RNS Number:2513D
Bema Gold Corporation
23 September 2004


                                  News Release
                              Kupol Project Update
                   Exploration and Feasibility Drill Results

Vancouver, September 23, 2004 - Bema Gold Corporation (TSX / AMEX: BGO, AIM:
BAU) is pleased to announce further drilling results from the 2004 Kupol Project
exploration and feasibility drilling program.

The highlights of the recent drilling program are: the extension of high grade
mineralization 250 metres to the North at depth; the discovery of a new wide
high grade vein in the recently discovered multiple veins in the North Zone; the
discovery of a new high grade sub parallel or offset vein in the South; the
discovery of a new high grade ore shoot in the Central Zone; and ongoing detail
drilling in the Big Bend Zone continues to demonstrate strong continuity of the
high grade zone.

North Zone

A total of 38 holes totalling 13,800 metres have been completed in the North
Zone. Exploration drilling in the North Zone has extended high grade
mineralization a further 250 metres to the North at depth. (holes 333 and 361
see table) Infill  drill hole 267 discovered a new wide high grade vein with an
approximate true width of 20 metres vein averaging 31.3 g/t gold and 330.3 g/t
silver. In addition, a number of holes (holes 268, 281, and 286 listed below)
intersected multiple veins including the new wide vein.

Selected drill results are as follows:

North and N.Ext      FROM         TO        LENGTH      GOLD     SILVER
   ----------      --------    --------    --------   --------  --------
    Hole #         (metres)    (metres)    (metres)    (g/t)     (g/t)
   ----------      --------    --------    --------   --------  --------
   KP04-267         139.00      169.50       30.50      31.3     330.3
     Plus           206.60      211.30        4.70      14.7      88.7
   KP04-268         135.60      148.50       12.90       8.5      57.8
     Plus           167.00      173.40        6.40       6.4     131.4
     Plus           185.25      188.10        2.85      28.1     856.2
   KP04-280         115.20      130.40       15.20      30.3     281.5
     Plus           231.00      234.00        3.00      10.3      84.7
   KP04-281         166.20      169.10        2.90      28.8     454.4
     Plus           188.30      202.00       13.70      31.9     322.0
     Plus           233.00      243.50       10.50       6.6      41.3
   KP04-286         220.30      221.00        0.70      24.8     116.1
     Plus           242.40      243.40        1.00      15.8     128.8
     Plus           248.50      250.00        1.50       7.7      62.6
     Plus           251.40      264.50       13.10      31.3     332.8
     Plus           270.70      291.30       20.60      31.7     484.3
     Plus           308.80      316.30        7.50       7.0     35.31
   KP04-291         232.00      234.70        2.70      20.2     560.4
   KP04-322         150.35      180.60       30.25      12.2     119.4
   KP04-333         520.50      521.50        1.00      95.3      52.7
   KP04-335         229.70      232.30        2.60      61.0     296.3
     Plus           235.00      237.00        2.00      13.1     171.4
   KP04-361         403.30      406.60        2.70      23.1      96.6
     Plus           411.50      420.80        9.30      14.5     242.1

Central Zone

A total of 47 drill holes totalling 7,220 metres have been completed in the
Central Zone. The drilling has discovered a new high grade ore shoot that is 150
to 200 metres long and extends to at least 175 metres below surface and remains
open at depth. Holes from this ore shoot include holes 299 (71.6 g/t gold and
2,674 g/t silver over 8.5 metres), 296 (63.8 g/t gold and 426.9 g/t silver over
5 metres), 290 (22.2 g/t gold, 89.4 g/t silver over 3.6 metres), 298 (17.29 g/t
gold, 143 g /t silver over 16.8 metres) and hole 303 (22 g/t gold and 400.5 g/t
silver over 9.9 metres). Hole 300 (17.25 g/t gold and 539 g/t silver over 5.6
metres) was drilled in the previously discovered southern ore shoot in the
Central Zone outlined in the last release (August 12 2004). This shoot also
remains open at depth.

Selected drill results are as follows:

Central Zone        FROM         TO        LENGTH      GOLD     SILVER
  ----------      -------      ------     -------    --------  --------
   Hole #        (metres)    (metres)    (metres)    (g/t)      (g/t)
  ----------      -------      ------     -------    --------  --------
  KP04-287          47.20       48.00        0.80      39.7      990.4
    Plus            63.25       68.00        4.75      19.0      205.6
  KP04-290         127.00      130.60        3.60      22.2       89.4
  KP04-296          17.20       22.20        5.00      63.8      426.9
  KP04-297         172.85      188.60       15.75      15.9      251.1
  KP04-298          79.00       95.80       16.80      17.2      143.1
  KP04-299         154.50      163.00        8.50      71.6    2,674.5
  KP04-300         204.80      210.40        5.60      17.2      539.3
  KP04-303         132.50      142.40        9.90      22.0      400.5
  KP04-318          19.70       36.00       16.30      13.2      151.5
  KP04-323          68.00       73.20        5.20      11.2      242.4
  KP04-354         141.90      145.60        3.70      11.4      340.5
  KP04-364         106.10      113.20        7.10      16.4       62.0
    Plus            133.6       137.7        4.10      26.0      836.0


South Zone

A total of 39 holes totaling 5500 metres have been drilled in the South Zone to
date in 2004. Hole 338 is the most significant of these holes as it contains
11.0 g/t gold and 182 g/t silver over 16.1 metres from 45.4 to 61.5 metres. This
intersection is approximately 100 metres east of the expected location of the
South Zone and may represent the continuation of the main vein from Big Bend
offset by faulting to the east. If this is the case, then the South Zone and
South Zone Extension drilling has not been on the main vein but on a southern
continuation of another vein located west of the main structures. Drilling is
ongoing.

Selected Results are as follows:


South Zone         FROM          TO         LENGTH      GOLD     SILVER
  Hole #        (metres)     (metres)     (metres)     (g/t)     (g/t)
 KP04-283          25.80        29.00         3.20     18.9       86.4
 KP04-288         169.70       170.35         0.65     20.5      222.8
   Plus           177.50       180.50         3.00     13.3      368.4
   Plus           194.00       197.60         3.60     17.2      198.9
 KP04-294          52.70        55.20         2.50     23.2      156.3
 KP04-334          51.30        52.60         1.30     22.4      140.2
 KP04-338          45.40        61.50        16.10    11.01      181.7
   Plus           183.40       188.70         5.30     18.4      167.1

Big Bend Zone

A total of 99 holes (including infill, geotech, metallurgical, and detailed
drilling) totaling 13,800 metres have been completed in the Big Bend Zone.
Significant infill results are in the table below and continue to confirm the
high grades contained in the Big Bend Zone.

Detailed drilling is underway on a high grade portion of the Big Bend Zone on
5x10 metre centres along 100 metres of strike length and to 25 metres depth, to
calculate dilution and to determine short range high grade continuity. Results
to date (see attached table) outline the strong grade continuity in the high
grade portion of Big Bend.

In addition, as mentioned in the last release (August 12 2004), as part of the
dilution and grade continuity exercise 700 metres of the Big Bend and South Zone
have been exposed along strike on surface through trenching. Samples have been
taken across the vein every 5 metres. Results again indicate strong grade
continuity.

Big Bend infill drilling results are as follows:

Big Bend        FROM          TO         LENGTH       GOLD      SILVER
 --------     --------     --------     --------    --------   --------
 Hole #       (metres)     (metres)     (metres)     (g/t)      (g/t)
 --------     --------     --------     --------    --------   --------
KP04-264        194.50       201.00         6.50      25.9       300.7
KP04-266         85.95        97.70        11.75      31.5       324.3
  Plus          102.20       109.25         7.05      37.1       105.8
KP04-269         59.35        67.40         8.05      45.7       387.5
KP04-282         90.70        99.90         9.20      72.8       832.0
KP04-285        157.20       162.60         5.40     112.4     1,493.3
KP04-289        295.25       307.00        11.75      30.1       705.9
KP04-317        154.50       159.70         5.20      14.3       101.7
KP04-339        203.25       214.15        10.90      16.3       381.3
KP04-351        144.25       150.20         5.95     114.3      1103.8
KP04-357        243.00       250.45         7.45      31.7       531.8

Big Bend detailed drilling results are as follows:

KP04-272      3.80       12.80        9.00       143.1        1,288.1
KP04-273     13.50       21.05        7.55       184.1        1,231.1
KP04-274      6.70       15.50        8.80        70.5          736.1
KP04-275     10.10       21.20       11.10       120.9          702.6
KP04-276      5.10       15.90       10.80        40.0          402.7
KP04-277      9.80       27.95       18.15        56.0          392.4
KP04-278      0.00       13.78       13.78        36.5          362.6
KP04-304     21.00       27.10        6.10        59.1          655.8
KP04-305     22.50       31.40        8.90        55.4          537.5
  Plus       37.00       37.70        0.70        27.1          321.5
KP04-306     16.15       22.00        5.85        94.0          996.7
  Plus       23.85       26.40        2.55        27.5          208.3
KP04-307     18.40       36.75       18.35        51.9          552.0
KP04-308     15.50       31.50       16.00        41.8          443.3
KP04-310     10.20       20.30       10.10        85.8          708.2
KP04-311     16.00       30.10       14.10        73.2          697.5
KP04-312     18.70       44.90       26.20        28.7          265.4
KP04-325      6.45       10.85        4.40        39.7          255.9
KP04-326A    11.60       13.00        1.40        76.7         1266.5
  Plus       17.00       32.25       15.25        55.7          492.5
KP04-327      4.50       13.55        9.05        68.1          332.5
KP04-328      5.45       16.60       11.15        53.2          348.0
KP04-329     21.70       35.00       13.30        47.5          432.0
KP04-330     30.80       43.90       13.10        31.4          296.4
KP04-331     18.20       24.70        6.50        51.7          348.2
KP04-332     22.90       32.50        9.60        71.1         1048.4
KP04-341      8.00       20.50       12.50        38.1          299.9
KP04-342      5.30       16.30       11.00        63.5          389.3
KP04-343     17.50       25.75        8.25        87.7          323.4
KP04-344     24.20       33.40        9.20        67.6          360.1
KP04-345     14.10       21.00        6.90        72.3          571.1
KP04-346     12.00       28.40       16.40        99.8          978.5
KP04-347     15.50       32.50       17.00        47.2          403.8

Additional Big Bend trenching detailed results are as follows:

                 FROM          TO         LENGTH       GOLD    SILVER
  ----------   --------     --------     --------    --------  -------
  Hole #       (metres)     (metres)     (metres)     (g/t)     (g/t)
 ----------    --------     --------     --------    --------  -------
TP90850.1          0.00         2.08         2.08      10.7      96.7
TP90850.2          0.52         0.91         0.39       6.9     73.80
 TP90860           0.00         3.25         3.25     20.01     133.3
 TP90870           0.75         3.41         2.66       7.9      47.5
TP90880.1          1.25         2.57         1.32      17.6      77.2
 TP90890           1.42         6.61         5.19      49.0     212.7
 TP90900           1.43         4.93         3.50      88.9     706.6
 TP90910           1.46         4.10         2.64      40.0     535.9
TP90920.1          2.01         4.46         2.45     36.40     284.6
TP90930.1          1.76         6.72         4.96      65.8     558.8
TP90940.1          2.41         7.01         4.60      52.5     486.3
TP91010.2          1.87         7.42         5.55     52.50     454.9
 TP91020           0.97         7.37         6.40      64.3     614.0
 TP91035           1.02         8.36         7.34     28.40     348.8
 TP91040           1.11         8.73         7.62      83.2     403.7
 TP91045           0.00         9.63         9.63      68.3     767.3
 TP91050           0.50        10.43         9.93      49.8     498.4

Drilling is ongoing at Kupol. The current plan is to complete infill drilling in
early October and apply all seven drill rigs to exploration for the month of
October, focusing on the newly discovered vein to the South, the North North
Extension Zone and parallel veins. Three drill rigs will continue exploration 
drilling through the end of November.

The following table shows the location of the drill holes drilled to date.

 HOLE-ID      LOCATION     LOCATION    LOCATION   LENGTH     SECTION    AZIMUTH     DIP
                 X            Y          Z
KP04-264     77,100.56    90,700.21    566.04       270.0      90700      271.4    -55.4
KP04-265     77,083.82    90,875.11    594.03        96.5      90875      268.4    -55.0
KP04-266     77,114.44    91,012.64    618.23       133.5      91025      273.8    -57.0
KP04-267     77,132.11    92,350.10    604.27       248.0      92350      271.6    -55.1
KP04-268     77,077.34    92,250.05    616.54       236.0      92250      266.4    -53.6
KP04-269     77,099.42    91,050.08    627.44        94.8      91050      273.4    -54.4
KP04-270     76,910.01    90,499.67    556.76        76.0      90500      272.3    -54.9
KP04-271     77,158.05    90,950.33    607.97       158.4      90950      274.7    -64.1
KP04-271A    77,158.05    90,952.15    607.81         6.0      90950      273.0    -64.9
KP04-272     77,053.76    90,949.83    609.25        22.0      90950      269.3    -44.5
KP04-273     77,054.82    90,949.83    609.28        27.0      90950      270.1    -61.6
KP04-274     77,056.42    90,960.14    610.59        21.0      90950      272.6    -43.4
KP04-275     77,057.27    90,960.12    610.69        28.5      90960      273.3    -58.6
KP04-276     77,058.67    90,969.97    612.03        24.0      90970      270.9    -43.1
KP04-277     77,059.32    90,970.03    611.56        33.5      90970      276.9    -68.8
KP04-278     77,058.68    90,980.07    613.05       130.0      90980      270.1    -42.7
KP04-279     77,160.53    91,413.02    657.19       155.0      91413      269.7    -54.4
KP04-280     77,077.66    92,250.06    616.68       266.0      92250      266.8    -63.2
KP04-281     77,131.91    92,350.10    604.05       285.5      92350      271.6    -60.4
KP04-282     77,096.05    90,924.63    604.52       120.0      90925      270.9    -53.8
KP04-283     76,989.65    90,549.03    555.38       162.0      90550      271.3    -54.9
KP04-284     77,144.83    92,250.15    615.95       397.0      92250      269.8    -64.3
KP04-285     77,096.42    90,924.59    604.40       185.0      90925      270.5    -73.8
KP04-286     77,132.20    92,350.07    604.12       335.0      92350      272.6    -69.6
KP04-287     77,077.17    91,874.84    654.49        88.6      91875      269.5    -53.6
KP04-288     77,063.43    90,597.78    554.96       282.0      90600      269.5    -53.5
KP04-289     76,910.70    91,149.86    652.43       327.0      91150       91.4    -45.7
KP04-290     77,134.17    91,874.78    653.13       165.5      91875      271.9    -55.1
KP04-291     76,837.49    92,174.85    665.54       332.0      92175       91.1    -50.1
KP04-292     76,859.11    91,924.96    679.56       329.0      91925       91.0    -45.0
KP04-293     76,845.73    90,579.83    572.02       193.0      90580       87.8    -46.3
KP04-294     77,002.24    90,575.14    557.05       165.0      90575      273.0    -55.9
KP04-295     76,868.00    91,150.00    650.00        31.0      91150       90.0    -47.0
KP04-295A    76,869.02    91,151.20    651.89       451.8      91150       87.3    -46.5
KP04-296     77,052.08    91,924.67    653.25        68.4      91925      266.5    -55.4
KP04-297     76,969.66    91,306.84    661.11       198.5      91307       89.9    -48.8
KP04-298     77,096.57    91,924.63    648.46       123.6      91925      275.3    -54.8
KP04-299     77,158.29    91,850.07    653.58       224.0      91850      268.7    -59.3
KP04-300     76,978.04    91,524.98    668.25       269.0      91525       91.1    -51.9
KP04-301     76,848.75    90,499.82    555.65       240.0      90500       88.5    -46.8
KP04-302     77,169.38    91,462.42    655.79       158.0      91475      270.7    -54.6
KP04-303     77,134.14    91,924.33    643.83       175.1      91925      273.5    -54.3
KP04-304     77,060.26    90,950.02    608.35        35.5      90950      281.6    -54.0
KP04-305     77,060.26    90,950.02    608.35        41.0      90950      281.6    -60.7
KP04-306     77,060.26    90,959.97    609.07        32.0      90960      270.2    -53.9
KP04-307     77,060.60    90,959.91    609.18        41.0      90960      269.9    -63.3
KP04-308     77,064.91    90,970.13    609.96        37.5      90970      276.1    -56.4
KP04-309     77,065.29    90,970.12    609.93        59.5      90970      275.9    -65.0
KP04-310     77,064.74    90,979.92    611.28        50.0      90980      270.2    -45.2
KP04-311     77,065.53    90,979.92    611.21        38.0      90980      270.3    -60.9
KP04-312     77,065.62    90,979.92    611.11        48.0      90980      271.5    -70.6
KP04-313     77,223.39    91,324.68    655.25        41.0      91325      269.9    -51.1
KP04-313A    77,224.08    91,324.70    655.17       275.0      91325      270.3    -61.5
KP04-314     76,979.84    90,600.17    563.26       120.8      90600      275.3    -53.0
KP04-315     77,091.46    90,975.05    609.98       100.0      90975      272.0    -53.7
KP04-316     77,122.97    92,450.57    590.70       170.0      92450      273.9    -51.3
KP04-317     76,927.40    90,619.50    578.13       185.0      N/A         37.0    -42.6
KP04-318     77,051.86    91,973.48    646.77        72.5      91975      273.4    -54.3
KP04-319     77,073.94    92,200.20    621.67       220.0      92200      270.3    -62.8
KP04-320     76,899.80    90,834.86    627.72       160.0      90835       89.6    -49.8
KP04-321     76,947.52    90,599.98    572.18        80.0      90600      278.3    -54.0
KP04-322     77,123.74    92,450.70    590.76       230.0      92450      271.0    -64.3
KP04-323     77,082.40    91,999.51    642.56       120.0      92000      268.0    -55.2
KP04-324     76,947.11    90,836.08    623.17       100.0      90835      267.0    -60.9
KP04-325     77,065.41    91,009.97    618.14        14.4      91010      271.0    -44.7
KP04-326     77,065.89    91,009.94    618.22        40.0      91010      270.8    -59.0
KP04-326A    77,065.96    91,009.97    618.21        42.0      91010      272.3    -62.4
KP04-327     77,061.07    91,019.76    620.09        18.0      91020      271.5    -44.7
KP04-328     77,061.61    91,019.78    619.99        31.5      91020      271.5    -59.9
KP04-329     77,070.83    91,009.93    618.03        42.0      91010      271.9    -57.0
KP04-330     77,071.37    91,009.90    618.04        48.0      91010      270.5    -67.0
KP04-331     77,070.96    91,019.85    619.51        31.5      91020      272.2    -43.4
KP04-332     77,070.46    91,019.85    619.62        37.5      91020      272.2    -56.0
KP04-333     77,354.47    92,850.06    538.52       620.0      92850      267.2    -60.0
KP04-334     76,979.11    90,400.20    534.94       150.0      90400      269.0    -54.1
KP04-335     77,092.42    92,200.22    621.98       362.0      92200      268.0    -64.2
KP04-336     76,997.46    90,625.44    563.08       125.0      90625      276.8    -55.3
KP04-337     77,028.27    92,074.75    640.17        53.5      92075      266.4    -56.0
KP04-338     77,011.62    90,449.83    538.84       264.7      90450      269.5    -54.3
KP04-339     77,166.43    90,862.47    591.91       235.0      90863      271.6    -58.7
KP04-340     77,120.25    92,200.18    621.74       408.5      92200      262.3    -64.9
KP04-341     77,062.95    91,050.21    628.28        36.0      91050      272.5    -61.1
KP04-342     77,071.62    91,049.91    628.20        25.0      91050      273.9    -43.2
KP04-343     77,062.02    91,050.15    628.31        28.3      91050      272.5    -43.5
KP04-344     77,072.53    91,049.83    628.39        40.5      91050      273.9    -61.2
KP04-345     77,065.32    91,009.89    618.52        31.5      91010      274.8    -43.0
KP04-346     77,064.95    90,979.89    610.53        42.0      90980      274.3    -58.0
KP04-347     77,065.34    90,979.79    610.41        47.5      90980      274.2    -71.2
KP04-348     77,084.00    92,300.00    609.00        In        92300      270.0    -52.0
                                                 progress
KP04-349     77,074.97    92,074.64    634.60       140.0      92075      269.1    -53.7
KP04-350     76,827.98    90,275.75    547.48        81.0      90275      271.0    -55.7
KP04-351     77,148.08    90,862.42    591.33       199.0      90863      267.7    -48.2
KP04-352     77,069.82    90,457.09    537.44       400.0      90450      267.0    -60.1
KP04-353     76,989.80    90,639.48    564.52        26.9      90640      276.9    -54.7
KP04-354     77,116.67    92,049.82    635.51       192.0      92050      265.0    -54.7
KP04-355     77,107.85    90,899.73    598.01       139.5      90900      270.7    -54.9
KP04-356     76,992.51    90,639.27    564.40        42.0      90640      278.5    -67.0
KP04-357     77,228.56    91,050.00    634.07       267.0      91050      272.5    -50.4
KP04-358     77,120.52    92,201.83    622.21       389.0      92200      261.5    -67.0
KP04-359     76,995.61    90,638.95    564.43        73.5      90640      278.1    -54.9
KP04-360     76,998.58    90,638.66    564.44        60.0      90640      273.3    -55.3
KP04-361     77,334.78    92,950.32    511.21       494.0      92950      271.5    -55.3
KP04-362     76,988.43    90,639.09    564.56        34.0      90640      274.2    -47.9
KP04-363     77,262.65    91,400.11    650.42       320.0      91400      265.8    -58.9
KP04-364     77,099.31    92,087.85    632.12       190.0      92088      272.4    -54.7
KP04-365     76,991.54    90,649.50    565.29        60.8      90650      274.5    -54.3


All results released in this news release have been validated by BSDlO. Quality
Control Program ("QC") which has been designed in concert with an independent
consultant to meet or exceed the requirements of N1 43-101. This QC program
includes the use of certified standard reference samples, coarse field blank
material and duplicate sampling. Tom Garagan, Vice President of Exploration for
Bema Gold Corporation, is the Qualified Person for this exploration project.

The Kupol project is a joint venture between Bema and the Government of
Chukotka. Bema has the option to earn a 75% interest in the property from the
Government.

"Clive T. Johnson"
Chairman, C.E.O., & President

On Behalf of BEMA GOLD CORPORATION

For further information please contact Bema Gold:

Ian MacLean                                 Derek Iwanaka
Manager, Investor Relations                 Investor Relations
604-681-8371, investor@bemagold.com         604-681-8371, investor@bemagold.com

Bema Gold Corporation trades on the Toronto Stock Exchange and the American
Stock Exchange. Symbol: BGO. Bema shares also trade on the London Stock
Exchange's Alternative Investment Market(AIM). Symbol: BAU.

Some of the statements contained in this release are "forward-looking
statements" within the meaning of Section 21E of the Securities Exchange Act of
1934. Such forward-looking statements involve known and unknown risks,
uncertainties and other factors that may cause our actual results, performance
or achievements to differ materially from the anticipated results, performance
or achievements expressed or implied by such forward-looking statements.
Forward-looking statements in this release include statements regarding: the
Company's projections regarding annual gold production in future periods.
Factors that could cause actual results to differ materially from anticipated
results include risks and uncertainties such as: risks relating to estimates of
reserves, mineral deposits and production costs; mining and development risks;
the risk of commodity price fluctuations; political and regulatory risks; and
other risks and uncertainties detailed in the Company's Form 40-F Annual Report
for the year ended December 31, 2003, which has been filed with the Securities
and Exchange Commission, and the Company's Renewal Annual Information Form for
the year ended December 31, 2003, which is an exhibit to the Company's Form 40-F
and is available under the Company's name at www.sedar.com. The Company
disclaims any intention or obligation to update or revise any forward-looking
statements, whether as a result of new information, future events or otherwise.



                      This information is provided by RNS
            The company news service from the London Stock Exchange

END
DRLEALNDADELEEE

Bema Npv (LSE:BAU)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Bema Npv Charts.
Bema Npv (LSE:BAU)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Bema Npv Charts.