounce.


- Project after tax internal rate of return ("IRR") of 32.0%, with a 2.9 year
payback on Project capital expenditures, at a gold price of US$900 per ounce.


The Project will be a conventional open pit mine with down-the-hole drill rigs
and blasting, backhoe excavators, and conventional haul trucks. The processing
operation will include crushing the ore to minus 19 mm and processing it in an
industry standard carbon in leach and ADR (adsorption, desorption, and recovery)
plant followed by a detoxification process prior to placing the tailings in an
impoundment area. Based on metallurgical test work, the gold recovery is
estimated at 90%. The open pit mining operation will be at a rate of 6,000
tonnes per day with a life-of-mine average plant feed grade of 1.65 g/t gold
over a life of mine of 7.1 years.


According to the cautionary statement required by NI 43-101, it should be noted
that this assessment is preliminary in nature as it includes inferred mineral
resources that cannot be categorized as reserves at this time and as such there
is no certainty that the preliminary assessment and economics will be realized.


Initial NI 43-101 Compliant Mineral Resource Estimate

The Corporation announced the results of the initial NI 43-101 compliant
Resource Estimate on May 18th, 2009. This Resource Estimate utilized open-pit
optimization software to constrain an open-pit resource and underground resource
for material below the open pit using appropriate cutoff grades, costs, and 800
USD/ounce gold price. This open-pit is 1,700 m in length and ranges from 60 m
deep in the south extension to 270 m deep in Area III (middle to south part of
existing open-pit).


The open pit resource includes (combined oxide, transition, fresh zones and 0.30
g/t Au cut-off):


- Measured + Indicated - 4.547 M tonnes at 1.84 g/t Au for 268,800 ounces Au

- Inferred - 15.164 M tonnes at 1.56 g/t Au for 762,700 ounces Au

The underground resource includes (1.0 g/t Au cut-off):

- Measured + Indicated - 0.201 M tonnes at 3.31 g/t Au for 21,400 ounces Au

- Inferred - 2.733 M tonnes at 2.84 g/t Au for 249,700 ounces Au

The combined open pit and underground resource includes:

- Measured + Indicated - 4.748 M tonnes at 1.90 g/t Au for 290,200 ounces Au

- Inferred - 17.897 M tonnes at 1.76 g/t Au for 1,012,400 ounces Au

The underground resource has a geological potential of 12 million tonnes at 2.91
g/t Au for a total in-situ metal content of 1.12 million gold ounces. This was
determined by the independent consultant group, NCL Brasil Ltda., through the
measurement of the volume of the mineralized zone from the geological model
provided by Carpathian for the Resource Estimate, using the average grade of the
composite samples below the open-pit, less the current underground resource.
This geologic potential exists within the underground grade shell model where
data from existing drill holes is too widely spaced to properly interpolate
grade and should not be relied upon as a NI 43-101 compliant resource. Further
deep drilling will be required to ascertain the extent of this mineralization
and convert the mineralization into a resource. The grade of this underground
mineralization is similar to existing underground operating mines in Brazil.


Project Background

The RDM gold project is a 22,000 hectare land parcel comprised of 12 Exploration
Licenses and one Mining Concession that covers a 20 kilometre long north-south
shear zone. The Mining Concession hosts a past producing open-pit gold mine,
which was previously operated by Vale between 1986 and 1997 from which oxide
gold ore was mined to maximum depths of 60 m below the surface. The gold
mineralization at RDM is shear zone hosted, within a package of Precambrian aged
metamorphic rocks. This shear zone strikes 20 degrees and dips 40 to 50 degrees
west. The gold mineralization is known to be continuous over a strike length of
1,350 m and open at depth to greater than 550 m at the RDM mine-site. The 2008
drilling program has demonstrated that this mineralization is now continuous for
a strike length of at least 2,000 m.


Sample Protocol

All sample results presented in this news release are half-core from split NQ
drill core and sampled on a metre by metre basis through the mineralized zone
and into surrounding altered rock. Re-sampling of Vale drill core utilizes
mostly quarter-core samples. All samples collected from Brazil are prepared and
analyzed at the independent ISO Certified SGS laboratory, located near Belo
Horizonte, Brazil using industry standard fire assay techniques for gold on
50-gram sample charges with AAS finish. Coarse blanks, pulp blanks, pulp
duplicates, and known gold standards are inserted on a routine basis. They
consist of 20% per cent of submitted samples. In addition, on a periodic basis
3% of the crusher rejects are re-submitted and a minimum of 3% of the pulps will
be analyzed at the ISO Certified ALS Chemex Laboratory near Belo Horizonte,
Brazil for check assays.


Mr. Titaro is the qualified person (as defined in National Instrument 43-101)
overseeing the design and implementation of the present exploration programs. He
is responsible for preparing the technical information contained in this news
release.


Carpathian is an exploration and development company whose primary business
interest is developing near-term gold production on its 100% owned Riacho dos
Machados Gold Project in Brazil along with progressing its exploration and
development plans on its 100% owned Rovina Valley Au-Cu project located in
Romania.


Forward-Looking Statements: This press release includes certain statements that
may be deemed "forward-looking statements". Forward-looking statements are
frequently characterized by words such as "plan", "expect", "project", "intend",
"believe", "anticipate", "estimate", and other similar words, or statements that
certain events or conditions "may" or "will" occur. All statements in this
release, other than statements of historical facts, that address future
exploration drilling, exploration activities and events or developments that the
Corporation expects, are forward-looking statements. Although the Corporation
believes the expectations expressed in such forward-looking statements are based
on reasonable assumptions, such statements are not guarantees of future
performance and actual results or developments may differ materially from those
in forward-looking statements. Factors that could cause actual results to differ
materially from those in forward-looking statements include market prices,
exploitation and exploration successes, continued availability of capital and
financing, and general economic, market or business conditions. There can be no
assurance that forward-looking statements will prove to be accurate, as results
and future events could differ materially from those anticipated statements. The
Corporation undertakes no obligation to update forward-looking statements if
circumstances or management's estimates or opinions should change. The reader is
cautioned not to place undue reliance on forward-looking statements.




Table I. Diamond drill hole assay intersections from Phase II Carpathian
drilling program at the RDM project, Minas Gerais, Brazil, August 2009.

----------------------------------------------------------------------------
----------------------------------------------------------------------------
                                                          True
Drill                From        To      Length      Thickness           Au
Hole        Area       (m)       (m)         (m)            (m)        (g/t)
----------------------------------------------------------------------------
FRM-65       III    126.5     130.5         4.0            3.6         2.23
----------------------------------------------------------------------------
FRM-66       III    141.5     144.5         3.0            2.8         1.12
----------------------------------------------------------------------------
                    157.5     169.5        12.0           11.5         1.74
----------------------------------------------------------------------------
Incl.               164.5     169.5         5.0            4.8         3.08
----------------------------------------------------------------------------
FRM-67       III    133.5     138.5         5.0            4.7         1.81
----------------------------------------------------------------------------
                    150.5     153.5         3.0            2.8          1.1
----------------------------------------------------------------------------
FRM-68       III    122.1     124.1         2.0            1.9         1.04
----------------------------------------------------------------------------
                    134.1     138.1         4.0            3.7         2.28
----------------------------------------------------------------------------
FRM-69       III   141.65    153.65        12.0           11.6         0.93
----------------------------------------------------------------------------
Incl.              141.65    146.65         5.0            4.8         1.69
----------------------------------------------------------------------------
                   156.65    158.65         2.0            1.9         1.04
----------------------------------------------------------------------------
FRM-70       III    138.1     151.1        13.0           12.3         2.01
----------------------------------------------------------------------------
Incl.               144.1     148.1         4.0            3.8         4.01
----------------------------------------------------------------------------
FRM-71       III      116       118         2.0            1.9         1.59
----------------------------------------------------------------------------
                      122       130         8.0            7.6         1.02
----------------------------------------------------------------------------
Incl.                 125       127         2.0            1.9         2.06
----------------------------------------------------------------------------
FRM-72       III      158       163         5.0            4.6         4.98
----------------------------------------------------------------------------
Incl.                 160       162         2.0            1.9          9.8
----------------------------------------------------------------------------
                      167       169         2.0            1.9         1.63
----------------------------------------------------------------------------
                      178       192        14.0           13.1         2.28
----------------------------------------------------------------------------
Incl.                 180       185         5.0            4.7         3.97
----------------------------------------------------------------------------
FRM-76        IV      166       168         2.0            1.9         1.24
----------------------------------------------------------------------------
                      173       182         9.0            8.8         0.88
----------------------------------------------------------------------------
Incl.                 173       182         3.0            2.9         1.37
----------------------------------------------------------------------------
FRM-77        IV   172.63    178.63         6.0            5.9         1.44
----------------------------------------------------------------------------
Incl.              172.63    175.63         3.0            2.9         2.21
----------------------------------------------------------------------------
                   206.63    208.63         2.0            1.9         1.15
----------------------------------------------------------------------------
FRM-78        IV      178       181         3.0            2.9         1.22
----------------------------------------------------------------------------
                      222       225         3.0            2.9         1.13
----------------------------------------------------------------------------
FRM-79        IV      199       201         2.0            1.9         3.33
----------------------------------------------------------------------------
                      233       242         9.0            8.5         0.58
----------------------------------------------------------------------------
FRM-80        IV   214.65    229.65        15.0           13.4         1.16
----------------------------------------------------------------------------
Incl.              223.65    226.65         3.0            2.7         3.61
----------------------------------------------------------------------------
FRM-81        IV     82.5      85.5         3.0            2.9          1.1
----------------------------------------------------------------------------
                    102.5     104.5         2.0            1.9         4.58
----------------------------------------------------------------------------
                    119.5     122.5         3.0            2.9         0.99
----------------------------------------------------------------------------
                    133.5     141.5         8.0            7.9         0.58
----------------------------------------------------------------------------
----------------------------------------------------------------------------

Notes: Assay intersections are calculated using a 0.30 g/t Au cut-off and
maximum allowable dilution of three consecutive metres at less than 0.30 g/t
Au. NSI equals no significant intersection. Drill hole details i.e. Azimuth,
declination and total depth are shown in Drill Hole Descriptions in Table
III below.



Table II. Diamond drill hole assay intersections from Carpathian Phase II
re-sampling and assays of diamond core drilled by Vale at the RDM project,
Minas Gerais, Brazil, August 2009.

----------------------------------------------------------------------------
----------------------------------------------------------------------------
                                                          True
Drill               From         To      Length      Thickness           Au
Hole        Area      (m)        (m)         (m)            (m)        (g/t)
----------------------------------------------------------------------------
F-27          IV      86        102        16.0           15.9         1.52
----------------------------------------------------------------------------
Incl.                 88         96         8.0            7.9         2.21
----------------------------------------------------------------------------
F-29   North Ext.      9         11         2.0            1.9         1.14
----------------------------------------------------------------------------
F-41         III     134        143         9.0            8.2         1.36
----------------------------------------------------------------------------
Incl.                134        135         1.0            0.9         7.49
----------------------------------------------------------------------------
F-53           V      32         47        15.0           12.1         3.35
----------------------------------------------------------------------------
Incl.                 40         45         5.0            4.0         6.59
----------------------------------------------------------------------------
                      57         62         5.0            4.1         2.35
----------------------------------------------------------------------------
F-54         III      67         80        13.0           10.8         1.42
----------------------------------------------------------------------------
Incl.                 78         80         2.0            1.7         4.57
----------------------------------------------------------------------------
F-55          IV      30         32         2.0            1.6         1.05
----------------------------------------------------------------------------
                      54         73        19.0           15.5         0.84
----------------------------------------------------------------------------
Incl.                 69         73         4.0            3.3         1.78
----------------------------------------------------------------------------
F-57                  51         54         3.0            2.4          1.7
----------------------------------------------------------------------------
F-62         III      53         67        14.0           11.0         0.71
----------------------------------------------------------------------------
Incl.                 53         56         3.0            2.4         2.04
----------------------------------------------------------------------------
                      75         86        11.0            8.7         1.31
----------------------------------------------------------------------------
Incl.                 79         82         3.0            2.4         2.24
----------------------------------------------------------------------------
F-64          IV     122        126         4.0            3.5         2.63
----------------------------------------------------------------------------
F-65         III      44         52         8.0            6.5         2.31
----------------------------------------------------------------------------
Incl.                 46         48         2.0            1.6          6.9
----------------------------------------------------------------------------
                      62         75        13.0           10.7         0.75
----------------------------------------------------------------------------
Incl.                 72         75         3.0            2.5         1.47
----------------------------------------------------------------------------
F-68         III      63         73        10.0            8.5         1.42
----------------------------------------------------------------------------
F-69          IV      49         59        10.0            7.8         0.88
----------------------------------------------------------------------------
Incl.                 50         54         4.0            3.1         1.57
----------------------------------------------------------------------------
F-70   South Ext.     42         43         1.0            0.8         1.16
----------------------------------------------------------------------------
F-71         III      65         72         7.0            5.6         2.14
----------------------------------------------------------------------------
Incl.                 65         67         2.0            1.6         3.78
----------------------------------------------------------------------------
F-91   North Ext.      9         17         8.0            6.2         1.18
----------------------------------------------------------------------------
                      32         36         4.0            3.2         1.76
----------------------------------------------------------------------------
F-95         III      47         53         6.0            4.8         1.36
----------------------------------------------------------------------------
F-97          IV      42         66        24.0           19.5         1.98
----------------------------------------------------------------------------
Incl.                 60         64         4.0            3.3         6.03
----------------------------------------------------------------------------
F-108         IV      94        100         6.0            5.2         4.07
----------------------------------------------------------------------------
                     134        141         7.0            6.3          1.1
----------------------------------------------------------------------------
F-109         IV      11         22        11.0            8.6          0.8
----------------------------------------------------------------------------
Incl.                 20         22         2.0            1.6         2.28
----------------------------------------------------------------------------
                      43         50         7.0            5.7         1.59
----------------------------------------------------------------------------
F-116         IV     140        153        13.0           11.7         1.29
----------------------------------------------------------------------------
Incl.                140        142         2.0            1.8         4.48
----------------------------------------------------------------------------
F-117          V      61         75        14.0           11.5         0.96
----------------------------------------------------------------------------
Incl.                 61         67         6.0            4.9          1.2
----------------------------------------------------------------------------
F-120         IV      56         58         2.0            1.6         3.01
----------------------------------------------------------------------------
                     114        117         3.0            2.7         1.38
----------------------------------------------------------------------------
F-122          V      96        110        14.0           12.4         1.01
----------------------------------------------------------------------------
Incl.                 96         98         2.0            1.8         2.66
----------------------------------------------------------------------------
F-131        III      14         15         1.0            0.8            1
----------------------------------------------------------------------------
F-132        III      18         19         1.0            0.8         1.08
----------------------------------------------------------------------------
F-133  South Ext.     22         24         2.0            1.5         1.68
----------------------------------------------------------------------------
F-134  South Ext.     14         21         7.0            5.4         1.16
----------------------------------------------------------------------------
Incl.                 20         21         1.0            0.8         4.07
----------------------------------------------------------------------------
F-135  South Ext.     15         18         3.0            2.3          1.1
----------------------------------------------------------------------------
F-136  South Ext.     14         19         5.0            3.8         1.21
----------------------------------------------------------------------------
F-137  South Ext.      7          8         1.0            0.8         1.03
----------------------------------------------------------------------------
F-138  South Ext.     19         22         3.0            2.3         0.37
----------------------------------------------------------------------------
F-141        III      14         16         2.0            1.5         0.41
----------------------------------------------------------------------------
F-142          V   126.9      134.9         8.0            7.1          1.1
----------------------------------------------------------------------------
                   139.9      146.9         7.0            6.3         1.87
----------------------------------------------------------------------------
Incl.              142.9      144.9         2.0            1.8         3.27
----------------------------------------------------------------------------
FD-16          V      37       40.7         3.0            2.6         1.08
----------------------------------------------------------------------------
                      52         55         3.0            2.7         1.47
----------------------------------------------------------------------------
                      62         81        19.0           17.6         2.80
----------------------------------------------------------------------------
Incl.                 62         64         2.0            1.8         9.55
----------------------------------------------------------------------------
FD-18         IV     156        158         2.0            2.0         1.73
----------------------------------------------------------------------------
FD-20         IV     129        131         2.0            1.9         1.14
----------------------------------------------------------------------------
FD-23         IV     130        136         6.0            5.4         1.89
----------------------------------------------------------------------------
Incl.                134        136         2.0            1.8         3.63
----------------------------------------------------------------------------
FD-25          V     NSI
----------------------------------------------------------------------------
SU-05        III      24         34        10.0            6.9         3.54
----------------------------------------------------------------------------
Incl.                 26         28         2.0            1.4         6.87
----------------------------------------------------------------------------
SU-29        III      11         17         6.0            4.6         1.48
----------------------------------------------------------------------------
                      31         37         6.0            4.6         1.06
----------------------------------------------------------------------------
SU-39        III      16         23         7.0            6.3         5.19
----------------------------------------------------------------------------
----------------------------------------------------------------------------

Notes: Assay intersections are calculated using a 0.30 g/t Au cut-off and
maximum allowable dilution of three consecutive metres at less than 0.30 g/t
Au. Drill hole details ie. Azimuth, declination and total depth are shown in
Drill Hole Descriptions in Table III below.



Table III. Details for drill holes completed by Carpathian at the RDM
Project during Phase II drill program to August, 2009 with label prefix
FRM-xx. Also included are diamond drill holes completed by Vale which
Carpathian has re-sampled and assayed with drill hole prefix F-xx during the
Phase II drill program to August 2009.

----------------------------------------------------------------------------
----------------------------------------------------------------------------
Drill                             Azimuth(ii)    Declination    Total Depth
Hole        Area     Northing(i)    (degrees)       (degrees)            (m)
----------------------------------------------------------------------------
FRM-65       III          9,539          270             -81          161.3
----------------------------------------------------------------------------
FRM-66       III          9,704          270             -73          211.0
----------------------------------------------------------------------------
FRM-67       III          9,629          270             -76          169.3
----------------------------------------------------------------------------
FRM-68       III          9,668          270             -79          154.7
----------------------------------------------------------------------------
FRM-69       III          9,747          270             -76          196.6
----------------------------------------------------------------------------
FRM-70       III          9,575          270             -71          160.8
----------------------------------------------------------------------------
FRM-71       III          9,483          270             -76          161.3
----------------------------------------------------------------------------
FRM-72       III          9,895          270             -83          221.3
----------------------------------------------------------------------------
FRM-76        IV         10,005          270             -73          196.7
----------------------------------------------------------------------------
FRM-77        IV         10,124          270             -61          240.1
----------------------------------------------------------------------------
FRM-78        IV         10,078          270             -73          240.2
----------------------------------------------------------------------------
FRM-79        IV         10,121          270             -70          260.3
----------------------------------------------------------------------------
FRM-80        IV         10,016          270             -82          249.4
----------------------------------------------------------------------------
FRM-81        IV         10,187          275             -63          160.1
----------------------------------------------------------------------------
F-27          IV         10,361          269             -60          112.6
----------------------------------------------------------------------------
F-29   North Ext.        10,924          270             -60           44.0
----------------------------------------------------------------------------
F-34         III          9,775           NA             -90           52.4
----------------------------------------------------------------------------
F-41         III          9,460           NA             -90          159.4
----------------------------------------------------------------------------
F-53           V         10,591           NA             -90           83.5
----------------------------------------------------------------------------
F-54         III          9,518           NA             -90           97.4
----------------------------------------------------------------------------
F-55          IV         10,386           NA             -90           79.9
----------------------------------------------------------------------------
F-57          IV         10,377           NA             -90           63.1
----------------------------------------------------------------------------
F-62         III          9,982           NA             -90          105.5
----------------------------------------------------------------------------
F-64          IV         10,080           NA             -90          193.5
----------------------------------------------------------------------------
F-65         III          9,887           NA             -90           96.0
----------------------------------------------------------------------------
F-68         III          9,691           NA             -90           92.2
----------------------------------------------------------------------------
F-69          IV         10,078           NA             -90          115.9
----------------------------------------------------------------------------
F-70   South Ext.         9,292           NA             -90           59.8
----------------------------------------------------------------------------
F-71         III          9,589           NA             -90           87.8
----------------------------------------------------------------------------
F-91   North Ext.        10,942           NA             -90           60.2
----------------------------------------------------------------------------
F-92         III          9,625           NA             -90           44.7
----------------------------------------------------------------------------
F-95         III          9,826           NA             -90           55.9
----------------------------------------------------------------------------
F-97          IV         10,030           NA             -90           75.5
----------------------------------------------------------------------------
F-108         IV         10,035           NA             -90          171.5
----------------------------------------------------------------------------
F-109         IV         10,128           NA             -90           79.0
----------------------------------------------------------------------------
F-116         IV         10,386           NA             -90          203.3
----------------------------------------------------------------------------
F-117          V         10,425           NA             -89           90.1
----------------------------------------------------------------------------
F-120         IV         10,270           NA             -90          160.2
----------------------------------------------------------------------------
F-122          V         10,493           NA             -90          172.0
----------------------------------------------------------------------------
F-131        III          9,466           NA             -90           24.9
----------------------------------------------------------------------------
F-132        III          9,438           NA             -90           27.1
----------------------------------------------------------------------------
F-133  South Ext.         9,368           NA             -90           26.1
----------------------------------------------------------------------------
F-134  South Ext.         9,344           NA             -90           26.1
----------------------------------------------------------------------------
F-135  South Ext.         9,318           NA             -90           34.5
----------------------------------------------------------------------------
F-136  South Ext.         9,296           NA             -90           25.4
----------------------------------------------------------------------------
F-137  South Ext.         9,271           NA             -89           26.8
----------------------------------------------------------------------------
F-138  South Ext.         9,246           NA             -89           24.3
----------------------------------------------------------------------------
F-141        III          9,492           NA             -90           23.9
----------------------------------------------------------------------------
F-142          V         10,457           NA             -90          177.0
----------------------------------------------------------------------------
FD-16          V         10,630           NA             -90          118.4
----------------------------------------------------------------------------
FD-18         IV         10,035           NA             -90          194.6
----------------------------------------------------------------------------
FD-20         IV         10,200           NA             -90          193.2
----------------------------------------------------------------------------
FD-23         IV         10,385           NA             -90          189.2
----------------------------------------------------------------------------
FD-25          V         10,565           NA             -90          190.0
----------------------------------------------------------------------------
SU-05        III          9,762          211             -33           41.3
----------------------------------------------------------------------------
SU-29        III          9,853           NA              90           43.3
----------------------------------------------------------------------------
SU-39        III          9,707          309             -68           30.0
----------------------------------------------------------------------------
----------------------------------------------------------------------------

Notes: (i) All Northings are in local grid coordinates which are rotated 20
degrees west from true north. (ii) All drill hole azimuths are local grid
azimuths, i.e. rotated 20 degrees west from true north.