VANCOUVER, May 7, 2018 /CNW/ - Leagold Mining Corporation (TSX:LMC; OTCQX:LMCNF) ("Leagold" or the "Company") reports drilling results for the Los Filos Underground mine in Mexico. Highlights are from the Nukay, Conchita and Creston Rojo deposits and include 24.2 grams per tonne ("gpt") over 4.10 metres; 23.6 gpt over 6.95 metres; and 9.1 gpt over 8.69 metres respectively (all capped grades and true widths; see Table 1).

Leagold Mining Corporation (CNW Group/Leagold Mining Corporation)

Los Filos currently operates two open pit mines, Los Filos and Bermejal, and one underground mine at Los Filos. The Los Filos Underground mine provides high grade (5 to 8 g/t Au) ore at a mining rate of 1,500 tonnes of ore per day.

The Los Filos Underground mine is comprised of two sectors: the Norte Mine and the Sur Mine. Drilling in the Norte Mine shows extensions to the Nukay deposit at depth and on the eastern side. In the Sur Mine, the drilling has identified additional mineralization as extensions to the Zona 70 and Creston Rojo deposits.

The objective of the Los Filos Underground mine drilling program is to identify additional resources to replace reserves and extend the overall mine life. The program is on track with over 12,000 metres of step-out drilling completed to date and the majority of the exploration drilling to take place in the second half of this year. Drilling of a total of 62,000 metres is planned for 2018 and is focused on several deposits along the contact of the circular intrusive bodies. All of the holes that have been completed in this program intersected oxide skarn mineralization at the contact of the intrusive. A total of 52 intercepts were encountered in 32 holes. The drill holes reported in this news release will be incorporated into a final resource estimate for year-end reporting.

Table 1: Drill Program Highlights for Los Filos Underground Mine

Sector

Zone

Hole ID

Zone

From
(m)

To
(m)

Length
(m)

True
Width
(m)

Grade
(g/t Au)

Capped
(g/t Au)

Norte

Nukay

UNK-01-18

RAM

5.05

8.85

3.80

3.79

3.07




and

CON

29.15

32.60

3.45

3.44

4.51


Norte

Nukay

UNK-02-18

RAM

4.85

10.25

5.40

5.38

9.40




and

CON

33.95

38.55

4.60

4.58

6.23


Norte

Nukay

UNK-04-18

CON

151.80

155.55

3.75

2.87

4.05


Norte

Nukay

UNK-05-18

RAM

61.00

68.10

7.10

5.44

5.06




and

RAM

75.35

79.85

4.50

3.45

5.81




and

RAM

87.65

93.00

5.35

4.10

27.44

24.19



and

RAM

102.10

107.90

5.80

4.44

4.89


Norte

Nukay

UNK-07-18

CON

130.60

131.45

0.85

0.80

54.80

40.00



and

RAM

139.65

143.35

3.70

3.48

4.57


Norte

Nukay

UNK-08-18

RAM

122.30

125.85

3.55

2.72

8.18




and

RAM

132.60

133.95

1.35

1.03

21.50


Norte

Nukay

UNK-11-18

RAM

140.00

144.05

4.05

3.51

4.77




and

CON

194.10

204.20

10.10

8.75

8.94

8.01



including

CON

194.10

196.65

2.55

2.21

4.88




including

CON

198.25

201.30

3.05

2.64

22.81

19.71

Norte

Nukay

UNK-12-18

CON

94.55

104.70

10.15

9.54

9.71


Norte

Nukay

UNK-13-18

CON

107.75

122.10

14.35

10.99

4.38




including

CON

107.75

110.75

3.00

2.60

8.25




including

CON

116.90

122.10

5.20

4.50

5.44




and

CON

138.25

141.25

3.00

2.60

13.28


Norte

Peninsular

UP-01-18

CON

92.60

94.45

1.85

1.82

11.87


Norte

Peninsular

UP-03-18

RAM

70.95

71.95

1.00

0.98

24.10


Norte

Peninsular

UP-04-18

RAM

57.35

59.30

1.95

1.49

14.70


Norte

Conchita

LC-01-18

RAM

99.45

106.65

7.20

6.95

31.48

23.64



and

RAM

113.35

115.60

2.25

2.17

8.07




and

RAM

124.45

132.00

7.55

7.29

5.85




including

RAM

127.30

132.00

4.70

4.54

7.49


Norte

Conchita

LC-03-18

RAM

135.45

138.00

2.55

2.21

29.59

23.85



and

CON

152.55

163.90

11.35

9.83

6.40




and

CON

170.85

174.60

3.75

3.25

3.75




and

RAM

187.50

194.00

6.50

5.63

4.77


Norte

Conchita

LC-05-18

CON

117.00

120.95

3.95

3.71

4.55




and

CON

123.40

126.50

3.10

2.91

4.40




and

RAM

141.20

142.50

1.30

1.22

26.40


Sur

Creston Rojo

US-01-18

CON

24.05

27.20

3.15

3.14

6.86


Sur

Creston Rojo

US-02-18

CON

26.30

34.65

8.35

7.57

9.21




including

CON

26.30

28.65

2.35

2.13

16.75




including

CON

32.25

34.65

2.40

2.18

10.20


Sur

Creston Rojo

US-04-18

CON

24.10

26.55

2.45

2.45

3.81


Sur

Creston Rojo

US-09-18

RAM

37.65

39.10

1.45

1.40

21.00


Sur

Creston Rojo

US-11-18

CON

115.20

117.75

2.55

2.09

7.95


Sur

Creston Rojo

US-14-18

CON

59.00

60.80

1.80

1.38

10.60


Sur

Creston Rojo

US-19-18

CON

62.75

65.05

2.30

1.76

5.83


Sur

Creston Rojo

US-20-18

CON

34.00

36.65

2.65

2.64

11.18




and

CON

40.95

43.10

2.15

2.14

16.41


Sur

Creston Rojo

CRZ-182-17

CON

333.40

336.20

2.80

2.29

8.18


Sur

Creston Rojo

CRZ-183-18

CON

159.60

162.20

2.60

2.44

9.31


Sur

Creston Rojo

CRZ-185-18

CON

179.80

184.45

4.65

4.37

11.30


Sur

Creston Rojo

CRZ-187-18

CON

81.55

82.90

1.35

1.27

10.75




and

CON

199.65

207.65

8.00

7.52

6.48




Including

CON

199.65

202.75

3.10

2.91

14.03


Sur

Creston Rojo

CRZ-189-18

CON

266.15

275.40

9.25

8.69

9.07




and

CON

284.30

285.35

1.05

0.99

10.90


Sur

Creston Rojo

CRZ-191-18

RAM

180.35

182.80

2.45

2.37

5.42


Sur

Creston Rojo

CRZ-193-18

RAM

206.05

211.60

5.55

4.81

5.02


Sur

Creston Rojo

CRZ-194-18

CON

132.00

138.90

6.90

6.48

9.85




including

CON

132.00

136.05

4.05

3.81

14.47




and

RAM

146.05

147.20

1.15

1.08

11.15


Sur

Creston Rojo

CRZ-195-18

CON

214.55

224.20

9.65

9.07

3.31




including

COM

220.30

224.20

3.90

3.66

4.46



NOTES:

Intervals in bold are mentioned in the text of the news release

CON = oxide mineralization at the intrusive contact; RAM= mineralization in a separate zone that is away from the contact

Only Intercepts with over 3 gpt when diluted to a minimum true width of 3 metres are shown

Individual assays within the intercepts were capped using 40 g/t limit

 

Qualified Persons

Doug Reddy, P.Geo, Leagold's Senior Vice President – Technical Services, is a Qualified Person under NI 43-101, and has reviewed and approved the technical contents of this news release on behalf of Leagold.

The Los Filos mine employs industry standard drilling and sampling procedures. All exploration samples are sent to an ALS Global facility in Guadalajara for preparation and in Vancouver for analyses by fire assay and ICP - OES (Inductively Coupled Plasma optical emission spectrometry). A full quality control and assurance program and protocols are in place and are aligned with best practices including regular insertion of certified reference standards, blanks, and duplicates.

About Leagold Mining Corporation

Leagold is building a mid-tier gold producer with a focus on opportunities in Latin America. The Company is based in Vancouver, Canada and owns 100% of the Los Filos mine in Mexico. Leagold is listed on the TSX under the trading symbol "LMC" and trades on the OTCQX market as "LMCNF".

This news release contains "forward-looking statements" and "forward looking information" (as defined under applicable securities laws), including but not limited to plans for future development of and drilling at the Los Filos Mine and plans for a final resource estimate. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "expects", "expected", "budgeted", "forecasts" and "anticipates". Forward-looking statements and information, while based on management's best estimates and assumptions, are subject to risks and uncertainties that may cause actual results to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to the Los Filos Mine, risks related to the successful integration of the acquisition; risks related to international operations; risks related to general economic conditions and credit availability, actual results of current exploration activities, unanticipated reclamation expenses; changes in project parameters as plans continue to be refined; fluctuations in prices of metals including gold; fluctuations in foreign currency exchange rates, increases in market prices of mining consumables, possible variations in ore reserves, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes, title disputes, claims and limitations on insurance coverage and other risks of the mining industry; delays in the completion of development or construction activities, changes in national and local government regulation of mining operations, tax rules and regulations, and political and economic developments in countries in which Leagold operates. Although Leagold has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking statements and forward-looking information are made as of the date hereof and Leagold disclaims any obligation to update any such factors or to publicly announce the result of any revisions to any of the forward-looking statements or forward-looking information contained herein to reflect future results. Accordingly, readers should not place undue reliance on forward-looking statements and information. Please refer to Leagold's most recent filings under its profile at www.sedar.com for further information respecting the risks affecting Leagold and its business.

SOURCE Leagold Mining Corporation

Copyright 2018 Canada NewsWire