UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
_______________________
FORM 8-K
CURRENT REPORT
Pursuant to Section 13 or 15(d) of the
Securities Exchange Act of 1934
Date of Report (Date of earliest event
reported): October 9, 2018
_______________________
Trilogy Metals Inc.
(Exact name of registrant as specified
in its charter)
_______________________
British Columbia |
001-35447 |
98-1006991 |
(State or other jurisdiction of incorporation) |
(Commission File Number) |
(I.R.S. Employer Identification Number) |
Suite 1150, 609 Granville Street
Vancouver, British Columbia
Canada, V7Y 1G5
(Address of principal executive offices,
including zip code)
(604) 638-8088
(Registrant’s telephone number, including
area code)
N/A
(Former name or former address, if changed
since last report)
Check the appropriate box below if the Form
8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions
(see General Instruction A.2 below):
[_] Written communications pursuant
to Rule 425 under the Securities Act (17 CFR 230.425)
[_] Soliciting material pursuant to
Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
[_] Pre-commencement communications
pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.24d-2(b))
[_] Pre-commencement
communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.23e-4(c))
Indicate by check mark whether the registrant is an emerging
growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405 of this chapter) or Rule 12b-2 of the Securities
Exchange Act of 1934 (§240.12b-2 of this chapter).
Emerging growth
company [_]
If an emerging
growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with
any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. [_]
| Item 7.01 | Regulation FD Disclosure |
On
October 9, 2018, Trilogy Metals Inc. (the “Company”) issued a press release reporting drilling results from the Bornite
Project. A copy of the press release is furnished as Exhibit 99.1 to this report.
In
accordance with General Instruction B.2 of Form 8-K, the information in this Current Report on Form 8-K, including Exhibit 99.1,
shall not be deemed to be “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended (the
“Exchange Act”), or otherwise subject to the liability of that section, and shall not be incorporated by reference
into any registration statement or other document filed under the Securities Act of 1933, as amended, or the Exchange Act, except
as shall be expressly set forth by specific reference in such filing.
| Item 9.01 | Financial Statements and Exhibits |
(d) Exhibits
SIGNATURES
Pursuant to the requirements
of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned
hereunto duly authorized.
|
TRILOGY METALS INC. |
|
|
|
Dated: October 9, 2018 |
By: |
/s/
Elaine Sanders |
|
|
Elaine Sanders, Chief Financial Officer |
Exhibit 99.1
Trilogy Metals Reports Drilling Results
from the Bornite Project
VANCOUVER, Oct. 9, 2018 /CNW/ - Trilogy
Metals Inc. (TSX/NYSE American: TMQ) ("Trilogy Metals" or the "Company") is pleased to announce
the first set of high-grade copper and cobalt assay results from this summer's exploration diamond drilling program at the Bornite
Project, a part of the Company's Upper Kobuk Mineral Projects ("UKMP") located in the Ambler mining district of Northwest
Alaska. Sample results from these four holes comprise approximately 3,871 meters from the recently completed 10,123 meter
drill campaign. All four drill holes contain copper mineralization and were designed as infill holes to the 300 to 400 meter
step-out holes drilled by the Company's previous round of drilling completed in 2017.
At a cutoff grade of 0.5% copper the results
are as follows:
- RC18-246 intersected three mineralized intervals of:
- 19.6 metres averaging 2.06% copper;
- 6.1 metres averaging 2.36% copper; and
- 7.6 metres averaging 1.04% copper.
- RC18-243 intersected one mineralized interval of:
- 2.0 metres averaging 2.23% copper.
- RC18-244 intersected one mineralized interval of:
- 20.4 metres averaging 0.83% copper.
- RC18-247 intersected two mineralized intervals of:
- 20.1 metres averaging 4.55% copper, including 16.4 meters
grading 5.34% Copper and 0.21% Cobalt (The results of this mineralized interval were disclosed in the Company's press release dated
August 23, 2018); and
- 33.4 metres averaging 0.82% copper.
Rick Van Nieuwenhuyse, President and CEO of
Trilogy Metals commented, "We continue to see narrow zones of high-grade copper and cobalt mineralization overlain by broader
zones of lower grade mineralization at Bornite. The continuity of the mineralized envelop continues to impress. With
another eight holes of results due to come out over the next several weeks, we will continue to release results as they become
available. After all results are in, we expect to complete an updated resource estimate at Bornite in the first half of next
year."
The 2018 drilling budget of $10 million for
Bornite this year was funded entirely by South32 Limited (ASX, LSE, JSE: S32; ADR: SOUHY) ("South32") and represents
the second $10 million payment under the Option Agreement with South32 and maintains the Option Agreement in good standing.
In August 2018, South32 agreed to increase its contribution to this year's Bornite drilling program by funding an additional $800,000
to the Company for an increased budget at Bornite totaling $10.8 million, which allowed the Company to expand drilling from 8,000
meters to 10,000 meters this summer. The additional funding will reduce South32's 2019 minimum exploration budget commitment
of $10 million to $9.2 million. For more information on the Option Agreement see the Company's press release on April 10,
2017 (https://Trilogy PR April 10 2017).
This year's program was comprised of 12 drill
holes totaling approximately 10,123 meters through a combination of infill and expansion drill holes in and around the known deposit.
The original drilling campaign was budgeted to be 8,000 metres but was subsequently expanded to 10,000 metres with the addition
of two more drill rigs. The 2018 program followed up on drilling completed during the 2017 exploration program which was one of
the larger programs in the history of drilling at the Bornite Project. During 2017, the Company drilled nine diamond drill holes
comprising 8,437 metres to test the extension of the of the currently defined resource†.
Trilogy Metals has recently completed its summer
exploration drilling program at Bornite and geotechnical activities at its Arctic Project. Additional drill results are anticipated
to be released regularly over the next couple of months as they become available. The objective of the 2018 drill campaign
is to infill and expand the currently defined open pit and underground mineral resources.
Results are presented in Table 1 at a
cutoff grade of 0.5% copper to be comparable with previous drill results released by the Company. All the intersected widths
are normal to stratigraphy and therefore can be considered to be true widths. Results at a more selective higher-grade cutoff of
1.5% copper are also presented in Table 2 to show locally higher-grade intervals. Table 3 shows drill hole locations.
Figure 1 shows the location of the drill holes on a plan map and Figure 2 shows a cross-section through drill hole
RC18-0246.
Table 1 - 0.5% Cu cut-off with maximum 3
m internal waste – Minimum 1.5 m interval
|
|
|
|
|
|
Hole |
From (m) |
To (m) |
Length (m) |
Cu (%) |
Co (%) |
RC18-0243 |
479.56 |
483.11 |
3.55 |
0.65 |
0.02 |
548.16 |
550.18 |
2.02 |
2.23 |
0.01 |
715.77 |
717.65 |
1.88 |
0.60 |
0.01 |
851.63 |
853.63 |
2.00 |
0.53 |
0.02 |
RC18-0244 |
603.92 |
624.32 |
20.40 |
0.83 |
0.02 |
713.20 |
715.80 |
2.60 |
0.74 |
0.01 |
726.57 |
735.11 |
8.54 |
0.47 |
0.01 |
741.11 |
743.66 |
2.55 |
0.93 |
0.00 |
782.50 |
786.06 |
3.56 |
0.66 |
0.01 |
RC18-0246 |
664.16 |
666.23 |
2.07 |
0.90 |
0.02 |
699.06 |
718.64 |
19.58 |
2.06 |
0.01 |
723.80 |
725.66 |
1.86 |
0.52 |
0.01 |
731.23 |
738.49 |
7.26 |
0.76 |
0.00 |
750.33 |
756.40 |
6.07 |
2.36 |
0.02 |
763.50 |
766.33 |
2.83 |
0.88 |
0.00 |
776.93 |
784.56 |
7.63 |
1.04 |
0.02 |
790.42 |
792.82 |
2.40 |
0.55 |
0.01 |
838.75 |
840.34 |
1.59 |
0.62 |
0.00 |
RC18-0247 |
731.27 |
764.67 |
33.40 |
0.82 |
0.01 |
789.30* |
809.40* |
20.10 |
4.55 |
0.17 |
* Results for this interval were previously released on August 23, 2018 |
Table 2 - 1.5% Cu cut-off with maximum 3
m internal waste – Minimum 1.5 m interval
|
|
|
|
|
|
Hole |
From (m) |
To (m) |
Length (m) |
Cu (%) |
Co (%) |
RC18-0243 |
548.16 |
550.18 |
2.02 |
2.23 |
0.01 |
RC18-0246 |
703.70 |
713.09 |
9.39 |
3.45 |
0.01 |
751.95 |
756.40 |
4.45 |
2.78 |
0.02 |
RC18-0247 |
791.87* |
808.27* |
16.40 |
5.34 |
0.21 |
* Results for this interval were previously released on August 23, 2018 |
Table 3 – Bornite Drill Hole Locations
|
|
|
|
|
|
|
East (m) |
North (m) |
Elevation (m) |
Azimuth |
Dip |
RC18-0243 |
590217 |
7440723 |
258 |
206 |
-80 |
RC18-0244 |
590187 |
7440902 |
270 |
206 |
-80 |
RC18-0246 |
590875 |
7440488 |
350 |
220 |
-72 |
RC18-0247 |
590537 |
7440676 |
318 |
206 |
-80 |
Figure
1- Map Showing Location of 2018 Drilling Program (CNW Group/Trilogy Metals Inc.)
Figure
2 – Cross Section of Bornite Drilling Showing RC18-246 Results (CNW Group/Trilogy Metals Inc.)
Mineralization within the Bornite deposit occurs
as a series of "Reefs" hosted by both the Upper and Lower Bornite Carbonate sequences separated by generally unmineralized
phyllite units. The Cu-Co mineralization at Bornite occurs in three distinct carbonate zones, the Upper Reef, the Lower Reef, and
the South Reef. All three zones were drill tested this year.
Mineralization is typically observed as breccia
matrix replacement and is generally dominated by chalcopyrite and sometimes by bornite with chalcocite – particularly in
the higher-grade zones. Mineralization can also be observed as vein and replacement zones containing chalcopyrite and calcite/dolomite
gangue. These styles of mineralization were observed in all holes mentioned in this press release with bornite, chalcocite
mineralization observed in RC18-0247, RC18-0246, and minorly within RC18-0244; and chalcopyrite dominating mineralization observed
in RC18-0243.
Bornite Resource
The resource estimate utilized assay data from
drill holes completed by the Company between 2011 and 2013 and re-sampled historic holes Kennecott drilled in the 1960s and 1970s.
On June 5th, 2018 the Company announced an updated resource estimate for the Bornite project of 5.5 Billion pounds of
copper inferred resource at a grade of 1.74% Cu and 913 Million pounds of copper indicated resource at a grade of 1.02% Cu and
total Inferred Cobalt resources (in-pit and below-pit) of 182.4 million tonnes grading 0.019% Co for 77 million pounds of contained
cobalt. Trilogy Metals filed a National Instrument 43-101 technical report in July 2018. See the Bornite Technical Report
as well as the Company's press releases dated June 5, 2018 (https://Trilogy PR June 5 2018) and the Company's press release on
the filing of the updated NI43-101 Technical Report for Bornite on July 20, 2018 (https://Trilogy PR July 20 2018).
QA/QC Program
The drill program, sampling protocol and data
verification were managed by qualified persons employed by the Company. Diamond drill holes were typically collared at PQ or HQ
diameter drill core and reduced to HQ and NQ diameter during the drilling process. Samples were collected using a 0.2-metre minimum
length, 2.5-metre maximum length and 1.8-metre average sample length. Drill core recovery averaged 87% overall and 94% within the
prospective lithologies. Three quality control samples (one blank, one standard and one duplicate) were inserted into each batch
of 20 samples. The drill core was sawn, with half sent to ALS Minerals in Fairbanks for sample preparation and the sample pulps
forwarded to ALS's North Vancouver facility for analysis. ALS Minerals in North Vancouver, B.C., Canada, is a facility certified
as ISO 9001:2008 and accredited to ISO / IEC 17025:2005 from the Standards Council of Canada. The Company will submit 5% of the
assay intervals from prospective lithologies to an independent check assay lab.
Qualified Persons
Andrew W. West, Certified Professional Geologist,
Exploration Manager for Trilogy Metals Inc., is a Qualified Person as defined by National Instrument 43-101. Mr. West has reviewed
the technical information in this news release and approves the disclosure contained herein.
About Trilogy Metals
Trilogy Metals Inc. is a metals exploration
and development company focused on exploring and developing the Ambler mining district located in northwestern Alaska. It is one
of the richest and most-prospective known copper-dominant districts located in one of the safest geopolitical jurisdictions in
the world. It hosts world-class polymetallic volcanogenic massive sulphide ("VMS") deposits that contain copper, zinc,
lead, gold and silver, and carbonate replacement deposits which have been found to host high-grade copper and cobalt mineralization.
Exploration efforts have been focused on two deposits in the Ambler mining district - the Arctic VMS deposit and the Bornite carbonate
replacement deposit. Both deposits are located within the Company's land package that spans approximately 143,000 hectares. The
Company has an agreement with NANA Regional Corporation, Inc., a Regional Alaska Native Corporation that provides a framework for
the exploration and potential development of the Ambler mining district in cooperation with local communities. Our vision is to
develop the Ambler mining district into a premier North American copper producer.
Cautionary Note Regarding Forward-Looking
Statements
This press release includes certain "forward-looking
information" and "forward-looking statements" (collectively "forward-looking statements") within the meaning
of applicable Canadian and United States securities legislation including the United States Private Securities Litigation Reform
Act of 1995. All statements, other than statements of historical fact, included herein, including, without limitation, further
drilling activity, the potential advancement of the AMDIAP, the timing and the filing of updated reports on the Company's projects,
the future price of copper, the estimation of mineral reserves and mineral resources, the realization of mineral reserve and mineral
resource estimates, the timing and amount of estimated future production, costs of production, capital expenditures, costs and
timing of the development of projects, the likelihood and timing of the AMDIAP, the potential future development of Bornite, the
future operating or financial performance of the Company, planned expenditures and the anticipated activity at the UKMP Projects,
are forward-looking statements. The assay results from drill hole RC18-0247 should not be considered representative of other drilling
results for the 2018 drilling campaign. Forward-looking statements are frequently, but not always, identified by words such as
"expects", "anticipates", "believes", "intends", "estimates", "potential",
"possible", and similar expressions, or statements that events, conditions, or results "will", "may",
"could", or "should" occur or be achieved. These forward-looking statements may include statements regarding
perceived merit of properties; exploration plans and budgets; mineral reserves and resource estimates; work programs; capital expenditures;
timelines; strategic plans; market prices for precious and base metals; or other statements that are not statements of fact. Forward-looking
statements involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and
actual results and future events could differ materially from those anticipated in such statements. Important factors that could
cause actual results to differ materially from the Company's expectations include the uncertainties involving success of exploration,
development and mining activities, permitting timelines, requirements for additional capital, government regulation of mining operations,
environmental risks, unanticipated reclamation expenses; mineral reserve and resource estimates and the assumptions upon which
they are based; assumptions and discount rates being appropriately applied to the PFS; our assumptions with respect to the likelihood
and timing of the AMDIAP; capital estimates; prices for energy inputs, labour, materials, supplies and services the interpretation
of drill results, the need for additional financing to explore and develop properties and availability of financing in the debt
and capital markets; uncertainties involved in the interpretation of drilling results and geological tests and the estimation of
reserves and resources; the need for cooperation of government agencies and native groups in the development and operation of properties
as well as the construction of the access road; the need to obtain permits and governmental approvals; risks of construction and
mining projects such as accidents, equipment breakdowns, bad weather, non-compliance with environmental and permit requirements,
unanticipated variation in geological structures, metal grades or recovery rates; unexpected cost increases, which could include
significant increases in estimated capital and operating costs; fluctuations in metal prices and currency exchange rates; and other
risks and uncertainties disclosed in the Company's Annual Report on Form 10-K for the year ended November 30, 2017 filed with Canadian
securities regulatory authorities and with the United States Securities and Exchange Commission and in other Company reports and
documents filed with applicable securities regulatory authorities from time to time. The Company's forward-looking statements reflect
the beliefs, opinions and projections on the date the statements are made. The Company assumes no obligation to update the forward-looking
statements or beliefs, opinions, projections, or other factors, should they change, except as required by law.
Cautionary Note to United States Investors
This press release has been prepared in
accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of U.S. securities
laws. Unless otherwise indicated, all resource and reserve estimates included in this press release have been prepared in accordance
with Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and the Canadian
Institute of Mining, Metallurgy and Petroleum (CIM)—CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted
by the CIM Council, as amended ("CIM Definition Standards"). NI 43-101 is a rule developed by the Canadian Securities
Administrators which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning
mineral projects. Canadian standards, including NI 43-101, differ significantly from the requirements of the United States Securities
and Exchange Commission (SEC), and resource and reserve information contained herein may not be comparable to similar information
disclosed by U.S. companies. In particular, and without limiting the generality of the foregoing, the term "resource"
does not equate to the term "reserves". Under U.S. standards, mineralization may not be classified as a "reserve"
unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time
the reserve determination is made. The SEC's disclosure standards normally do not permit the inclusion of information concerning
"measured mineral resources", "indicated mineral resources" or "inferred mineral resources" or other
descriptions of the amount of mineralization in mineral deposits that do not constitute "reserves" by U.S. standards
in documents filed with the SEC. Investors are cautioned not to assume that all or any part of "measured" or "indicated
resources" will ever be converted into "reserves". Investors should also understand that "inferred mineral
resources" have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility.
Under Canadian rules, estimated "inferred mineral resources" may not form the basis of feasibility or pre-feasibility
studies except in rare cases. Disclosure of "contained ounces" in a resource is permitted disclosure under Canadian regulations;
however, the SEC normally only permits issuers to report mineralization that does not constitute "reserves" by SEC standards
as in-place tonnage and grade without reference to unit measures. The requirements of NI 43-101 for identification of "reserves"
are also not the same as those of the SEC, and reserves reported by Trilogy Metals in compliance with NI 43-101 may not qualify
as "reserves" under SEC standards. Arctic does not have known reserves, as defined under SEC Industry Guide 7.
Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies
that report in accordance with U.S. standards.
† |
See the latest resource statement in the report titled "NI 43-101 Technical Report on the Bornite Project, Northwest Alaska, USA" released on July 20, 2018 with an effective date of June 5, 2018 (the "Bornite Technical Report") on the Company's website at www.trilogymetals.com and on the Company's profile at www.sedar.com and www.sec.gov. |
View original content to download multimedia:http://www.prnewswire.com/news-releases/trilogy-metals-reports-drilling-results-from-the-bornite-project-300726670.html
SOURCE Trilogy Metals Inc.
View original content to download multimedia:
http://www.newswire.ca/en/releases/archive/October2018/09/c1161.html
%CIK: 0001543418
For further information: Company Contact: Patrick Donnelly,
Vice President, Corporate Communications & Development, patrick.donnelly@trilogymetals.com, 604-630-3569; 604-638-8088 or 1-855-638-8088
CO: Trilogy Metals Inc.
CNW 06:30e 09-OCT-18
This regulatory filing also includes additional resources:
ex991.pdf
Trilogy Metals (AMEX:TMQ)
Historical Stock Chart
From Mar 2024 to Apr 2024
Trilogy Metals (AMEX:TMQ)
Historical Stock Chart
From Apr 2023 to Apr 2024