POR SOLICITACAO DO PARTICIPANTE, O LIMITE DE BAIXA/ALTA DO TUNEL DE HARD FOI ALTERADO DE %100 PARA -70%.

BY THE REQUEST OF THE PARTICIPANT, THE LOW/TOP OF THE HARD LIMIT TUNNEL %100 CHANGED TO %-70%.

AZEVEDO (BOV:AZEV11F)
Historical Stock Chart
From Aug 2024 to Sep 2024 Click Here for more AZEVEDO Charts.
AZEVEDO (BOV:AZEV11F)
Historical Stock Chart
From Sep 2023 to Sep 2024 Click Here for more AZEVEDO Charts.