ITEM 1. DESCRIPTION OF THE BUSINESS
Business
New Jersey Mining Company (“the Company” or “NJMC”) is a gold producer with an established base in three historic mining districts in the Western United States. The Company’s primary source of revenue comes from its operating gold mine, the Golden Chest Mine located in the Murray Gold Belt of northern Idaho.
New Jersey Mining Company (“the Company” or “NJMC”) was incorporated under the laws of the State of Idaho on July 18, 1996. The Company’s head office and registered records office is located at 201 N. 3rd St. Coeur d’Alene, ID 83814.
Any Bankruptcy, Receivership or Similar Proceedings
There have been no bankruptcy, receivership, or similar proceedings.
Any Material Reclassification, Merger, Consolidation, or Purchase or Sale of a Significant Amount of Assets Not in the Ordinary Course of Business.
There have been no material reclassifications, mergers, consolidations, purchases, or sales not in the ordinary course of business for the past three years.
BUSINESS OF THE COMPANY
General Description of the Business
New Jersey Mining Company (NJMC) was incorporated in the State of Idaho on July 18, 1996. The Company is an established gold producer, with surface and underground mining operations at its 100-percent owned Golden Chest Mine and milling operations at its majority-owned New Jersey Mill and an expanded focus on identifying and exploring Critical Minerals (Rare Earth Minerals). Its business strategy is to grow its asset base and mineral production over time, relying primarily on its in-house skill sets to eventually become a mid-tier gold producer. The Company holds mineral properties in three historic mining districts of Idaho and Montana. Its portfolio of mineral properties includes:
·The Golden Chest Mine, a producing gold mine located in the Murray Gold Belt (MGB) of North Idaho;
·Advanced stage, pre-development surface and underground property, adjacent to the Golden Chest Mine;
·A significant portfolio of early-stage exploration properties within the MGB, many of which include historic gold mines and known gold mineralization;
·USGS recognized Rare Earth Element Resource
oDiamond Creek - third largest REE resource in the US
oRoberts Rare Earth – one the highest grade REE properties in the US
·A significant portfolio of early-stage exploration properties in Central Idaho, primarily in the Elk City area, and;
·The Butte Highlands Mine (50-percent interest), an advanced-stage project which has seen considerable development work, located south of the city of Butte, in Western Montana;
In addition to its portfolio of exploration, pre-development, and producing properties, the Company is also the manager and majority-owner of the New Jersey Mill, which currently processes ore from the Golden Chest Mine. The New Jersey Mill can process gold and silver ore through a 360-tonne per day flotation plant.
During the last two years, the Company has focused its efforts on expanding underground development and production at the Golden Chest Mine with an aggressive focus on consolidating and increasing its land holding within the Murray Gold Belt. With all debt associated with the start-up of operations paid in full, the Company significantly increased its exploration and expansion activities in the Murray Gold Belt. This progress combined with the existing infrastructure and development over the last two years has created a solid foundation for continued growth and a base of value regardless of market cycles.
Competitive Business Conditions
While there has been a market for gold and precious metals historically, the Company competes on several different fronts within the minerals exploration industry. The Company competes with other junior mining companies for the capital necessary to sustain its exploration and development programs. NJMC also competes with other mining companies for exploration properties and mining assets, mostly properties in the western United States. In recent years, the Company has been successful in resuming operations at the New Jersey Mill, consolidating 100% ownership of the Golden Chest Mine and acquiring a 50% interest in the Butte Highlands Joint Venture. In October 2016 production at the Golden Chest resumed with the Company as the sole owner and operator. While not its core business, the New Jersey Mill has little competition for contract milling within an approximate 175-mile radius; however, it is conceivable that fuel prices and other factors could expand the market to include mines outside of the area.
6
Table of contents
Generally, the Company is subject to the risks inherent to the mineral industry. A primary risk of mineral exploration is the low probability of finding a major ore deposit. The Company attempts to mitigate this risk by focusing its efforts in areas known to host significant mineral deposits, and also by relying on its experienced management team to drive analysis, evaluation, and acquisition of properties that it feels have a higher-than-average probability of success. In addition to deal essentials, such as cost, terms, timing, and market considerations, the Company’s process of property acquisition involves screening target properties based on geological, economic, engineering, environmental, and metallurgical factors. In all of its operations the Company competes for skilled labor within the mining industry.
The risks associated with the Company’s mining and milling operations include other risks typical of the mining industry, such as: operational effectiveness in the processing plant that could result in lower recovery of the economic metals, mechanical failure of equipment that could increase costs or decrease efficacy, ability to hire and retain qualified operators, and risks that the mining operations are unable to economically extract material due to ground or slope failures that increase cost. The Company manages these risks with engineering and geologic analysis, detailed mine planning, a preventive maintenance program, and installing experienced and technically proficient management.
Another significant risk in the mining industry is the price of metals such as gold and silver. If the prices of these metals were to fall substantially it could lead to a loss of investor interest in the mineral exploration sector, which would make it more difficult to raise the capital necessary for the Company to move exploration and development plans forward.
Effect of Existing or Probable Governmental Regulations on the Business
The mining business is subject to extensive federal, state and local laws and regulations governing development, production, labor standards, occupational health, waste disposal, the use of toxic substances, environmental regulations, mine safety and other matters. The Company is subject to potential risks and liabilities occurring as a result of mineral exploration and production. Insurance against environmental risk (including potential liability for pollution or other hazards as a result of the disposal of waste products occurring from exploration and production) is not generally available to the Company (or to other companies in the minerals industry) at a reasonable price. To the extent that the Company becomes subject to environmental liabilities, the satisfaction of any such liabilities would reduce funds otherwise available to the Company and could have a material adverse effect on the Company. Laws and regulations intended to ensure the protection of the environment are constantly changing and are generally becoming more restrictive.
All operating and exploration plans have been made in consideration of existing governmental regulations. Regulations that most affect operations are related to surface water quality and access to public lands. An approved plan of operations (POO) and a financial bond are usually required before exploration or mining activities can be conducted on public land that is administered by the United States Bureau of Land Management (BLM) or United States Forest Service (USFS).
The New Jersey Mine, Golden Chest Mine, and other nearby properties are part of the expanded Bunker Hill Superfund Site. Current plans for expanded cleanup do not include any NJMC projects. There is no known evidence that previous operations at the New Jersey Mine (prior to 1910) caused any groundwater or surface water pollution or discharged any tailings into the South Fork of the Coeur d'Alene River; however, it is possible that such evidence could surface. Should such a liability emerge for the Company, its exposure would likely be to clean up or cover old mine tailings that may have washed downstream from upstream mining operations. There are no mineral processing tailings deposits at the Golden Chest Mine. However, at least two old adits have small water discharges. The Company could conceivably be required to conduct cleanup operations at its own expense, however, the Environmental Protection Agency’s (EPA) Record of Decision for the Bunker Hill Mining and Metallurgical Complex Operating Unit 3 does not include any cleanup activities at the Company’s projects. Recently, the EPA has proposed a new cleanup plan that greatly increases the number of historic mine sites to be reclaimed, however, the plan has not been approved. NJMC has not received any notifications that it could be liable for any environmental cleanup.
Costs and Effects of Compliance with Environmental Laws (Federal, State and Local)
No major Federal permits are required for the Golden Chest and New Jersey Mines because the operations are on private land and there are no process discharges to surface waters. However, any exploration program conducted by the Company on unpatented mining claims, usually administered by the BLM or USFS, requires a POO to be submitted. The Company’s exploration programs on public land can be delayed for significant periods of time (one to two years) because of the slow permitting process applied by the USFS. The Company believes that such permitting delays are caused by insufficient manpower, complicated regulations, competing priorities, and sympathy for environmental groups who oppose all mining projects.
The Company is also subject to the rules of the U.S. Department of Labor, Mine Safety and Health Administration (MSHA) for the New Jersey and Golden Chest operations. When an underground mine or mill is operating, MSHA performs a series of regular quarterly inspections to verify compliance with mine safety laws, and can assess financial penalties for violations of MSHA regulations. A typical mine citation order for a violation that is not significant or substantial is about $200.
The New Jersey Mine and Mill have two important State of Idaho permits. The first is an Idaho Cyanidation Permit and the second is a reclamation plan for surface mining operations. No permit is required for the current flotation process as
7
Table of contents
there is no discharge of water to surface waters and the tailings impoundment is less than 30 feet high from toe to crest in height. An Idaho cyanidation permit was granted October 10, 1995 [No. CN-000027]. Construction of the Concentrate Leach Plant (CLP) at the New Jersey Mill was completed in November of 2007. The Idaho Cyanidation permit requires quarterly surface water and groundwater monitoring during the operation of the CLP. NJMC estimates the cost of water-monitoring associated with the CLP to be approximately $6,000 per year.
The Idaho Department of Lands (IDL) approved a surface mining reclamation plan for the New Jersey Mine in 1993. The plan calls for grading of steep fill slopes and planting of vegetation on the area disturbed by the open pit mine. NJMC pays an annual reclamation fee of $133 to the Idaho Department of Lands for surface disturbance associated with the New Jersey Mine open pit. The Company has estimated its costs to reclaim the New Jersey Mine and Mill site to be $96,600. The Company submitted a reclamation plan to the IDL for its current open pit mining operation at the Golden Chest Mine. The plan was approved and the Company was required to post a reclamation bond of $103,320. This plan also calls for the grading of steep fill slopes and re-vegetation of disturbed land as well as erosion control measures utilizing best practices.
When the Company plans an exploration drilling program on public lands, it must submit a POO to either the BLM or USFS. Compilation of the plan can take several days of professional time and a reclamation bond is usually required to start drilling once the plan is approved. Bond costs vary directly with surface disturbance area, but a small, single set-up drilling program usually requires a bond amount of approximately $5,000. If a plan requires road building, the bond amount can increase significantly. Upon completion of site reclamation and approval by the managing agency, the bond is returned to the Company.
The Company complies with local building codes and ordinances as required by law.
Number of Total Employees and Number of Full Time Employees
The Company's total number of full time employees is 31.
REPORTS TO SECURITY HOLDERS
The Company is not required to deliver an annual report to shareholders, however, it plans to deliver an annual report to shareholders in 2021. The annual report will contain audited financial statements. The Company may also rely on the Internet to deliver annual reports to shareholders.
The SEC maintains an Internet site (http://www.sec.gov) that contains reports, proxy and information statements, and other information regarding issuers that file electronically with the Commission and SEC.
The Company maintains a website where recent press releases and other information can be found. A link to the Company’s filings with the SEC is provided on the Company’s website www.newjerseymining.com.
8
Table of contents
ITEM 2. DESCRIPTION OF PROPERTIES
Figure 1 - Project Location Map
9
Table of contents
GOLDEN CHEST MINE
Figure 1 - Photo of Golden Chest Mine in February 2020
Property Location
The Golden Chest Mine is comprised of an underground mine, an open pit mine, and an exploration project located about 1.5 miles east of Murray, Idaho, comprised of 25 patented mining claims (280 acres) and 90 unpatented claims (1,390 acres). The site is along Forest Highway 9 and is accessible by several improved dirt roads from the paved highway. A three-phase power line was installed at the property in 2014 with power supplied by Avista Utilities.
Property Ownership
NJMC owns 100% of the Golden Chest LLC (owner of the Golden Chest Mine). The Company consolidated its ownership in December 2015, purchasing Marathon Gold Corporation’s (“Marathon”) 52.22% stake in Golden Chest LLC for $180,000 along with a 2% NSR on production from the Golden Chest property, as well as an adjacent Area of Interest. Golden Chest LLC purchased the mine from Metaline Contact Mines and J.W. Beasley Interests for $3.75 million.
Property History
The Golden Chest Mine was developed in the late 1800’s through the early 1900’s as part of the first gold production from the Coeur d’Alene Mining District. Historical accounts vary, but the district is believed to have produced approximately 300,000 ounces of gold from placer sources. It is estimated that the historic hard rock mining operations on the Golden Chest property produced approximately 65,000 ounces of gold, primarily from shallow, underground, high-grade veins. The Golden Chest Mine is considered to be the largest historic lode producer of gold in northern Idaho.
Modern exploration of the Golden Chest area began in the late 1970’s with several companies, including Cominco-American and Golden Chest Inc. (“GCI”), targeting gold and massive sulfides. Drill tests by GCI included a 200-foot hole from surface that intersected a 60-foot zone containing multiple low-grade gold-bearing quartz veins.
Newmont Exploration Ltd. followed GCI’s discovery by evaluating the veins for bulk mineable potential in the late-1980s. A geochemical survey yielded soil samples from the mine area that were anomalous in both gold and arsenic, indicating a well-developed vein system. Newmont then drilled 35 shallow reverse-circulation and five core holes, establishing an historic resource, most of which is related to the Idaho Vein system on the southern end of the property.
Present Condition, Work Completed, and Exploration Plans
Exploration & Development by NJMC & Golden Chest LLC
NJMC first leased the property in 2003, then explored, drilled, and developed it over subsequent years, producing 8,400 tonnes of ore averaging 6.9 gpt gold, all of which was processed at its New Jersey Mill for total production of nearly 2,000 ounces of gold. From 2004 through 2008, the Company completed an exploration core drilling program at the Golden Chest totaling 3,415 meters of core during that period, successfully extending the Idaho Vein below the No. 3 Level.
10
Table of contents
NJMC connected the historic No. 3 Level to the surface by driving a 440-meter ramp (the “North Ramp”), which was completed in 2008.
In 2010, NJMC terminated its operating leases to form Golden Chest LLC with Marathon. NJMC contributed certain mining claims, all geological data, and mining equipment to the venture, while Marathon contributed $4-million cash. As Marathon is a Canadian issuer, the joint venture operated and issued technical disclosures in accordance with Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101).
In 2011, Golden Chest LLC completed the most aggressive exploration project in the history of the property, totaling 11,300 meters of surface drilling. Other work completed included the construction of a new core shed, construction of new roads, surface geological work, surface and underground surveying, underground exploration drifting, and mine rehabilitation. In 2012, Golden Chest LLC completed an additional 7,000 meters of drilling and exploration drifting on the Popcorn Vein. Based on the results of those work programs, Golden Chest LLC delineated an updated gold resource and filed a technical report in compliance with NI 43-101.
The Juniper Lease & Mine Modernization
In September 2013, the Skookum Shoot portion of the Golden Chest property was leased to Juniper Mining Company, which later reassigned the lease to Gold Hill, an affiliate company. Gold Hill began construction in Q3 2014, spending an estimated $7 to $9-million on mine development and infrastructure, building a modern gold mine that reached production in May 2015. Mining activities continued until September 2015 when Gold Hill ceased operations and terminated its lease, forfeiting the mine and infrastructure back to Golden Chest LLC.
During the lease, NJMC processed Golden Chest ore at its New Jersey Mill, earning cash from milling fees and its share of a 2% net smelter return (“NSR”) royalty on gold production. In total, Gold Hill mined 40,840 dry metric tonnes of ore at an average grade of 6.70 gpt gold, resulting in production of approximately 8,000 ounces of gold.
Current Underground Operations
During 2020, NJMC mined a total of 12,190 tonnes of ore at an average grade of 5.98 gpt gold. This production came from the 888, 842, and 836 stopes. Underhand drift and fill is the mining method and cemented rock fill (CRF) utilizing waste rock mixed with cement slurry is used for backfill. A total of 1,828 cubic meters of backfill were placed during the year and 75 meters of development were completed as well. The company added a second 2-cubic meter LHD and a second drill jumbo in the third quarter. A second mining crew was added in the third quarter to complement the added equipment and increase the mining rate in the stopes and begin the downward development of the Main Access Ramp (MAR) to lower ore reserves. A wireless communication system was also installed at the mine which will resulted in increased operational efficiency and safety.
Current Open-Pit Operations
In 2020, NJMC continued its open pit mining operation which commenced in August of 2016. Mining advanced from the 1059 bench to the 1032 bench. A total of 27,690 tonnes of ore at average grade of 1.73 gpt gold and 248,013 tonnes of waste were mined during the year resulting in stripping ratio of 9.1. Ore tonnes and grade in the Klondike Pit were lower than expected because of historic stopes in the Klondike where high grade material had been mined out by the old-timers. These stopes were unmapped so therefore unexpected.
Exploration Plans
Modern exploration, including nearly 30,000 meters of drilling, reveals six NW-trending ore shoots at Golden Chest that demonstrate strong periodicity, consistent width and spacing, along the Idaho Fault. Most historic production came from the northernmost of these shoots, the Katie-Dora and the Klondike. Excellent mineralization potential remains in unmined portions of the northern shoots as well as in the unmined Paymaster and Joe Dandy shoots to the south. The Company’s core drilling rig was restarted in the fourth quarter of 2020 with drilling on the north end of the property in the Katie-Dora area. This hole intercepted three narrow quartz veins with an average true thickness of 20 centimeters with gold grades ranging from 10 to 75 gpt gold.
Core drilling totaling 6,000 meters is planned for 2021 using both a contractor drill rig and the company’s drill rig. Drilling is planned to explore the mineralized envelope around the Idaho fault at depth below existing drill intercepts in the Joe Dandy, Paymaster, and Skookum areas.
Present Condition of Plant & Equipment
During the lease, Gold Hill made many improvements to the Golden Chest property including approximately 1,000 meters of underground development at a nominal cross section of 4 meters by 4 meters, installation of a 3-phase electrical service, and a new haul road to keep mine traffic separate from employee and visitor traffic. NJMC constructed a 2,100 square-foot steel-frame shop building in 2020 near the main portal. A 2,500 square-foot steel-clad pole building was constructed in 2011 and is used primarily for office space and core logging. A 600 square-foot steel-clad pole building, constructed by NJMC in 2005, is also present near the northern ramp portal.
11
Table of contents
Geology & Mineralization
Gold mineralization occurs in veins associated with multiple faulting and folding events in the Coeur d’Alene Mining District. The mineralization occurs as gold- quartz veins associated with an orogenic deposit type. The orogenic system at the Golden Chest appears to have an association with igneous rock activity. Hence, the vein deposits may be described as intrusion-related orogenic gold. The principal vein being exploited at the Golden Chest Mine is associated with the Idaho Fault, which juxtaposes the quartzites of the upper Prichard Formation against finer-grained argillites, also of the upper Prichard Formation.
Veins occur adjacent to the Idaho Fault both in its footwall, and in its hangingwall. The mineralization occurs in two types of quartz veins, banded and massive. These veins are generally conformable to bedding in the Proterozoic age Prichard Formation. The banded veins, which occur primarily in argillite, contain, pyrite, arsenopyrite, galena, sphalerite and visible gold. Thicker, massive veins occur in quartzite and contain pyrite, galena, chalcopyrite, sphalerite, scheelite and visible gold.
The Company completed a mine reserve estimate for the year ending December 31, 2020. A block model was completed using Vulcan software and an inverse-distance squared methodology for the underground mine. The underground reserves calculated are entirely in the Skookum shoot where sample density and mining experience gave enough confidence that grades could be reasonably predicted. The composite database consisted of 1,028 muck sample composites on 2.7 meter centers (each round is sampled by a miner), 691 jackleg longhole samples on 1.22 meter centers, and 6,670 core hole composites composited on 3 meter centers using a run length method. Economic parameters such as mining costs, milling costs, metallurgical recovery, mining dilution, and gold payment under smelter contracts were obtained from the Company’s recent operating history and applied to the reserve calculation exercise.
The reserve was calculated by mining engineer Andrew Brackebusch, EIT under the supervision of Grant Brackebusch, P.E. who is the qualified person.
Classification
|
Tonnes
|
Gold Grade (gpt)
|
Proven
|
42,500
|
5.17
|
NEW JERSEY MILL
Property Location
The New Jersey Mill is a fully-permitted, 360-tonne per day, flotation mill and concentrate leach plant (“CLP”) located two miles east of Kellogg, Idaho, in the Coeur d'Alene Mining District. The mill is located on the same property as the New Jersey Mine, adjacent to U.S. Interstate Highway 90 and easily accessed year-round by local roads. Three-phase electrical power is supplied to the New Jersey Mill by Avista Utilities.
Project Ownership
In 2011, NJMC signed a joint venture (“JV”) agreement with United Mine Services (“UMS”), a wholly-owned subsidiary of United Silver Corporation, to increase the capacity of the New Jersey Mill. UMS funded the mill expansion in return for a 35% interest in JV assets plus the right to process 7,000 tonnes of its ore per month. NJMC is the JV manager and retains a 65% interest in JV assets as well as the right to process its own ore at the rate of 3,000 tonnes per month and to allocate unused and excess capacity in its role as manager. The property covered by the JV agreement includes the crushing circuit, grinding circuit, gravity circuit, flotation circuit, CLP, buildings and surface rights only over the patented mill site claim. Unpatented mill site claims are also part of the JV.
Present Condition of Plant & Equipment
Mill Expansion and Crescent Ore Processing
The mill expansion was completed in 2012, rendering the mill capable of processing 360 tonnes of sulfide ore per day to produce a single flotation concentrate. The expansion cost approximately $3.2 million, all of which was funded by UMS under terms of the JV (Ex. 10.1). The expansion project included the installation of a new cone crusher, a new fine ore bin, new conveyors, a new 2.4-meter by 4.0-meter ball mill, additional flotation cells, a new paste thickener, associated pumps, and a new building. Subsequent to the mill expansion, the New Jersey Mill processed 8,470 dry tonnes of silver ore from the Crescent Mine before operations ended.
In April 2014, Hale Capital Partners, through its subsidiary Crescent Silver LLC (“Crescent”), acquired the assets of UMS, including its stake in the New Jersey Mill JV, in a consensual foreclosure process. Therefore, Crescent is now the NJMC’s joint venture partner at the New Jersey Mill.
Golden Chest Ore Processing
In September 2013, the Skookum Shoot portion of the Golden Chest Mine was leased to Juniper Resources LLC which, through its affiliate companies, developed a modern gold mine that reached full production in May 2015. NJMC processed Golden Chest ore at its New Jersey Mill, earning cash from milling fees and its share of a 2-percent net smelter return royalty on gold production.
12
Table of contents
From December 2014 through September 2015, 40,840 dry tonnes from the Golden Chest Mine were successfully processed at the New Jersey Mill producing approximately 8,000 ounces of gold.
Current Ore Processing Operations
NJMC now has 100-percent ownership of the Golden Chest Mine. In October 2016, the Company resumed operations at the New Jersey Mill, processing ore extracted from open and underground of the Golden Chest. In 2020, the New Jersey Mill processed 39,880 tonnes at an average head grade of 3.03 gpt gold with 88% gold recovery. Since restarting operations at the Golden Chest in October 2016, the Company has milled a total of 162,674 tonnes.
The mill recycles process water and utilizes a paste tailings disposal process patented by NJMC founder Fred Brackebusch to minimize impacts to the environment. By implementing paste tailings processing methods, NJMC is able to recycle process water and prevent the discharge of process water to surface waters. At full capacity, this method saves more than 50 million gallons of water per year. NJMC was recognized as a “Pollution Prevention Champion” by the Idaho Department of Environmental Quality in 2014 for its efforts to reduce pollution at the mill. The Company is planning to permit an expansion of its existing tailings storage facility, TSF #1.
As of December 31, 2020, the Company had a net capital cost of $4,040,327 associated with the New Jersey Mill.
BUTTE HIGHLANDS PROJECT
Property Location
In January 2016, NJMC purchased a 50% interest in Butte Highlands Joint Venture LLC (“BHJV”) from Timberline Resources Corporation (“Timberline”). BHJV owns the Butte Highlands Gold Project, located 15 miles south of Butte, Montana, within a gold-producing region that includes several large gold deposits. The property can be accessed via State Highway 2 and county and USFS roads. Electricity and water are available on the property.
Property Ownership
The Butte Highlands property covers approximately 135 acres and includes 11 patented claims. All of the private lands within the Butte Highlands property are patented lode and placer claims. BHJV is responsible for paying Montana state property taxes on all patented lands and for paying annual BLM maintenance fees on any unpatented mining claims.
Butte Highlands Joint Venture
In 2009, Timberline formed a 50/50 joint venture, the BHJV, with Highland Mining LLC (“Highland”) for the purpose of developing and mining the Butte Highlands property, with Highland to fund all mine development costs through to commercial production. In 2012, Montana State Gold Company LLC (“MSGC”) purchased Highland, assuming its project loan and its funding commitment.
NJMC purchased Timberline’s 50% “carried to production” interest in BHJV in 2016 for total consideration of $435,000 with Highland funding all development costs and NJMC’s 50% share of costs to be paid from proceeds of future mine production. Proceeds are to be split on an 80/20 basis (to Highland and NJMC, respectively) until payback is reached, after which proceeds will be split evenly.
Property History
The Butte Highlands gold mine was an historic lode mine that produced an estimated 60,000 ounces of gold from 1937 until the War Production Board forced its closure at the onset of WWII. The property was later explored by Battle Mountain, Placer Dome, ASARCO, and Orvana in the 1980’s and 1990’s which, in total, drilled more than 30,000 meters at Butte Highlands, prior to its acquisition by Timberline in 2007.
In 2009, Timberline formed a 50/50 joint venture with Highland to create BHJV for the purpose of developing and mining the property. In 2009 and 2010, Timberline conducted surface exploration, drilling, and permitting work as Highland began building surface and underground infrastructure.
In 2011, BHJV completed an underground exploration ramp and a 16,000-meter underground core drilling program to support mine modeling, focusing on the upper portion of the “Old Mill Block” which has dimensions of approximately 85 meters along strike, 335 meters down dip, and a mineralized thickness of 2.5 to 4.5 meters. The program returned many significant mineralized intercepts, including a highlight of 4.4 meters grading 232 gpt gold.
A NI 43-101 compliant technical report for Butte Highlands was completed in May 2013 by Mine Development Associates of Reno, Nevada.
The project has experienced significant timeline delays due, in part, to miscalculations of the permitting process and other technical issues. Permitting advanced more effectively from 2013 to 2015 with the following critical milestones successfully achieved:
•In July 2013, the Montana Department of Environmental Quality (“DEQ”) issued the final Montana Pollutant Discharge Elimination System (“MPDES”) water discharge permit;
13
Table of contents
•In January 2015, the Montana DEQ authorized BHJV to construct and operate an underground gold mine by publishing positive Record of Decision (“ROD”) on Final Environmental Impact Statement (“EIS”);
•In October 2015, the U.S. Forest Service (“USFS”) released its Final Decision Notice on haul road with a Finding of No Significant Impacts.
These milestones represent the final major hurdles to the receipt of necessary permits allowing the project to proceed. Final construction designs and completion of work will be required, along with bond payments, before final authority is granted to proceed with the proposed operation. Once final designs and road construction are complete, the USFS will grant authority to use local USFS roads for material haulage. Upon payment of the reclamation bond, the Hard Rock Operating Permit will be granted by the Montana DEQ.
Present Condition, Work Completed, and Exploration Plans
Prior to NJMC’s purchase of its stake in BHJV, the BHJV partners envisioned a 4 to 5-year mine life with estimated annual production of 30,000 to 35,000 ounces of gold. Mining was proposed to be conducted by cut and fill methods at a rate of 400 tons per day with a cut-off grade estimated at 4.8 gpt gold. Waste rock will be mixed with portland cement and placed underground as cemented rock backfill (CRF) in the mined ore zones to promote geotechnical stability. Preliminary metallurgical testwork indicates recoveries of approximately 85% of the contained gold in a flotation concentrate and 20% of the mass reporting to a rougher concentrate.
NJMC anticipates progress in regard to BHJV (not the mine or operations) this year and is cooperating with its partner to advance and or consolidate ownership in 2021. The partner maintains management control and all plans are subject to their approval and direction.
Present Condition of Plant & Equipment
Since 2009 Highland has invested nearly $40-million at Butte Highlands building a modern gold mine, including nearly 1.6 kilometers of underground mine development and construction of surface facilities, all of which are located on private lands owned by BHJV.
Geology & Mineralization
Gold mineralization at Butte Highlands is hosted primarily in lower Paleozoic Wolsey Shale with higher-grade mineralization occurring within sediments proximal to diorite sills and dikes. The project is within a favorable geologic domain that has hosted several multi-million-ounce gold deposits. There are currently no mineral reserves as defined by the SEC at Butte Highlands Project.
NEW JERSEY MINE PROJECT
Property Location
The New Jersey Mine is an underground gold mine located two miles east of Kellogg, Idaho, in the Coeur d'Alene Mining District. The mine is adjacent to U.S. Interstate Highway 90 and is easily accessed year-round by local roads. The New Jersey Mill is located on the same property. Three-phase electrical power is supplied to the New Jersey Mill by Avista Utilities.
Property Ownership
At the New Jersey Mine and Mill complex, the Company owns 102 acres of private land with surface and mineral rights, 108 acres of private land with mineral rights only, 40 acres of private land with surface rights only, and approximately 130 acres of unpatented mining claims. The unpatented claims are on federal land administered by the BLM. The gold-bearing Coleman vein system, including the underground workings and the Coleman pit, are located on the patented mining claims that are wholly-owned by the Company and not part of the New Mill Joint Venture.
Property History
In the late 1800’s and early 1900’s, New Jersey Mining and Milling (an unrelated company) drove more than 760 meters of development workings on the Coleman Vein and its northwest branch, including drifts, crosscuts, shafts, and raises. The historic development also included a 10-stamp gravity mill that was operated for a short period.
Present Condition, Work Completed, and Exploration Plans
Since 2001, NJMC has drilled 14 holes totaling 1,765 meters to explore the Coleman Vein and associated zones. Drilling confirmed vein system continuity and resulted in the discovery of the broad, low grade (averaging about 0.70 gpt gold) Grenfel zone. The Company’s best intercept of the Coleman vein assayed 2.76 gpt gold over 12.5 meters, which included 6.80 gpt gold over 2.5 meters.
In 2008, the Company performed underground exploration on the Coleman Vein at the 740 level, including 84 meters of drifting, with 20 meters along the vein before it was displaced by a fault. The Company also drill-tested the Scotch Thistle prospect, but a 400-meter program encountered silicification and associated alterations with no significant gold mineralization. There are at least 14 gold prospects within or near the New Jersey Mine.
14
Table of contents
In 2010, a raise was driven upward on the 740 level to explore a narrow high-grade vein that crosscut the main Coleman Vein. This raise was driven 12 meters vertically, leading to the extraction of 367 tonnes that assayed 2.68 gpt gold in processing at the New Jersey Mill.
NJMC has not conducted material work at the New Jersey Mine since 2010, and has no plans for exploration in 2021, With the New Jersey Mill actively processing ores from the Golden Chest Mine and the increase in the gold price, the potential economics of nearby gold prospects has improved significantly.
While the Company has conducted significant drilling, underground development, and even limited gold production from the New Jersey Mine, the project has no mineral reserves as recognized by the SEC.
As of December 31, 2020, the Company had a capitalized development plus investment cost of $248,289 associated with the mine.
Geology & Mineralization
The New Jersey Mine area is underlain by argillites and quartzites of the Proterozoic-age Prichard Formation, which commonly hosts gold mineralization regionally. The property occurs adjacent to and north of the major Osburn Fault, an important geological structure of the Coeur d’Alene Mining District. The Prichard Formation is divided into nine units of alternating argillites, siltites, and quartzites; the units exposed in the New Jersey Mine area appear to belong to the lower members. Gold mineralization is associated with sulfide-bearing quartz veins that cut the bedding in Prichard argillite and quartzite. Associated sulfides are pyrite, arsenopyrite, chalcopyrite, low-silver tennantite, galena, and sphalerite.
ALDER GULCH PROJECT
Property Location
The Alder Gulch Project is located just north of the town of Murray in Shoshone County, Idaho. The property can be accessed via dirt road from paved Forest Highway 9. The property is a gold exploration project without known reserves.
Property Ownership
The Alder Gulch Project is comprised of 368 acres of patented mining claims having both surface and mineral rights. There is no underlying royalty attached to the Alder Gulch property. The acquisition of this project was funded by the issuance of secured convertible promissory notes (the “Notes”) with an aggregate principal amount of US $885,000. The land is the security underlying the Notes. The outstanding principal amount of the Notes will bear interest at an annual rate of 8.0% for a term of three years. The principal amount of the Notes will be convertible at the option of the investors for common shares of the Company at a price of US $0.18 for per common share prior to the maturity date of the Notes. Interest only payments shall be made on the Notes payable and the Company may prepay the Notes in whole or in part without written consent of the investors.
Property History
The Alder Gulch land was originally patented in the 1880’s due to its gold potential and has changed ownership only a couple of times since Idaho statehood in 1890. It was held in the same family for nearly 100 years. Timber harvesting was the main activity occurring on the property in the last century. There is no evidence of modern mineral exploration on the property, but there is evidence of placer mining of gravel deposits left by an ancient river channel along the hillside. There is also evidence of historic prospect pits and exploration adits on the Alder Gulch property.
Present Condition, Work Completed, and Exploration Plans
In 2020, the Company conducted surface sampling, geologic mapping, trenching, and a ground-based magnetic survey. Also in 2020, a LIDAR survey was completed from Alder Gulch to the Golden Chest providing a detailed contour map of the surface on 1-meter intervals. This mapping will be an important tool for future gold exploration. A minor amount of logging also took place on the property in 2020. The Company is planning more exploration in 2021 including geologic mapping, trenching, sampling, geophysics, and core drilling.
Geology and Mineralization
The bedrock geology at the Alder Gulch Project is composed of siltite, argillite and quartzite belonging to the Proterozoic Prichard Formation and intrusive rocks of unknown age. A major structural feature is the Murray Peak Fault, a northerly trending, high-angle reverse fault which bisects the property. The ancient stream channel of auriferous gravels, the original justification for granting of the mining patent, extends across the Alder Gulch land from the northeast to the southwest. Gold mineralization is exposed through the gravel cover in numerous prospects, like on the Evans claim where a hydrothermally altered gold bearing intrusive sill barely outcrops above the gravels. The sill contains disseminated pyrite and galena with numerous quartz vein stringers mineralized with chalcopyrite, galena and gold bearing tellurides. A select sample from this sill assayed 4.75 gpt gold, 15.65 gpt silver, 2.2 % lead and 7.96 ppm tellurium.
15
Table of contents
BUCKSKIN PROJECT
Property Location
The Buckskin Project is located 1.5 kilometers north of the town of Murray in Shoshone County, Idaho. The property can be accessed via dirt roads from paved Forest Highway 9. The property is a gold exploration project without known reserves.
Property Ownership
The Buckskin Project is comprised of 12 patented mining claims covering 218 acres and 73 unpatented mining claims covering approximately 1,367 acres. The 218 acres of patented mining claims was acquired through an exploration and mining lease. The Buckskin Lease term runs for 7.5 years and includes annual payments of $12,000 and a 2-percent NSR on future production from the property. If the property is placed into production, the lease will continue as long as production is underway and also includes a right of first refusal for NJMC to purchase the property, and the lease payments are treated as an advance payment on the royalty. The unpatented lode claims adjacent to the core group of claims are wholly owned by the Company and not subject to a royalty. These claims require an annual claim fee payment to the BLM.
Property History
The Buckskin property was mined intermittently for both gold and base metals in the early 20th century with most of the mining completed in the 1930’s. The property contains numerous old workings, most of which are inaccessible. A mill was located on the property but historic production is unknown.
Present Condition, Work Completed, and Exploration Plans
In 2019, the Company conducted exploration efforts in the Buckskin area with trenching mapping/sampling, road building, reopening historic underground workings, and underground mapping/sampling. The Company conducted additional field work in 2020 such as mapping, trenching, and ground based magnetic surveys. More geophysics and sampling are planned for 2021 and drilling may follow.
Geology & Mineralization
The bedrock geology at the Buckskin Project are largely quartzites of the Burke Formation and argillite-siltite of the Prichard Formation. A major structural feature is the Murray Peak Fault, a northerly trending, high-angle reverse fault. Historical prospects and adits are developed along northerly trending shear zones that are likely related to the Murray Peak Fault, that contain and silica flooded rock. Gold mineralization is found in quartz veins and is associated with sulfide minerals including pyrite, chalcopyrite and galena. Anomalous tungsten was also detected in assays.
BUTTE GULCH PROJECT
Property Location
The Butte Gulch Project is located 3 kilometers east of the town of Murray in Shoshone County, Idaho. The project lies immediately adjacent to the east side of Golden Chest Mine. It is accessed by paved Forest Highway 9, then on secondary dirt roads. The property is an exploration property without known reserves.
Property Ownership
The Butte Gulch Project is comprised of 60 acres of both patented surface and mineral rights, 117 acres of patented mineral rights, and 602 acres of unpatented claims. The patented surface and mineral rights were purchased from a third party in mid-2018 and any lode production from the patented claims is subject to a 2% NSR. The patented claims where the Company only owns the lode mineral rights can be placer mined by the current owner who was the vendor of the property. NJMC holds a first right of refusal for the purchase of the surface rights not already owned by the Company. The unpatented lode claims are wholly owned by the Company and not subject to a royalty.
Property History
Butte Gulch has been placer mined by several different operations over the last century however; there are no gold production records from these historic placer mining efforts. There is evidence of historic lode prospecting in the form of surface pits and exploration adits on the property, but the Company is not aware of any modern exploration occurring on the property.
Present Condition, Work Completed, and Exploration Plans
The property is an exploration stage property adjacent to the Golden Chest Mine. The property vendor has retained the placer mining rights in the bottom of the drainage on the patented claims and conducted placer mining activity last year. NJMC has no affiliation or connection with the placer mining operation. Two historic adits have been reopened for mapping and sampling. Additionally, areas have been rock sampled where current placer operations have uncovered altered bedrock. More geologic fieldwork is planned for the upcoming 2021 season to explore for gold mineralization.
Geology & Mineralization
Outcrops in the Butte Gulch area are dominantly argillite, siltite and quartzite units that belong to the Prichard Formation. The hinge line of a major regional scale fold called the Trout Creek Anticline traverses the property. Both northwest and northeast trending quartz veins containing pyrite, galena and chalcopyrite have been identified with anomalous silver mineralization.
16
Table of contents
GIANT LEDGE PROJECT
Property Location
The Giant Ledge Project is located six kilometers east of the town of Murray in Shoshone County, Idaho. The project is situated in Granite Gulch and is accessed by paved Forest Highway 9 and secondary dirt roads. It is an exploration project without known ore reserves.
Property Ownership
The Company’s land position consists of 57 unpatented lode claims covering an area of 1,119 acres. The claim group includes 3 separate claim blocks; Giant Ledge, Porphyry and Bear. The unpatented lode claims are wholly owned by the Company and not subject to a royalty. These claims require an annual claim fee payment to the BLM.
Property History
The Giant Ledge Project consists of several historical prospected areas with lead, copper and gold mineralization in and along the contact of the igneous intrusive. The Giant Ledge Mine was active in the 1920’s when a 122 meter deep shaft was sunk and about 450 meters of drift development was completed. A flotation mill was erected and a minor amount of undisclosed production was achieved. Bunker Hill Mining Company also examined and mapped the mine workings in the 1950’s. Sunshine Mining Company conducted exploration at the Giant Ledge in the mid-1980’s and drilled two core holes. In 2008, the Company obtained core from Sunshine’s drilling program, and it was re-logged and assayed. The best of the mineralization showed 4.6 meters of 0.908 gpt gold and 0.24% combined copper and lead. An extensive soil sampling program was completed in conjunction with a VLF and magnetometer survey.
Present Condition, Work Completed, and Exploration Plans
The property is an exploration stage prospect east of the Golden Chest Mine. Although no significant work was performed at Giant Ledge during the 2009-2020 period, the Company is preparing to resume exploration efforts in 2021.
Geology & Mineralization
The primary structural feature on the Giant Ledge property is the French Gulch fault. The fault contact extends through the property, separating monzonitic intrusive rocks on the west, from Prichard Formation’s argillite and quartzites on the east. Structurally controlled mineralization is found in both, the contact between argillite-quartzite sediments and in the monzonite. Seams and disseminations of auriferous pyrite, galena and chalcopyrite are found up to 10 meters into the footwall and hangingwall.
POTOSI PROPERTY
Property Location
The Potosi Project is located 4.4 kilometers southwest of the town of Murray in Shoshone County, Idaho. It is an exploration project without known ore reserves. The project is accessed by the paved Beaver Creek county road and other secondary dirt roads.
Property Ownership
NJMC acquired fee simple title to of 3 patented lode claims as part of the 2018 Butte Gulch land acquisition. The 3 patented claims cover a 71 acre area.
Property History
Potosi has been placer mined in several different operations over the last century however, there is no gold production records from these historic placer mining efforts. There is evidence of historic lode prospecting in the form of surface pits and exploration adits on the property, but the Company is not aware of any modern lode exploration occurring on the property.
Present Condition, Work Completed, and Exploration Plans
Minor reclamation work, road improvements and timber harvesting was conducted in 2019, In 2020, the Company completed the remaining reclamation of surface disturbance caused by a previous operator. There are no exploration plans for 2021.
Geology & Mineralization
Host rocks at the property are siltites and argillites of the Prichard Formation. Geologic mapping suggests fault structures associated with the Crown Point Shear Zone may cross the property.
McKINLEY-MONARCH PROJECT
Property Location
The McKinley-Monarch property encompasses a number of historic prospects in central Idaho and extends, from the town of Riggins northward for nearly five miles. The property is an early-stage, gold exploration project accessed via public and private dirt roads off of US Highway 95. The property is without known ore reserves.
17
Table of contents
Property Ownership
In 2013, NJMC acquired the McKinley-Monarch property through its acquisition of Idaho Champion Resources (“ICR”). The Company also holds 28 unpatented claims, totaling 560 acres, adjacent the 4 patented claims of the McKinley Mine (not owned by the Company). These claims require an annual claim fee payment to the BLM.
Property History
The McKinley-Monarch property is located in the Simpson Mining District and was first prospected in 1891. The property was subject to intermittent mining activity until it was shut down during WWII. The property remained largely dormant until Hunt Energy executed a sampling program in the late 1970’s and Kennecott Exploration completed a property evaluation in the early-1990s. In 2012, ICR started surface exploration of the property, including a ground magnetic survey, before the acquisition by NJMC in 2013.
ICR previously conducted ground magnetic survey over a large portion of the property, approximately 2.4 by 5.6 kilometers. The survey indicates that potentially major structures passing through the district are associated with some degree of demagnetization. It also appears to indicate the potential mineralization at the McKinley-Monarch property along with several potential target areas, including historic mines and prospects that extend for several miles along the known trend.
Present Condition, Work Completed, and Exploration Plans
Surface mapping and sampling by NJMC identified an area with significant gold mineralization in outcrop: the Monarch Zone, about one kilometer S-SW of the McKinley Mine. At the Monarch Zone, several samples returned high-grade gold with values up to 26 gpt. There are no exploration plans for 2021.
Geology and Mineralization
The McKinley-Monarch project is located within the rocks of the Riggins and Seven Devils Groups, a remnant of a subducted island-arc complex. The metasediments of the accreted Riggins and Seven Devils Groups are considered to be the source of coarse gold found in the nearby historic placer operations. Mapping and geophysics both suggest major northerly trending fault structures cut these metasediments. Rock alteration consists of carbonization and silicification. Gold mineralization is associated with auriferous pyrite and quartz-carbonate veining.
EASTERN STAR PROJECT
Property Location
The Eastern Star property is located about four miles west of Elk City in central Idaho. It consists of 11 patented lode mining claims (220 acres) acquired by NJMC in 2014 and an additional 45 unpatented lode claims (413 acres) located in 2018. Eastern Star is an early-stage exploration project with no mineral reserves as recognized by the SEC. The property is accessible via improved dirt roads off of Idaho State Highway 14.
Property Ownership
NJMC acquired fee simple title to the 11 patented claims (220 acres) from Premium Exploration Inc. (“Premium”) for $250,817 in 2014. The Company also holds the 45 unpatented lode claims (413 acres) surrounding the core group of patented claims. All of the Eastern Star claims are wholly owned by the Company and not subject to a royalty. The unpatented claims require an annual claim fee payment to the BLM.
Property History
The Elk City Mining District is an historic gold mining region dating back to the 1860s that once supported more than 20 underground mines, including the Eastern Star, along with placer dredging operations. Modern exploration in the district by companies including Cypress-Amax, Kinross Gold, and Bema Gold has focused on near-surface bulk tonnage gold potential, while the many smaller-scale high-grade gold occurrences have largely been ignored.
In recent years, prior operator Premium collected grab samples from three separate locations, representing nearly one-half mile of mineralized trend. Of 25 grab samples, nine returned gold values greater than 16.9 gpt. Premium then drilled three core holes at Eastern Star, targeting a bulk mineable gold deposit.
Present Condition, Work Completed, and Exploration Plans
In 2014, The Company completed mapping, sampling and trenching programs. Company geologists identified several quartz veins that had been exploited by historic prospect pits and small shafts. Surface grab samples from these veins confirmed the widespread presence of high-grade gold within mineralized quartz vein material.
The Company performed an 880-meter trenching program. The channel samples intercepted notable gold mineralization including contiguous samples up to 10.4 meters of 2.25 gpt gold and 6.4 meters of 7.97 gpt gold (which included 4.3 meters of 11.34 gpt gold).
Although no significant work was performed at Eastern Star during the 2015-2020 period, the Company is preparing to resume exploration efforts in 2021. The Company’s exploration objective at Eastern Star is to evaluate the potential of these high-grade gold-bearing quartz veins for development and production.
18
Table of contents
Geology & Mineralization
The Eastern Star property is underlain by extensively weathered, high grade metamorphic rocks such as biotite gneiss and schist, intruded by felsic dikes and sills emanating from the Idaho Batholith. Two types of gold mineralization are present at the Eastern Star property. The first is the large, low-grade, bulk tonnage mineralization associated with the northerly trending Orogrande Shear Zone, and the second is the easterly trending high-grade gold quartz veins.
DIAMOND CREEK RARE EARTH PROJECT
Property Location
The Diamond Creek REE Project covers approximately 1,040 acres and is comprised of 52 unpatented mining claims. It is located in the Eureka Mining district, approximately 13 kilometers (8 miles) north-northwest of the town Salmon, Idaho. The property is accessed by a dirt road known as the Diamond Creek road. The Diamond Creek Project is an exploration stage property with no mineral reserves as recognized by the SEC.
Property Ownership
The unpatented lode claims are wholly owned by the Company and there are no underlying royalties. The unpatented claims require an annual claim fee payment to the BLM.
Property History
The area was historically prospected for gold until 1949 when its unique geologic setting was recognized by the United States Geologic Survey (USGS) and the Idaho Geological Survey. In the early 1950’s the U.S. government sponsored country-wide exploration for nuclear power related raw materials. This campaign resulted in the discovery of thorium in areas of Lemhi County, including the REE occurrence in the Diamond Creek area. Several other companies have undertaken minor rare earths exploration programs on the property including one stage of limited core drilling.
Present Condition, Work Completed, and Exploration Plans
The Company staked the claims that make up the property in early 2020. Some surface exploration activities including mapping and sampling were completed in 2020. Additionally, the Company submitted a Plan of Operations (POO) to the USFS for a core drilling program. The POO is currently under review by the USFS.
Geology & Mineralization
The REE mineralization at Diamond Creek is found in quartz veins over a large area approximately 3.2 km long and 0.8 km wide. There are at least eight known veins and they range in width from 0.15 to 7.6 m in thickness. Vein widths appear best developed in the metasediments and can be traced on the surface for distances ranging from 33.5 to 780 m.
Samples taken by NJMC show REE oxide contents ranging from 0.59 to 5.51 percent. Work by the USGS in 1979 reported three samples cut across one of the larger veins were assayed for gold and contained 0.5, 2.4 and 11.9 grams per tonne. Down-dip extensions of these mineralized veins have never been sufficiently tested. Historical reports indicate two short core holes have been completed with some significant REE mineralization noted.
ROBERTS RARE EARTH PROJECT
Property Location
The Roberts Rare Earth Element Project is comprised of 12 unpatented mining claims covering an area of approximately 219 acres. This Project is located within the Mineral Hill Mining District, approximately 48 kilometers (30 miles) northwest of Salmon, Idaho. Access to the property is via National Forest Road 036 (Indian Creek Road).
Property Ownership
The unpatented lode claims covering the Roberts Rare Earth Project are wholly owned by the Company and are not subject to any underlying royalties. Annual claim fees are due to the BLM to maintain the validity of an unpatented mining claim.
Property History
The Mineral Hill district was historically prospected in the early 1900’s for gold and copper. Rare earth element (REE) mineralization was first discovered in the early 1950’s. Studies conducted by A. T. Abbott (1954) and A. L. Anderson (1958) from the Idaho Geological Survey, and E. P. Kaiser (1956) with the USGS, pioneered recognition of these REE occurrences. Abbott reported cutting a 2.5-foot sample across the Roberts Lode which returned 21.5-percent combined rare earth oxides and thoria.
Present Condition, Work Completed, and Exploration Plans
The Company staked the claims that make up the property in early 2020. Some surface exploration activities including mapping and sampling were completed in 2020. Sampling by Company geologists returned assays of combined rare earths elements in excess of 12%. Similarly, as with NJMC’s Diamond Creek project, REE’s are not the only valuable commodities; gold and niobium may also be profitable by-products. Recently collected samples at the Roberts property have gold assays up to 8.8 grams per tonne (0.25 ounce per ton) and niobium as high as 0.50-percent. Exploration plans geologic mapping, sampling and geophysical surveys. An exploration drill program is being planned for submittal to the USFS.
19
Table of contents
Geology & Mineralization
The REE mineralization at the Roberts Project is associated with a unique group of igneous rocks known as carbonatites. Carbonatites are carbonate rocks sourced from magmatic origins, with primary carbonate compositions exceeding 50%. The Roberts Project contains two of the eight known carbonatite occurrences within the Mineral Hill District. The first carbonatite can be found in a northwest-trending seam which measures approximately 400 meters (1,300 feet) long and 90 meters (300 feet) wide; the second occurrence occurs as a small carbonatite plug, measuring about 200 meters in diameter.