Tajiri Resources Corp. (the "Company") (TSX VENTURE:TAJ) reports that as of
earlier today drilling at the Company's Kaburi PL Gold Project, Guyana, South
America has commenced on targets defined during Phase I & II work completed by
the Company in 2012. 


The drilling marks the first ever modern exploration efforts of its kind on the
Property and will consist of a minimum 3,000 metres over approximately 25 - 30
shallow Reverse Circulation ("RC") drill holes in order to test targets
associated with the Seer gold-in-soil anomaly, defined by over 1200 'Trado'
(power auger) based soil samples taken at depths of up to 7 metres, with
particular focus on those targets which correlate with the Phase II lithological
sample results as highlighted below. These 187 panel samples were predominantly
collected from mined out artisanal pits, within the Seer anomaly, where bedrock
and lateritic exposures were exposed below the highly weathered saprolite.


Table of rock Samples Assaying greater than 0.5 g/t Gold taken from lithological
exposures at the Kaburi PL in November, 2012




----------------------------------------------------------------------------
Sample Type            Sample ID       Location   Easting  Northing   Au g/t
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM68  Goldstar East    275864    625840    15.30
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM60    Alywn's Pit    275309    625204     9.94
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM67    Alywn's Pit    275309    625208     9.67
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM59    Alywn's Pit    275309    625204     5.69
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM43    Alywn's Pit    275318    625202     3.91
----------------------------------------------------------------------------
Panel Sample 1 by 1m       GM147    Goldstar NE    276260    626392     3.19
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM51    Alywn's Pit    275318    625208     2.99
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM08    Alywn's Pit    275319    625183     2.88
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM07    Alywn's Pit    275325    625183     2.65
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM36    Alywn's Pit    275318    625198     2.10
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM06    Alywn's Pit    275325    625183     1.35
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM44    Alywn's Pit    275318    625202     1.33
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM41    Alywn's Pit    275318    625200     1.27
----------------------------------------------------------------------------
Panel Sample 1 by 1m       GM157      SouthEast    275690    624637     1.17
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM31    Alywn's Pit    275322    625179     1.15
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM29    Alywn's Pit    275331    625181     0.87
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM37    Alywn's Pit    275318    625198     0.83
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM24    Alywn's Pit    275331    625192     0.80
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM46    Alywn's Pit    275318    625204     0.78
----------------------------------------------------------------------------
Panel Sample 1 by 1m       GM111           Camp    274074    625635     0.69
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM33    Alywn's Pit    275318    625196     0.60
----------------------------------------------------------------------------
Panel Sample 1 by 1m        GM12    Alywn's Pit    275318    625188     0.58
----------------------------------------------------------------------------
Panel Sample 1 by 1m       GM138    Goldstar NE    276273    626383     0.56
----------------------------------------------------------------------------



The current RC Drilling program will continue for the next several weeks with
samples being shipped periodically to the Acme Analytical Laboratories
Preparation facility in Georgetown, Guyana with initial results expected by mid
to late May, 2013. 


On Behalf of the Board,

Tajiri Resources Corp.

Graham Keevil, President, CEO

This news release may contain forward-looking statements based on assumptions
and judgments of management regarding future events or results. Such statements
are subject to a variety of risks and uncertainties which could cause actual
events or results to differ materially from those reflected in the
forward-looking statements. The Company disclaims any intention or obligation to
revise or update such statements. 




Follow Tajiri Resources On:                                                 
Facebook: http://www.facebook.com/TajiriResources                           
Twitter: http://twitter.com/tajiriresources                                 
YouTube: http://www.youtube.com/user/tajiriresources                        
Flickr: http://www.flickr.com/photos/tajiriresources/                       



To hear a pre-recorded audio interview with the CEO regarding this release and
general corporate updates follow this link: http://youtu.be/4Bo1gpJArPo. 


FOR FURTHER INFORMATION PLEASE CONTACT: 
Tajiri Resources Corp.
Graham Keevil
President, CEO
604-642-0115 or Toll Free 866-345-0115
604-642-0116 (FAX)
info@tajiricorp.com

Tajiri Resources (TSXV:TAJ)
Historical Stock Chart
From Aug 2024 to Sep 2024 Click Here for more Tajiri Resources Charts.
Tajiri Resources (TSXV:TAJ)
Historical Stock Chart
From Sep 2023 to Sep 2024 Click Here for more Tajiri Resources Charts.