African Gold Group, Inc. (TSX-V: AGG) (“
AGG” or
the “
Company”) is pleased to report the final
results for the Phase 1 drilling campaign at the Kobada Gold
Project. The Phase 1 drilling campaign focused on confirming and
upgrading the confidence level of the resource in the feasibility
study from 2016 (the “
2016 Feasibility Study”) and
the previously established structural mineralization model. The
Company expects to issue an updated mineral resource statement in
February 2020.
The results from the Phase I drilling
campaign returned better than expected grades within the central
zone of the Kobada main shear and reinforced the predictiveness of
our geological model. High-grade intersections over a greater
thickness together with additional resources in the satellite
orebodies is expected to complement the resource model
favourably.
Highlights include:
- Drill hole KP19_P1_03
returned 1.65 g/t gold over 4.90 m, including 3.09 g/t gold over
2.5 m
- Drill hole KP19_P1_11
returned 12.60 g/t gold over 1.0 m
- Drill hole KP19_P1_12
returned 5.34 g/t gold over 6.0 m including 29.70 g/t gold over
1.05 m
- Drill hole KP19_P1_17
returned 1.59 g/t gold over 11.0 m, including 19.0 g/t gold over
0.8 m
- Drill hole KP19_P1_17
returned 1.40 g/t gold over 5.0 m, including 6.39 g/t gold over 1.0
m
- Drill hole KP19_P1_18
returned 0.94 g/t gold over 49.0 m, including 2.11 g/t gold over
5.71 m
- Drill hole KP19_P1_18
returned 11.60 g/t gold over 1.55 m and 5.96 g/t gold over 1.0
m
- Drill hole KP19_P1_20
returned 26.50 g/t gold over 1.0 m
- Drill hole KP19_P1_21
returned 1.67 g/t gold over 21.60 m, including 11.9 g/t gold over
2.0 m and 7.14 g/t gold over 1.1 m
- Drill hole KP19_P1_31
returned 2.67 g/t gold over 5.61 m, including 5.25 g/t gold over
2.61 m
- Drill hole KP19_P1_33
returned 1.58 g/t gold over 15.06 m, including 12.40 g/t gold over
1.4 m
- Drill hole KP19_P1_36
returned 12.30 g/t gold over 1.0 m and 3.14 g/t gold over 1.5
m
- Drill hole KP19_P1_37
returned 1.45 g/t gold over 19.0 m, including 4.96 g/t gold over
1.82 m and 13.20 g/t gold over 1.3 m
“The very compact high-grade intersections over
several metres in the area of the future open pit are very
encouraging,” says Dr. Andreas Rompel, Vice President Exploration
of the Company. “We are very pleased with the completion of the
Phase 1 drilling program and are keenly expecting the revised
resource model and more positive results from Phase 2. The Kobada
ore body is exhibiting significant upside potential and our focus
now is on targeting extensions to the main shear zone where the
drilling has been focused, but also to explore other shear zones on
the concession. To date we have still only drilled approximately
4km of the main shear zone, in which the updated resource will be
targeted. There are an additional 26 strike kilometres of
identified shear zones, exhibiting identical geological
characteristics to the Kobada shear. Based upon the work done to
date, it becomes obvious that there is great potential to
significantly increase the Kobada resource on the back of
additional exploration drilling.”
The Phase 1 drilling campaign, which focused on
confirming and upgrading the confidence level of the previous
Mineral Resource, has confirmed a strong correlation with the
geological model of the 2016 Feasibility Study. AGG drilled 34
drill holes totaling 5,302.8 metres of core during Phase 1. The
returned assays were tested by fire assay with AAS finish in the
accredited SGS laboratory in Bamako, Mali. The laboratory operates
a quality system according to the ISO 17 025 standards.
AGG has implemented quality assurance and
quality control (QAQC) protocols for the drilling campaign to
ensure consistent quality. Every 10th sample is either a blank
sample, certified reference material (CRM) of various grades or
duplicate samples.
All samples were core samples of HQ or NQ size.
The laterite, saprolite and transition zones were drilled HQ size
and the harder, less weathered sulphide zone was drilled using NQ.
Overall core recovery throughout Phase 1 was approximately 85% in
Saprolite and 95% in fresh/hard rock.
Phase 2 Drilling Campaign
The Phase 2 drilling campaign is already 75%
complete and is progressing to the north of the central zone with
the aim to expand the total Mineral Resource. The Company is
anticipating the assay results for Phase 2 over the coming weeks.
Continuous mineralization north of the central zone is expected to
further confirm our view that the Kobada project is larger than
previously suggested in the 2016 feasibility study.
“The completion of Phase 1 ahead of schedule,
and commencement of Phase 2 drill programme is an exciting
advancement of the Kobada project,” says Danny Callow Chief
Operating Officer of AGG. “Not only have we updated and gained
significant confidence as a result of Phase 1 drilling, the upside
potential from Phase 2 and the Gosso target is potentially huge. As
part of the definitive feasibility study work, we intended to
upgrade the resource model, the ESIA and deliver a very robust
study document that will allow us to move quickly into construction
on this project. Everything we have seen so far points to a better
than expected orebody, which is easy to mine and process, with
oxide ore close to surface and mineralized throughout the Phase 1
holes. I am excited to start to deliver key components of the DFS
throughout this first quarter and the resource model due at the end
of January is the first key document.”
Qualified Persons
The scientific and technical information
contained in this press release has been reviewed, prepared and
approved by Dr. Andreas Rompel, PhD, Pr. Sci. Nat. (400274/04),
FSAIMM, Vice President Exploration of AGG, who is a “Qualified
Person” as defined by National Instrument 43-101 – Standards of
Disclosure for Mineral Projects (“NI 43-101“) and
by Mr. Uwe Engelmann (BSc (Zoo. & Bot.), BSc Hons (Geol.),
Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd
and a member of the South African Council for Natural Scientific
Professions.
About African Gold Group
African Gold Group is a Canadian listed
exploration and development company on the TSX Venture Exchange
(TSX V:AGG) with its focus on developing a gold platform in West
Africa. Its principal asset is the Kobada Project in Mali.
Assay standards:
Samples <3.0kg are dried in trays, crushed to
a nominal 2 mm using a jaw crusher, then <1.5 kg is split using
a Jones type riffle. The reject sample is retained in the original
bag and stored. The split is pulverised in a LM2 to a nominal 85%
passing 75um. Approximately 200g sub-sample is taken for assay,
with the pulverised residue retained in a plastic bag. All the
preparation equipment is flushed with barren material prior to the
commencement of the job. A 50g sub sample is fused with
litharge-based flux, cupelled and prill dissolved in aqua regia and
gold determined by flame AAS - Detection Limit 0.01ppm.
For more information:
Stan Bharti Chairman(416) 861 2267
Cautionary statements
This press release contains "forward looking
information" within the meaning of applicable Canadian securities
legislation. Forward looking information includes, but is not
limited to, management’s, the Company’s development and exploration
plans for the Kobada project, expectation of grade and resources at
the Kobada gold project, expectation of drill results at the Kobada
project, the timeline for the completion of the Phase 2 drilling
program, the definitive feasibility study and the updated resource
model, expectations for mineralization and location of extensions
at the Kobada gold project and expected mining methods at the
Kobada gold project, and other statements with respect to the
future plans or intentions of the Company. Generally, forward
looking information can be identified by the use of forward-looking
terminology such as "plans", "expects" or "does not expect", "is
expected", "budget", "scheduled", "estimates", "forecasts", “aims”,
"intends", "anticipates" or "does not anticipate", or "believes",
or variations of such words and phrases or state that certain
actions, events or results "may", "could", "would", "might" or
"will be taken", "occur" or "be achieved". Forward-looking
information is subject to known and unknown risks, uncertainties
and other factors that may cause the actual results, level of
activity, performance or achievements of the Company to be
materially different from those expressed or implied by such
forward-looking information, including but not limited to: general
business, economic, competitive, geopolitical and social
uncertainties; the actual results of exploration activities;
regulatory risks; risks inherent in foreign operations; and other
risks of the mining industry. Although the Company has attempted to
identify important factors that could cause actual results to
differ materially from those contained in forward-looking
information, there may be other factors that cause results not to
be as anticipated, estimated or intended. There can be no assurance
that such information will prove to be accurate, as actual results
and future events could differ materially from those anticipated in
such statements. Accordingly, readers should not place undue
reliance on forward looking information. The Company does not
undertake to update any forward-looking information, except in
accordance with applicable securities laws.
NEITHER TSX VENTURE EXCHANGE NOR ITS
REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE
POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR
THE ADEQUACY OR ACCURACY OF THIS RELEASE.
Table 1: Significant Intersections
(Above 1 g/t)
BHID |
From |
To |
Intersection Length (m) |
Au_Final (g/t) |
KB19_P1_02 |
63.00 |
64.00 |
1.00 |
1.87 |
KB19_P1_02 |
64.00 |
65.00 |
1.00 |
2.20 |
KB19_P1_02 |
149.00 |
150.00 |
1.00 |
2.00 |
KB19_P1_03 |
21.00 |
23.50 |
2.50 |
3.09 |
KB19_P1_03 |
82.00 |
83.00 |
1.00 |
1.55 |
KB19_P1_03 |
83.00 |
84.60 |
1.60 |
2.13 |
KB19_P1_03 |
115.35 |
116.15 |
0.80 |
1.46 |
KB19_P1_03 |
116.15 |
118.00 |
1.85 |
1.57 |
KB19_P1_04 |
85.00 |
86.00 |
1.00 |
1.94 |
KB19_P1_05 |
67.50 |
68.80 |
1.30 |
1.44 |
KB19_P1_05 |
68.80 |
69.80 |
1.00 |
1.66 |
KB19_P1_06 |
74.00 |
75.00 |
1.00 |
1.55 |
KB19_P1_06 |
114.00 |
115.00 |
1.00 |
2.01 |
KB19_P1_06 |
118.50 |
120.50 |
2.00 |
3.06 |
KB19_P1_07 |
102.76 |
103.75 |
0.99 |
2.02 |
KB19_P1_07 |
103.75 |
104.81 |
1.06 |
2.61 |
KB19_P1_08 |
47.00 |
49.00 |
2.00 |
1.90 |
KB19_P1_17 |
58.40 |
59.20 |
0.80 |
19.00 |
KB19_P1_17 |
113.00 |
114.00 |
1.00 |
6.39 |
KB19_P1_17 |
125.00 |
126.00 |
1.00 |
1.65 |
KB19_P1_18 |
12.60 |
14.00 |
1.40 |
1.22 |
KB19_P1_18 |
15.89 |
18.90 |
3.01 |
2.35 |
KB19_P1_18 |
18.90 |
21.60 |
2.70 |
1.84 |
KB19_P1_18 |
24.00 |
25.00 |
1.00 |
1.41 |
KB19_P1_18 |
44.10 |
45.65 |
1.55 |
11.60 |
KB19_P1_18 |
56.00 |
57.00 |
1.00 |
5.96 |
KB19_P1_10 |
0.00 |
1.00 |
1.00 |
2.81 |
KB19_P1_10 |
8.00 |
9.00 |
1.00 |
1.47 |
KB19_P1_10 |
37.00 |
38.00 |
1.00 |
1.12 |
KB19_P1_09 |
6.50 |
9.00 |
2.50 |
2.09 |
KB19_P1_11 |
37.00 |
38.00 |
1.00 |
2.02 |
KB19_P1_11 |
56.00 |
56.70 |
0.70 |
1.21 |
KB19_P1_11 |
60.90 |
62.15 |
1.25 |
1.20 |
KB19_P1_11 |
88.00 |
89.40 |
1.40 |
1.97 |
KB19_P1_11 |
128.00 |
129.00 |
1.00 |
1.46 |
KB19_P1_12 |
158.00 |
159.05 |
1.05 |
29.70 |
KB19_P1_13 |
32.00 |
33.00 |
1.00 |
2.12 |
KB19_P1_13 |
84.00 |
85.00 |
1.00 |
1.67 |
KB19_P1_13 |
89.00 |
90.00 |
1.00 |
3.24 |
KB19_P1_13 |
93.00 |
94.25 |
1.25 |
2.16 |
KB19_P1_15 |
90.15 |
91.06 |
0.91 |
1.05 |
KB19_P1_20 |
62.25 |
63.50 |
1.25 |
1.14 |
KB19_P1_20 |
77.00 |
78.00 |
1.00 |
1.18 |
KB19_P1_20 |
120.00 |
121.00 |
1.00 |
4.08 |
KB19_P1_20 |
123.91 |
125.10 |
1.19 |
1.30 |
KB19_P1_20 |
189.00 |
190.00 |
1.00 |
26.50 |
KB19_P1_20 |
206.00 |
207.00 |
1.00 |
1.44 |
KB19_P1_21 |
18.00 |
20.00 |
2.00 |
11.90 |
KB19_P1_21 |
22.10 |
23.20 |
1.10 |
7.14 |
KB19_P1_21 |
86.90 |
88.50 |
1.60 |
2.94 |
KB19_P1_21 |
88.50 |
89.50 |
1.00 |
2.78 |
KB19_P1_21 |
97.50 |
98.80 |
1.30 |
4.93 |
KB19_P1_21 |
104.30 |
105.50 |
1.20 |
1.75 |
KB19_P1_21 |
108.50 |
109.50 |
1.00 |
1.57 |
KB19_P1_21 |
112.40 |
113.40 |
1.00 |
1.20 |
KB19_P1_21 |
123.00 |
124.50 |
1.50 |
1.11 |
KB19_P1_28 |
123.00 |
125.50 |
2.50 |
1.32 |
KB19_P1_28 |
146.63 |
147.63 |
1.00 |
1.95 |
KB19_P1_28 |
183.10 |
184.10 |
1.00 |
2.80 |
KB19_P1_28 |
189.70 |
190.70 |
1.00 |
1.25 |
KB19_P1_28 |
193.70 |
194.70 |
1.00 |
4.13 |
KB19_P1_28 |
229.67 |
230.67 |
1.00 |
1.64 |
KB19_P1_23 |
46.55 |
50.00 |
3.45 |
1.93 |
KB19_P1_23 |
76.00 |
77.00 |
1.00 |
2.59 |
KB19_P1_23 |
81.05 |
82.75 |
1.70 |
1.57 |
KB19_P1_23 |
83.33 |
84.45 |
1.12 |
1.40 |
KB19_P1_23 |
85.45 |
86.45 |
1.00 |
1.75 |
KB19_P1_23 |
101.13 |
102.19 |
1.06 |
1.33 |
KB19_P1_23 |
105.00 |
107.00 |
2.00 |
1.35 |
KB19_P1_23 |
132.00 |
133.00 |
1.00 |
1.71 |
KB19_P1_23 |
138.65 |
139.52 |
0.87 |
1.08 |
KB19_P1_23 |
141.05 |
141.96 |
0.91 |
5.41 |
KB19_P1_23 |
149.95 |
151.00 |
1.05 |
1.44 |
KB19_P1_27 |
33.50 |
35.00 |
1.50 |
4.18 |
KB19_P1_27 |
39.00 |
40.00 |
1.00 |
1.84 |
KB19_P1_27 |
44.00 |
45.00 |
1.00 |
1.37 |
KB19_P1_32 |
54.40 |
55.50 |
1.10 |
5.12 |
KB19_P1_31 |
126.79 |
129.40 |
2.61 |
5.25 |
KB19_P1_31 |
139.00 |
141.00 |
2.00 |
4.79 |
KB19_P1_31 |
142.50 |
143.60 |
1.10 |
1.34 |
KB19_P1_31 |
153.47 |
158.10 |
4.63 |
1.34 |
KB19_P1_31 |
291.72 |
292.72 |
1.00 |
3.76 |
KB19_P1_33 |
30.10 |
33.00 |
2.90 |
1.46 |
KB19_P1_33 |
36.00 |
36.80 |
0.80 |
6.05 |
KB19_P1_33 |
55.65 |
57.80 |
2.15 |
1.17 |
KB19_P1_33 |
71.15 |
72.00 |
0.85 |
1.70 |
KB19_P1_33 |
98.00 |
102.00 |
4.00 |
1.64 |
KB19_P1_33 |
124.44 |
125.60 |
1.16 |
1.80 |
KB19_P1_33 |
128.64 |
129.50 |
0.86 |
3.41 |
KB19_P1_33 |
130.40 |
131.80 |
1.40 |
12.40 |
KB19_P1_33 |
217.12 |
217.90 |
0.78 |
1.72 |
KB19_P1_35 |
61.90 |
64.20 |
2.30 |
1.51 |
KB19_P1_35 |
83.90 |
84.90 |
1.00 |
1.50 |
KB19_P1_36 |
8.80 |
9.80 |
1.00 |
12.30 |
KB19_P1_36 |
30.30 |
31.80 |
1.50 |
3.14 |
KB19_P1_37 |
63.00 |
64.00 |
1.00 |
5.67 |
KB19_P1_37 |
70.00 |
71.00 |
1.00 |
1.97 |
KB19_P1_37 |
76.72 |
77.50 |
0.78 |
1.57 |
KB19_P1_37 |
79.42 |
82.60 |
3.18 |
4.16 |
KB19_P1_37 |
96.00 |
97.00 |
1.00 |
2.00 |
KB19_P1_37 |
107.80 |
109.30 |
1.50 |
1.77 |
KB19_P1_37 |
134.00 |
135.82 |
1.82 |
4.96 |
KB19_P1_37 |
149.70 |
151.00 |
1.30 |
13.20 |
Table 2: Mineralization
Zones
|
|
Mineralized Zone |
Includes |
BHID |
Ore Body |
From |
To |
CompositeLength (m) |
CompositeGrade (g/t) |
From |
To |
Includes(m) |
Includes(g/t) |
KB19_P1_02 |
Southern Satellite |
46.60 |
51.00 |
4.40 |
0.42 |
|
|
|
|
KB19_P1_02 |
Southern Satellite |
56.00 |
57.00 |
1.00 |
0.36 |
|
|
|
|
KB19_P1_02 |
Southern Satellite |
63.00 |
65.00 |
2.00 |
2.04 |
|
|
|
|
KB19_P1_02 |
Southern Satellite |
67.00 |
69.00 |
2.00 |
0.60 |
|
|
|
|
KB19_P1_02 |
Southern Satellite |
90.00 |
92.00 |
2.00 |
0.78 |
|
|
|
|
KB19_P1_02 |
Southern Satellite |
149.00 |
150.00 |
1.00 |
2.00 |
|
|
|
|
KB19_P1_03 |
Southern Satellite |
5.00 |
6.00 |
1.00 |
0.56 |
|
|
|
|
KB19_P1_03 |
Southern Satellite |
20.00 |
24.90 |
4.90 |
1.65 |
21.00 |
23.50 |
2.50 |
3.09 |
KB19_P1_03 |
Southern Satellite |
71.00 |
95.60 |
24.60 |
0.33 |
82.00 |
84.60 |
2.60 |
1.91 |
KB19_P1_03 |
Southern Satellite |
104.00 |
123.00 |
19.00 |
0.34 |
115.35 |
118.00 |
2.65 |
1.54 |
KB19_P1_03 |
Southern Satellite |
135.00 |
137.00 |
2.00 |
0.34 |
|
|
|
|
KB19_P1_03 |
Southern Satellite |
161.00 |
163.00 |
2.00 |
0.53 |
161.00 |
162.00 |
1.00 |
0.92 |
KB19_P1_04 |
Southern Satellite |
24.00 |
29.00 |
5.00 |
0.37 |
25.00 |
27.00 |
2.00 |
0.55 |
KB19_P1_04 |
Southern Satellite |
83.00 |
90.00 |
7.00 |
0.49 |
85.00 |
87.00 |
2.00 |
1.44 |
KB19_P1_04 |
Southern Satellite |
163.50 |
167.50 |
4.00 |
0.27 |
163.50 |
164.50 |
1.00 |
0.46 |
KB19_P1_05 |
Southern Satellite |
64.50 |
74.00 |
9.50 |
0.79 |
67.50 |
69.80 |
2.30 |
1.54 |
KB19_P1_06 |
Southern Satellite |
65.50 |
75.00 |
9.50 |
0.41 |
73.00 |
75.00 |
2.00 |
1.27 |
KB19_P1_06 |
Southern Satellite |
105.00 |
120.50 |
15.50 |
0.65 |
114.00 |
115.00 |
1.00 |
2.01 |
KB19_P1_06 |
Southern Satellite |
|
|
|
|
118.50 |
120.50 |
2.00 |
3.06 |
KB19_P1_07 |
Southern Satellite |
100.00 |
104.81 |
4.81 |
1.35 |
102.76 |
103.75 |
0.99 |
2.02 |
KB19_P1_07 |
Southern Satellite |
|
|
|
|
103.75 |
104.81 |
1.06 |
2.61 |
KB19_P1_08 |
Main Shear South |
47.00 |
57.50 |
10.50 |
0.60 |
47.00 |
49.00 |
2.00 |
1.90 |
KB19_P1_17 |
Main Shear South |
50.50 |
61.50 |
11.00 |
1.59 |
50.50 |
51.50 |
1.00 |
0.92 |
KB19_P1_17 |
Main Shear South |
|
|
|
|
58.40 |
59.20 |
0.80 |
19.00 |
KB19_P1_17 |
Main Shear South |
87.00 |
93.00 |
6.00 |
0.38 |
88.00 |
89.00 |
1.00 |
0.92 |
KB19_P1_17 |
Main Shear South |
110.00 |
115.00 |
5.00 |
1.40 |
113.00 |
114.00 |
1.00 |
6.39 |
KB19_P1_17 |
Main Shear South |
125.00 |
126.00 |
1.00 |
1.65 |
|
|
|
|
KB19_P1_18 |
Main Shear South |
8.00 |
57.00 |
49.00 |
0.94 |
12.60 |
14.00 |
1.40 |
1.22 |
KB19_P1_18 |
Main Shear South |
|
|
|
|
15.89 |
21.60 |
5.71 |
2.11 |
KB19_P1_18 |
Main Shear South |
|
|
|
|
24.00 |
25.00 |
1.00 |
1.41 |
KB19_P1_18 |
Main Shear South |
|
|
|
|
44.10 |
45.65 |
1.55 |
11.60 |
KB19_P1_18 |
Main Shear South |
|
|
|
|
56.00 |
57.00 |
1.00 |
5.96 |
KB19_P1_19 |
Main Shear South |
28.50 |
34.00 |
5.50 |
0.30 |
32.00 |
33.00 |
1.00 |
0.60 |
KB19_P1_19 |
Main Shear South |
68.50 |
86.00 |
17.50 |
0.12 |
|
|
|
|
KB19_P1_19 |
Main Shear South |
90.00 |
94.00 |
4.00 |
0.14 |
|
|
|
|
KB19_P1_19 |
Main Shear South |
100.00 |
104.00 |
4.00 |
0.12 |
|
|
|
|
KB19_P1_19 |
Main Shear South |
108.00 |
112.10 |
4.10 |
0.13 |
|
|
|
|
KB19_P1_10 |
Main Shear South |
0.00 |
9.00 |
9.00 |
0.58 |
0.00 |
1.00 |
1.00 |
2.81 |
KB19_P1_10 |
Main Shear South |
|
|
|
|
8.00 |
9.00 |
1.00 |
1.47 |
KB19_P1_10 |
Main Shear South |
37.00 |
39.00 |
2.00 |
0.72 |
37.00 |
38.00 |
1.00 |
1.12 |
KB19_P1_09 |
Main Shear South |
6.50 |
26.50 |
20.00 |
0.42 |
6.50 |
9.00 |
2.50 |
2.09 |
KB19_P1_11 |
Main Shear South |
0.00 |
18.00 |
18.00 |
0.15 |
|
|
|
|
KB19_P1_11 |
Main Shear South |
37.00 |
66.00 |
29.00 |
0.30 |
37.00 |
38.00 |
1.00 |
2.02 |
KB19_P1_11 |
Main Shear South |
|
|
|
|
56.00 |
56.70 |
0.70 |
1.21 |
KB19_P1_11 |
Main Shear South |
|
|
|
|
60.90 |
62.15 |
1.25 |
1.20 |
KB19_P1_11 |
Main Shear South |
84.00 |
95.00 |
11.00 |
0.33 |
88.00 |
89.40 |
1.40 |
1.97 |
KB19_P1_11 |
Main Shear South |
126.00 |
131.00 |
5.00 |
0.38 |
128.00 |
129.00 |
1.00 |
1.46 |
KB19_P1_11 |
Main Shear South |
172.00 |
173.00 |
1.00 |
12.60 |
|
|
|
|
KB19_P1_12 |
Main Shear South |
94.00 |
103.09 |
9.09 |
0.26 |
|
|
|
|
KB19_P1_12 |
Main Shear South |
127.00 |
141.16 |
14.16 |
0.25 |
|
|
|
|
KB19_P1_12 |
Main Shear South |
157.00 |
163.00 |
6.00 |
5.34 |
158.00 |
159.05 |
1.05 |
29.70 |
KB19_P1_13 |
Main Shear South |
32.00 |
49.00 |
17.00 |
0.48 |
32.00 |
33.00 |
1.00 |
2.12 |
KB19_P1_13 |
Main Shear South |
81.00 |
98.25 |
17.25 |
0.58 |
84.00 |
85.00 |
1.00 |
1.67 |
KB19_P1_13 |
Main Shear South |
|
|
|
|
89.00 |
90.00 |
1.00 |
3.24 |
KB19_P1_13 |
Main Shear South |
|
|
|
|
93.00 |
94.25 |
1.25 |
2.16 |
KB19_P1_15 |
Main Shear South |
5.10 |
7.10 |
2.00 |
2.18 |
|
|
|
|
KB19_P1_15 |
Main Shear South |
36.00 |
46.70 |
10.70 |
0.37 |
|
|
|
|
KB19_P1_15 |
Main Shear South |
80.00 |
84.00 |
4.00 |
0.23 |
|
|
|
|
KB19_P1_15 |
Main Shear South |
90.15 |
92.16 |
2.01 |
0.67 |
90.15 |
91.06 |
0.91 |
1.05 |
KB19_P1_15 |
Main Shear South |
126.80 |
138.90 |
12.10 |
0.19 |
|
|
|
|
KB19_P1_20 |
Main Shear South |
56.00 |
78.00 |
22.00 |
0.30 |
62.25 |
63.50 |
1.25 |
1.14 |
KB19_P1_20 |
Main Shear South |
|
|
|
|
77.00 |
78.00 |
1.00 |
1.18 |
KB19_P1_20 |
Main Shear South |
114.00 |
135.00 |
21.00 |
0.47 |
120.00 |
121.00 |
1.00 |
4.08 |
KB19_P1_20 |
Main Shear South |
|
|
|
|
123.91 |
125.10 |
1.19 |
1.30 |
KB19_P1_20 |
Main Shear South |
156.00 |
191.90 |
35.90 |
0.87 |
189.00 |
190.00 |
1.00 |
26.50 |
KB19_P1_20 |
Main Shear South |
200.00 |
209.00 |
9.00 |
0.41 |
206.00 |
207.00 |
1.00 |
1.44 |
KB19_P1_22 |
Main Shear South |
4.00 |
14.00 |
10.00 |
0.09 |
|
|
|
|
KB19_P1_21 |
Main Shear South |
14.00 |
35.60 |
21.60 |
1.67 |
18.00 |
20.00 |
2.00 |
11.90 |
KB19_P1_21 |
Main Shear South |
|
|
|
|
22.10 |
23.20 |
1.10 |
7.14 |
KB19_P1_21 |
Main Shear South |
58.60 |
129.30 |
70.70 |
0.46 |
86.90 |
88.50 |
1.60 |
2.94 |
KB19_P1_21 |
Main Shear South |
|
|
|
|
88.50 |
89.50 |
1.00 |
2.78 |
KB19_P1_21 |
Main Shear South |
|
|
|
|
97.50 |
98.80 |
1.30 |
4.93 |
KB19_P1_21 |
Main Shear South |
|
|
|
|
104.30 |
105.50 |
1.20 |
1.75 |
KB19_P1_21 |
Main Shear South |
|
|
|
|
108.50 |
109.50 |
1.00 |
1.57 |
KB19_P1_21 |
Main Shear South |
|
|
|
|
112.40 |
113.40 |
1.00 |
1.20 |
KB19_P1_21 |
Main Shear South |
|
|
|
|
123.00 |
124.50 |
1.50 |
1.11 |
KB19_P1_21 |
Main Shear South |
155.00 |
157.00 |
2.00 |
0.11 |
|
|
|
|
KB19_P1_28 |
Main Shear South |
110.00 |
111.00 |
1.00 |
0.64 |
|
|
|
|
KB19_P1_28 |
Main Shear South |
117.00 |
161.10 |
44.10 |
0.40 |
123.00 |
125.50 |
2.50 |
1.32 |
KB19_P1_28 |
Main Shear South |
|
|
|
|
146.63 |
147.63 |
1.00 |
1.95 |
KB19_P1_28 |
Main Shear South |
177.10 |
194.70 |
17.60 |
0.56 |
183.10 |
184.10 |
1.00 |
2.80 |
KB19_P1_28 |
Main Shear South |
|
|
|
|
189.70 |
190.70 |
1.00 |
1.25 |
KB19_P1_28 |
Main Shear South |
|
|
|
|
193.70 |
194.70 |
1.00 |
4.13 |
KB19_P1_28 |
Main Shear South |
218.64 |
219.64 |
1.00 |
6.07 |
|
|
|
|
KB19_P1_28 |
Main Shear South |
228.67 |
230.67 |
2.00 |
0.92 |
229.67 |
230.67 |
1.00 |
1.64 |
KB19_P1_28 |
Main Shear South |
246.67 |
258.18 |
11.51 |
0.19 |
|
|
|
|
KB19_P1_23 |
Main Shear South |
28.20 |
31.80 |
3.60 |
0.38 |
|
|
|
|
KB19_P1_23 |
Main Shear South |
42.00 |
50.00 |
8.00 |
1.01 |
46.55 |
50.00 |
3.45 |
1.93 |
KB19_P1_23 |
Main Shear South |
62.75 |
64.34 |
1.59 |
0.57 |
|
|
|
|
KB19_P1_23 |
Main Shear South |
73.00 |
160.30 |
87.30 |
0.43 |
76.00 |
77.00 |
1.00 |
2.59 |
KB19_P1_23 |
Main Shear South |
|
|
|
|
81.05 |
82.75 |
1.70 |
1.57 |
KB19_P1_23 |
Main Shear South |
|
|
|
|
83.33 |
84.45 |
1.12 |
1.40 |
KB19_P1_23 |
Main Shear South |
|
|
|
|
85.45 |
86.45 |
1.00 |
1.75 |
KB19_P1_23 |
Main Shear South |
|
|
|
|
101.13 |
102.19 |
1.06 |
1.33 |
KB19_P1_23 |
Main Shear South |
|
|
|
|
105.00 |
107.00 |
2.00 |
1.35 |
KB19_P1_23 |
Main Shear South |
|
|
|
|
132.00 |
133.00 |
1.00 |
1.71 |
KB19_P1_23 |
Main Shear South |
|
|
|
|
138.65 |
139.52 |
0.87 |
1.08 |
KB19_P1_23 |
Main Shear South |
|
|
|
|
141.05 |
141.96 |
0.91 |
5.41 |
KB19_P1_23 |
Main Shear South |
|
|
|
|
149.95 |
151.00 |
1.05 |
1.44 |
KB19_P1_27 |
Main Shear South |
27.00 |
45.00 |
18.00 |
0.69 |
33.50 |
35.00 |
1.50 |
4.18 |
KB19_P1_27 |
Main Shear South |
|
|
|
|
39.00 |
40.00 |
1.00 |
1.84 |
KB19_P1_27 |
Main Shear South |
|
|
|
|
44.00 |
45.00 |
1.00 |
1.37 |
KB19_P1_27 |
Main Shear South |
56.00 |
62.40 |
6.40 |
0.32 |
|
|
|
|
KB19_P1_29 |
Main Shear South |
40.79 |
42.00 |
1.21 |
0.42 |
|
|
|
|
KB19_P1_32 |
Main Shear South |
26.00 |
36.80 |
10.80 |
0.13 |
33.00 |
33.80 |
0.80 |
0.39 |
KB19_P1_32 |
Main Shear South |
50.00 |
55.50 |
5.50 |
1.13 |
54.40 |
55.50 |
1.10 |
5.12 |
KB19_P1_24 |
Main Shear South |
0.00 |
7.00 |
4.00 |
0.28 |
6.00 |
7.00 |
1.00 |
0.56 |
KB19_P1_31 |
Main Shear South |
0.00 |
1.10 |
1.10 |
0.41 |
0.60 |
1.10 |
0.50 |
0.74 |
KB19_P1_31 |
Main Shear South |
123.79 |
129.40 |
5.61 |
2.67 |
126.79 |
129.40 |
2.61 |
5.25 |
KB19_P1_31 |
Main Shear South |
134.00 |
164.79 |
30.79 |
0.86 |
139.00 |
141.00 |
2.00 |
4.79 |
KB19_P1_31 |
Main Shear South |
|
|
|
|
142.50 |
143.60 |
1.10 |
1.34 |
KB19_P1_31 |
Main Shear South |
|
|
|
|
153.47 |
158.10 |
4.63 |
1.34 |
KB19_P1_31 |
Main Shear South |
209.90 |
214.00 |
4.10 |
0.13 |
|
|
|
|
KB19_P1_31 |
Main Shear South |
252.15 |
257.15 |
5.00 |
0.09 |
|
|
|
|
KB19_P1_31 |
Main Shear South |
265.15 |
269.81 |
4.66 |
0.24 |
|
|
|
|
KB19_P1_31 |
Main Shear South |
279.48 |
286.61 |
7.13 |
0.12 |
|
|
|
|
KB19_P1_31 |
Main Shear South |
291.72 |
292.72 |
1.00 |
3.76 |
|
|
|
|
KB19_P1_31 |
Main Shear South |
300.33 |
303.81 |
3.48 |
0.36 |
|
|
|
|
KB19_P1_33 |
Main Shear Central |
26.00 |
36.80 |
10.80 |
0.92 |
30.10 |
33.00 |
2.90 |
1.46 |
KB19_P1_33 |
Main Shear Central |
|
|
|
|
36.00 |
36.80 |
0.80 |
6.05 |
KB19_P1_33 |
Main Shear Central |
55.65 |
76.00 |
20.35 |
0.29 |
55.65 |
57.80 |
2.15 |
1.17 |
KB19_P1_33 |
Main Shear Central |
|
|
|
|
71.15 |
72.00 |
0.85 |
1.70 |
KB19_P1_33 |
Main Shear Central |
96.75 |
116.83 |
20.08 |
0.48 |
98.00 |
102.00 |
4.00 |
1.64 |
KB19_P1_33 |
Main Shear Central |
124.44 |
139.50 |
15.06 |
1.58 |
124.44 |
125.60 |
1.16 |
1.80 |
KB19_P1_33 |
Main Shear Central |
|
|
|
|
128.64 |
129.50 |
0.86 |
3.41 |
KB19_P1_33 |
Main Shear Central |
|
|
|
|
130.40 |
131.80 |
1.40 |
12.40 |
KB19_P1_33 |
Main Shear Central |
173.00 |
178.00 |
5.00 |
0.34 |
|
|
|
|
KB19_P1_33 |
Main Shear Central |
198.85 |
200.92 |
2.07 |
0.29 |
|
|
|
|
KB19_P1_33 |
Main Shear Central |
217.12 |
217.90 |
0.78 |
1.72 |
|
|
|
|
KB19_P1_34 |
Main Shear Central |
3.00 |
7.50 |
4.50 |
0.28 |
|
|
|
|
KB19_P1_34 |
Main Shear Central |
44.00 |
45.00 |
1.00 |
0.67 |
|
|
|
|
KB19_P1_34 |
Main Shear Central |
93.20 |
97.20 |
4.00 |
0.16 |
|
|
|
|
KB19_P1_35 |
Main Shear Central |
57.00 |
67.00 |
10.00 |
0.60 |
61.90 |
64.20 |
2.30 |
1.51 |
KB19_P1_35 |
Main Shear Central |
83.00 |
86.30 |
3.30 |
0.98 |
83.90 |
84.90 |
1.00 |
1.50 |
KB19_P1_36 |
Main Shear North |
4.80 |
31.80 |
27.00 |
0.72 |
8.80 |
9.80 |
1.00 |
12.30 |
KB19_P1_36 |
Main Shear North |
|
|
|
|
30.30 |
31.80 |
1.50 |
3.14 |
KB19_P1_36 |
Main Shear North |
59.80 |
64.80 |
5.00 |
0.60 |
|
|
|
|
KB19_P1_37 |
Main Shear North |
41.10 |
85.78 |
44.68 |
0.69 |
63.00 |
64.00 |
1.00 |
5.67 |
KB19_P1_37 |
Main Shear North |
|
|
|
|
70.00 |
71.00 |
1.00 |
1.97 |
KB19_P1_37 |
Main Shear North |
|
|
|
|
76.72 |
77.50 |
0.78 |
1.57 |
KB19_P1_37 |
Main Shear North |
|
|
|
|
79.42 |
82.60 |
3.18 |
4.16 |
KB19_P1_37 |
Main Shear North |
93.00 |
110.30 |
17.30 |
0.40 |
96.00 |
97.00 |
1.00 |
2.00 |
KB19_P1_37 |
Main Shear North |
|
|
|
|
107.80 |
109.30 |
1.50 |
1.77 |
KB19_P1_37 |
Main Shear North |
132.00 |
151.00 |
19.00 |
1.45 |
134.00 |
135.82 |
1.82 |
4.96 |
KB19_P1_37 |
Main Shear North |
|
|
|
|
149.70 |
151.00 |
1.30 |
13.20 |
African Gold (TSXV:AGG)
Historical Stock Chart
From Mar 2024 to Apr 2024
African Gold (TSXV:AGG)
Historical Stock Chart
From Apr 2023 to Apr 2024