UNITED
STATES
SECURITIES
AND EXCHANGE COMMISSION
Washington,
D.C. 20549
Form
6-K
REPORT
OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of July 2016.
Commission File Number 001-31722
New
Gold Inc.
Suite 1800 – 555 Burrard Street
Vancouver, British Columbia V7XC 1M9
Canada
(Address of principal executive office)
Indicate
by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F
☐ Form 40-F ☒
Indicate
by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ☐
Note:
Regulation S-T Rule 101(b)(1) only permits the submission in paper of a Form 6-K if submitted solely to provide an attached annual
report to security holders.
Indicate
by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ☐
Note:
Regulation S-T Rule 101(b)(7) only permits the submission in paper of a Form 6-K if submitted to furnish a report or other
document that the registrant foreign private issuer must furnish and make public under the laws of the jurisdiction in which the
registrant is incorporated, domiciled or legally organized (the registrant’s “home country”), or under the rules
of the home country exchange on which the registrant’s securities are traded, as long as the report or other document is
not a press release, is not required to be and has not been distributed to the registrant’s security holders, and, if discussing
a material event, has already been the subject of a Form 6-K submission or other Commission filing on EDGAR.
DOCUMENTS
FILED AS PART OF THIS FORM 6-K
Exhibit |
|
Description |
99.1 |
|
News Release Dated July 27, 2016 - New Gold Delivers Higher 2016 Second Quarter Cash Flow and Significantly Lowers Full-Year Cost Guidance |
|
|
|
SIGNATURES
Pursuant
to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf
by the undersigned, thereunto duly authorized.
|
|
|
NEW GOLD INC. |
|
|
|
|
|
|
By: |
/s/
Lisa Damiani |
|
Date: July
27, 2016 |
|
|
Lisa Damiani
Vice President, General Counsel
and Corporate Secretary
|
Exhibit 99.1
New Gold Delivers Higher 2016 Second Quarter Cash Flow and Significantly
Lowers Full-Year Cost Guidance
(All dollar figures are in US dollars unless otherwise indicated)
TORONTO, July 27, 2016 /CNW/ - New Gold Inc. ("New Gold")
(TSX:NGD) (NYSE MKT:NGD) today announces its 2016 second quarter results and provides an update on the construction of the company's
Rainy River project.
2016 SECOND QUARTER HIGHLIGHTS
| · | Gold production of 99,423 ounces increased by 15%
relative to 2015 and copper production of 25.7 million pounds increased by 9% |
| · | All-in sustaining costs(1) decreased to
$717 per ounce, including total cash costs(2) of $334 per ounce |
| · | All four operations generated free cash flow during
the quarter |
| · | Cash generated from operations before changes in non-cash
operating working capital(3) of $82 million, a 31% increase compared to 2015 |
| · | Cash generated from operations of $79 million, a 39%
increase from 2015 |
| · | Adjusted net earnings(4) of $14 million,
or $0.03 per share, relative to an adjusted net loss of $1 million, or nil per share, in 2015 |
| · | Net loss of $9 million, or $0.02 per share, compared
to net earnings of $9 million, or $0.02 per share, in 2015 |
| · | Rainy River construction approximately 40% complete
at June 30, 2016 with $107 million in capital expenditures during the quarter |
| · | June 30, 2016 cash and equivalents of $220 million |
"We are proud to have delivered such strong second quarter
results," stated Randall Oliphant, Executive Chairman. "The combination of higher production, lower costs and improved gold
prices enabled us to generate a 39% increase in our cash flow. We are on track to meet our full-year gold production guidance and
pleased to be in a position to lower our cost guidance. We look forward to a strong finish to the year."
"At the same time, our Rainy River project is moving
ever closer to production. The construction of the processing facilities and initial mining activities are both going very well
and we are making good progress in resolving the challenge we encountered earlier this year related to the ground conditions at
the water and tailings management facilities," added Mr. Oliphant.
CONSOLIDATED YEAR-TO-DATE OPERATIONAL RESULTS AND 2016
GUIDANCE
Consistent with the expectations the company outlined as part
of its first quarter results, gold production increased quarter over quarter, resulting in consolidated gold production of 190,234
ounces in the first six months of 2016 which was 5% higher than the same period of the prior year. As a result of the company's
strong first half production, New Gold is well positioned to meet its full-year gold production guidance of 360,000 to 400,000
ounces. At the same time, the company's first half copper production of 51.1 million pounds was higher than planned, increasing
by 10% relative to the prior-year period, and New Gold now anticipates it will exceed the high end of its full-year copper production
guidance of 81.0 to 93.0 million pounds. Consolidated full-year silver production is expected to be at, or slightly below, the
low end of the guidance range of 1.6 to 1.8 million ounces.
For the six-month period ended June 30, 2016, New Gold's all-in
sustaining costs of $736 per ounce and total cash costs of $343 per ounce were both well below the prior year and are tracking
below the company's 2016 cost guidance. The $233 per ounce decrease in all-in sustaining costs relative to the first half of 2015
was attributable to the combination of a $106 per ounce decrease in total cash costs and a $125 per ounce, or $20 million, decrease
in the company's consolidated sustaining costs(1), which include New Gold's cumulative sustaining capital, exploration,
general and administrative, and amortization of reclamation expenditures.
Based on New Gold's first half operating results, and assuming
current commodity prices and foreign exchange rates, the company now expects its 2016 full-year total cash costs to be $360 to
$400 per ounce, a $75 per ounce reduction from the company's original guidance range of $435 to $475 per ounce. As total cash costs
form a component of all-in sustaining costs, New Gold similarly expects a $75 per ounce reduction from its 2016 full-year all-in
sustaining costs to approximately $750 to $790 per ounce as compared to the company's original guidance range of $825 to $865 per
ounce.
NEW GOLD SUMMARY OPERATIONAL RESULTS |
|
|
|
|
|
|
|
|
|
Three months ended June 30 |
Six months ended June 30 |
|
2016 |
2015 |
2016 |
2015 |
|
|
|
|
|
GOLD PRODUCTION (thousand ounces) |
|
|
|
|
New Afton |
25.3 |
24.4 |
50.4 |
48.3 |
Mesquite |
25.6 |
22.5 |
52.9 |
48.2 |
Peak Mines |
31.3 |
14.9 |
50.9 |
34.3 |
Cerro San Pedro |
17.3 |
24.7 |
36.1 |
50.6 |
Total Gold Production |
99.4 |
86.4 |
190.2 |
181.4 |
|
|
|
|
|
|
|
|
|
|
Total Gold Sales (thousand ounces) |
101.8 |
87.8 |
187.9 |
180.2 |
Average Realized Gold Price per ounce(5) |
$1,267 |
$1,191 |
$1,239 |
$1,210 |
|
|
|
|
|
COPPER PRODUCTION (million pounds) |
|
|
|
|
New Afton |
22.1 |
19.9 |
44.5 |
39.5 |
Peak Mines |
3.6 |
3.7 |
6.6 |
7.1 |
Total Copper Production |
25.7 |
23.6 |
51.1 |
46.6 |
|
|
|
|
|
|
|
|
|
|
Total Copper Sales (million pounds) |
25.2 |
23.7 |
50.4 |
45.8 |
Average Realized Copper Price per pound(5) |
$2.14 |
$2.72 |
$2.14 |
$2.66 |
|
|
|
|
|
SILVER PRODUCTION (million ounces) |
|
|
|
|
New Afton |
0.1 |
0.1 |
0.1 |
0.1 |
Cerro San Pedro |
0.2 |
0.3 |
0.5 |
0.6 |
Total Silver Production |
0.3 |
0.4 |
0.7 |
0.8 |
|
|
|
|
|
|
|
|
|
|
Total Silver Sales (million ounces) |
0.3 |
0.4 |
0.7 |
0.8 |
Average Realized Silver Price per ounce(5) |
$17.39 |
$16.23 |
$15.96 |
$16.41 |
|
|
|
|
|
TOTAL CASH COSTS(2)($ per ounce) |
|
|
|
|
New Afton |
($547) |
($940) |
($593) |
($889) |
Mesquite |
611 |
839 |
618 |
867 |
Peak Mines |
521 |
1,157 |
620 |
974 |
Cerro San Pedro |
898 |
879 |
917 |
944 |
Total Cash Costs(2) |
$334 |
$410 |
$343 |
$449 |
|
|
|
|
|
|
|
|
|
|
All-IN SUSTAINING COSTS(1)($ per ounce) |
|
|
|
|
New Afton |
($131) |
($235) |
($198) |
($295) |
Mesquite |
999 |
1,533 |
1,044 |
1,632 |
Peak Mines |
706 |
1,549 |
827 |
1,337 |
Cerro San Pedro |
941 |
889 |
947 |
955 |
All-in Sustaining Costs(1) |
$717 |
$922 |
$736 |
$969 |
|
|
|
|
|
|
|
|
|
|
2016 SECOND QUARTER CONSOLIDATED OPERATIONAL RESULTS
New Gold's second quarter gold production increased by 15%
to 99,423 ounces when compared to the prior-year quarter. The increase in quarterly gold production was attributable to New Afton,
Mesquite and the Peak Mines all delivering higher production. This was only partially offset by planned lower production from Cerro
San Pedro as the mine was in its final months of active mining. Quarterly copper production also increased by 9% to 25.7 million
pounds when compared to the second quarter of 2015. Silver production of 0.3 million ounces remained in line with 2015.
During the second quarter, all four of New Gold's operations
delivered production at all-in sustaining costs below $1,000 per ounce. As a result of this strong performance, consolidated second
quarter all-in sustaining costs of $717 per ounce decreased by $205 per ounce relative to the second quarter of 2015. The significant
decrease in all-in sustaining costs relative to the prior-year quarter was attributable to the combination of a $76 per ounce decrease
in total cash costs to $334 per ounce and a $129 per ounce, or $6 million, decrease in the company's consolidated sustaining costs.
The decrease in total cash costs was driven by the combined benefit of higher gold production, the depreciation of the Canadian
and Australian dollars and New Gold's business improvement initiatives more than offsetting the impact of lower by-product revenues
resulting from lower realized copper prices(5).
New Afton
Gold production at New Afton during the second quarter increased
to 25,287 ounces. The increase relative to the prior-year quarter was due to a 16% increase in mill throughput which more than
offset a planned decrease in gold grade. Gold recoveries remained consistent at 83% despite the significant increase in throughput.
New Afton's average mill throughput during the second quarter was 15,320 tonnes per day.
As a result of the continued strong throughput, New Afton's
quarterly copper production increased by 11% to 22.1 million pounds when compared to the second quarter of 2015.
The $104 per ounce increase in New Afton's all-in sustaining
costs to ($131) per ounce was attributable to the impact of lower by-product revenues only being partially offset by the combined
benefit of higher gold production, the depreciation of the Canadian dollar relative to the U.S. dollar and a $6 million decrease
in sustaining costs. New Afton's second quarter total cash costs of ($547) per ounce were impacted by a $6 million, or $406 per
ounce, decrease in by-product revenues relative to the prior-year quarter as the benefit of higher copper sales volumes was more
than offset by the decrease in the realized price. As a result of the depreciation of the Canadian dollar relative to the U.S.
dollar, the mine's operating costs, including mining, processing and general and administrative costs, decreased to $17.33 per
tonne in the second quarter relative to $18.82 per tonne in the prior-year quarter.
New Afton's second quarter co-product cash costs were $543
per ounce of gold and $0.91 per pound of copper relative to $466 per ounce and $1.06 per pound in the prior-year quarter. The mine's
second quarter co-product all-in sustaining costs were $711 per ounce of gold and $1.19 per pound of copper relative to the prior-year
quarterly all-in sustaining costs of $708 per ounce and $1.61 per pound.
For the six-month period ended June 30, 2016, New Afton's
gold production increased to 50,355 ounces when compared to the same period of the prior year. The increase in production was attributable
to the combination of higher throughput and recovery more than offsetting a planned decrease in gold grade.
Similarly, the mine's first half copper production increased
by 13%, or 5.0 million pounds, to 44.5 million pounds primarily as a result of a 15% increase in mill throughput.
For the six-month period ended June 30, 2016, New Afton's
all-in sustaining costs increased by $97 per ounce to ($198) per ounce despite an $8 million, or $348 per ounce, decrease in by-product
revenues relative to the first half of 2015 as a result of the decrease in the realized copper price. New Afton's first half sustaining
costs decreased by $8 million to $20 million when compared to the first six months of 2015.
New Afton's first half co-product cash costs were $516 per
ounce of gold and $0.89 per pound of copper relative to $480 per ounce and $1.04 per pound in the prior-year period. The mine's
first half co-product all-in sustaining costs of $672 per ounce of gold and $1.16 per pound of copper were below the costs in the
same prior-year period of $689 per ounce and $1.49 per pound.
Mesquite
Second quarter gold production at Mesquite increased by 14%
to 25,564 ounces when compared to the prior-year quarter. The increase in production was primarily attributable to a 28% increase
in gold grade which was only partially offset by a 13% decrease in ore tonnes mined and placed on the leach pad.
Mesquite's second quarter all-in sustaining costs of $999
per ounce and total cash costs of $611 per ounce were both significantly below the prior-year quarter. The mine's total cash costs
benefitted from the combination of higher gold production and lower diesel prices. At the same time, Mesquite's quarterly sustaining
costs decreased by $3 million, or $306 per ounce, to $12 million, which contributed to the $534 per ounce total decrease in all-in
sustaining costs relative to the second quarter of 2015.
For the six-month period ended June 30, 2016, Mesquite's gold
production increased by 10% to 52,935 ounces relative to the prior-year period. Mesquite's first half production benefitted from
increased ore tonnes mined and placed on the leach pad as well as higher gold grade.
Mesquite's first half all-in sustaining costs of $1,044 per
ounce and total cash costs of $618 per ounce were both significantly below the same period of the prior year. Mesquite's first
half sustaining costs decreased by $14 million, or $339 per ounce, to $24 million, which led to a $588 per ounce total decrease
in all-in sustaining costs relative to the six-month period ended June 30, 2015.
Peak Mines
Second quarter gold production at the Peak Mines of 31,285
ounces was more than double that of the prior-year quarter. The significant increase in gold production was attributable to the
combination of higher gold grade and recovery which was only partially offset by lower throughput. Gold production in the prior-year
quarter was well below average due to the impact of geotechnical challenges in the Peak Mines' most gold-rich ore body, Perseverance,
which limited the amount of ore that was mined and processed from this area.
Quarterly copper production of 3.6 million pounds remained
in line with the second quarter of 2015 as the impact of the decrease in throughput was offset by slight increases in both copper
grade and recovery.
All-in sustaining costs at the Peak Mines decreased by $843
per ounce to $706 per ounce relative to the prior-year quarter. The decrease in all-in sustaining costs was a result of a $636
per ounce decrease in total cash costs to $521 per ounce coupled with a $207 per ounce decrease in sustaining costs. The decrease
in total cash costs was primarily attributable to the increase in production with costs also benefitting from the depreciation
of the Australian dollar relative to the U.S. dollar. The decrease in costs was achieved despite by-product revenues decreasing
by $4 million, or $505 per ounce, relative to the prior-year quarter primarily as a result of the decrease in the realized copper
price.
For the six-month period ended June 30, 2016, gold production
at the Peak Mines increased by 48% to 50,881 ounces relative to the prior-year period. The increase in gold production in the first
half of 2016 was driven by an increase in gold grade and recovery for reasons consistent with those noted above for the second
quarter.
First half copper production of 6.6 million pounds was slightly
below that of the same period of the prior year as an 8% decrease in throughput was only partially offset by 2% increase in copper
recovery while copper grade remained consistent.
All-in sustaining costs at the Peak Mines in the first half
of 2016 decreased by $510 per ounce to $827 per ounce. The decrease in all-in sustaining costs was attributable to the combination
of a $354 per ounce decrease in total cash costs and a $3 million, or $156 per ounce, decrease in sustaining costs. The decrease
in total cash costs was driven by the increase in production as well as the depreciation of the Australian dollar relative to the
U.S. dollar, which more than offset the impact of by-product revenues decreasing by $5 million, or $251 per ounce, relative the
first half of 2015 primarily as a result of the decrease in the realized copper price.
Cerro San Pedro
Cerro San Pedro's second quarter gold production decreased
to 17,287 ounces as planned. As the mine was in its final months of active mining, the ore tonnes mined and placed on the leach
pad decreased significantly when compared to the prior-year quarter. Cerro San Pedro finished active mining in late June and has
now transitioned to residual leaching.
Cerro San Pedro's second quarter silver production was 0.2
million ounces.
Cerro San Pedro's second quarter all-in sustaining costs of
$941 per ounce increased slightly relative to the prior-year quarter, driven by a $19 per ounce increase in total cash costs to
$898 per ounce. The increase in total cash costs was attributable to the lower gold production.
For the six-month period ended June 30, 2016, consistent with
the company's expectations, gold production at Cerro San Pedro decreased to 36,063 ounces as the operation was in the final stages
of active mining.
First half silver production of 0.5 million ounces remained
in line with the same period of the prior year.
All-in sustaining costs at Cerro San Pedro in the first half
of 2016 decreased by $8 per ounce to $947 per ounce. The decrease in all-in sustaining costs was attributable to a decrease in
total cash costs resulting from a significant decrease in total tonnes moved in the first half of 2016 relative to the same period
of the prior year.
"Our four operations had a very solid second quarter
and first half of the year," stated David Schummer, Executive Vice President and Chief Operating Officer. "I am very
proud of our operating teams. It is as a result of their efforts that we were able to reduce our cost guidance for the year."
FINANCIAL RESULTS
|
|
|
|
Three months ended June 30 |
Six months ended June 30 |
(in millions of U.S. dollars, except per share amounts) |
2016 |
2015 |
2016 |
2015 |
|
|
|
|
|
Revenues |
$180.3 |
$167.7 |
$334.8 |
$336.6 |
|
|
|
|
|
Operating margin(6) |
95.6 |
69.5 |
168.2 |
138.8 |
|
|
|
|
|
Adjusted net earnings/(loss)(4) |
13.7 |
(1.3) |
13.4 |
(6.4) |
Adjusted net earnings/(loss) per share(4) |
0.03 |
- |
0.03 |
(0.01) |
|
|
|
|
|
Net earnings/(loss) |
(8.8) |
9.4 |
18.0 |
(34.4) |
Net earnings/(loss) per share |
(0.02) |
0.02 |
0.04 |
(0.07) |
|
|
|
|
|
Cash generated from operations before changes in non-cash operating working capital(3) |
82.4 |
62.7 |
144.5 |
130.1 |
Cash generated from operations |
79.2 |
56.9 |
140.7 |
126.7 |
|
|
|
|
|
Second quarter revenues of $180 million increased by $13 million,
or 8%, relative to 2015 as higher gold and copper sales volumes and a higher realized gold price more than offset a decrease in
the realized copper price. Relative to the second quarter of 2015, the average realized price increased by $76 per ounce of gold,
or 6%, and $1.16 per ounce of silver, or 7%, while the average realized price of copper decreased by $0.58 per pound, or 21%.
The company's second quarter operating margin(6)
increased by $26 million, or 38%, relative to 2015 due the above-noted increase in revenues coupled with a $14 million decrease
in the company's quarterly operating expenses. The decrease in operating expenses was attributable to the combined benefit of the
depreciation of the Canadian and Australian dollars relative to the U.S. dollar, the planned slowdown of mining activity at Cerro
San Pedro and the company's ongoing business improvement initiatives.
New Gold had adjusted net earnings of $14 million, or $0.03
per share, in the second quarter of 2016 relative to an adjusted net loss of $1 million, or $nil per share, in the prior-year quarter.
The increase relative to the prior-year quarter was primarily attributable to the increase in operating margin noted above and
an $8 million decrease in finance costs, which were only partially offset by an $11 million increase in depreciation and depletion
expense and a cumulative $2 million increase in share-based payment and exploration and business development expenses. The
decrease in finance costs was driven by a greater portion of the company's interest expense being capitalized against Rainy River.
The company reported a net loss of $9 million, or $0.02 per
share, in the second quarter relative to net earnings of $9 million, or $0.02 per share, in the prior-year quarter. The change
was primarily due to non-cash foreign exchange movements where the second quarter included a $5 million pre-tax foreign exchange
loss while the prior-year quarter included a $4 million pre-tax foreign exchange gain. The second quarter of 2016 also included
non-cash pre-tax losses of $10 million on the revaluation of the gold stream obligation and $8 million on the revaluation of the
company's gold price options contracts, both of which did not have an impact on the prior-year quarterly earnings.
New Gold's second quarter cash generated from operations before
changes in non-cash operating working capital increased by $20 million, or 31%, to $82 million. The increase relative to the second
quarter of 2015 was primarily attributable to the company's strong operating performance and the higher realized gold price more
than offsetting the decrease in the realized copper price. The company's cash generated from operations in the second quarter increased
by $22 million, or 39%, to $79 million.
For the six-month period ended June 30, 2016, revenues of
$335 million remained in line with the first half of 2015 as higher gold and copper sales volumes and a higher realized gold price
offset a decrease in the realized copper price.
Driven by a $31 million decrease in operating expenses, New
Gold's first half operating margin increased by 21% to $168 million.
New Gold had adjusted net earnings of $13 million, or $0.03
per share, in the first half of 2016 relative to an adjusted net loss of $6 million, or $0.01 per share, in the prior-year period.
The increase in earnings was attributable to the increase in operating margin and a $14 million decrease in finance costs, which
were only partially offset by a $14 million increase in depreciation and depletion expense and a $4 million cumulative increase
in share-based payment and exploration and business development expenses.
The company reported net earnings of $18 million, or $0.04
per share, in the first half relative to a net loss of $34 million, or $0.07 per share, in the first six months of 2015. The change
was primarily due to non-cash foreign exchange movements where the first half of 2016 included a $29 million pre-tax foreign exchange
gain while the prior-year period included a $32 million pre-tax foreign exchange loss. The 2016 first half foreign exchange gain
was offset by non-cash pre-tax losses of $26 million on the revaluation of the gold stream obligation and $4 million on the revaluation
of the company's gold price options contracts, both of which did not have an impact on the first half of the prior year.
For the six-month period ended June 30, 2016, New Gold's cash
generated from operations before changes in non-cash operating working capital increased by $14 million, or 11%, to $145 million.
The increase relative to the first half of 2015 was primarily attributable to the decrease in the company's operating expenses.
The company's cash generated from operations in the first half of 2016 increased by $14 million, or 11%, to $141 million.
FINANCIAL UPDATE
New Gold's cash and cash equivalents as at June 30, 2016 were
$220 million. The company also has a $300 million revolving credit facility, of which $121 million has been used as at June 30,
2016 to issue letters of credit, with the balance remaining undrawn. In addition, the remaining $75 million of the stream deposit
is to be received from RGLD Gold AG, a wholly-owned subsidiary of Royal Gold Inc., when 60% of the estimated Rainy River project
development capital has been spent and other customary conditions have been satisfied, which is expected to be late in the third
quarter or early in the fourth quarter of 2016.
During the first quarter, New Gold announced that it had entered
into gold price option contracts. New Gold purchased put options with a strike price of $1,200 per ounce covering 270,000 ounces
of gold and simultaneously sold call options with a strike price of $1,400 per ounce covering an equivalent 270,000 ounces. The
contracts cover 30,000 ounces of gold per month for the nine-month period from April through December 2016. As the gold price traded
between $1,200 and $1,400 per ounce during the second quarter, the first three 30,000 per month contracts expired unexercised.
As at the beginning of the third quarter, there were 180,000 ounces covered by the contracts for the balance of 2016.
At June 30, 2016, the face value of the company's long-term
debt was $800 million (book value – $789 million). The components of the debt include: $300 million of 7.00% face value senior
unsecured notes due in April 2020 and $500 million of 6.25% face value senior unsecured notes due in November 2022. The company
currently has approximately 513 million shares outstanding.
PROJECTS UPDATE
RAINY RIVER
Development activity at New Gold's Rainy River project, located
in northwestern Ontario, continued to advance during the second quarter. The focus of the 2016 development activities is the construction
of the processing facilities and supporting infrastructure as well as the initial stripping of the open pit.
RAINY RIVER – 2016 SECOND QUARTER PROJECT UPDATES
| · | Overall construction progress is currently over 40%
complete |
| · | Plant site earthworks substantially complete
|
| · | Concrete placement over 75% complete |
| · | Power line construction substantially complete |
| · | Installation of mechanical, piping, electrical and
instrumentation underway in grinding building and primary crusher |
| · | First ball mill shell segment placed in grinding building
|
| · | Pre-leach thickener tank 90% complete |
| · | Leach tanks over 30% complete |
| · | Received approval to being pumping an initial
amount of water from Pinewood river to water management facility for storage |
| · | Approvals to commence remediation work on water management
facilities expected in the coming weeks |
| · | Final submission of redesigns to tailings management
facility planned for mid-August |
| · | 225 people currently on full-time operations team
with over 70% from local communities, including over 30% from Indigenous communities |
| · | Material moved for mine development on target
|
| · | No Lost Time Incidents since New Gold acquired the
project in 2013 |
Construction of the process facilities and the pre-production
mining activities are advancing well. During the second quarter, the installation of the mechanical, piping, electrical and instrumentation
equipment started both in the grinding building and the primary crusher and the first ball mill shell was installed. The mine operations
team moved approximately 5.0 million tonnes of waste and overburden during the quarter, bringing the total material moved to date
to over 7.0 million tonnes. The team continues to increase the mining rate and is now moving an average of approximately 68,000
tonnes per day.
As previously disclosed, during the course of the construction
of the water management facility earlier in 2016, New Gold identified areas where the strength of the foundation is less than was
estimated for the original designs. As a result, during the second quarter, the company submitted revised construction designs
for regulatory review. Based on recent communications, New Gold anticipates receipt of the requisite permit amendments to begin
the remediation work on the water management facility in the coming weeks. Consistent with New Gold's previous disclosure, the
company's remediation plan includes the addition of rock toe buttresses at the base of the water management berms. Subsequent to
the end of the second quarter, the company received approval to begin pumping an initial amount of water from the Pinewood river
to the water management facility for storage.
The company is also finalizing its review of the tailings
management facility design, parts of which are similarly impacted by the foundation conditions, and plans to submit its proposed
redesigns for regulatory review by mid-August. New Gold's proposed redesign incorporates flatter slope angles and wick drains in
some areas. Construction on both the water management and tailings facilities will recommence immediately after receiving the respective
approvals.
With construction of the processing facilities and other components
of the project on schedule, and the process of amending the water and tailings management facilities advancing as planned, the
company continues to target first production at Rainy River in mid-2017. In support of this schedule, New Gold continues to work
with Environment and Climate Change Canada towards obtaining a Schedule 2 Amendment, required to deposit mine waste in certain
creeks, which is targeted to be received in mid-2017. However, the Schedule 2 Amendment is not required to maintain the planned
mid-2017 start-up, as the company has also evaluated the potential to construct a smaller starter dam within the broader tailings
management facility. The contemplated smaller facility would have capacity for approximately six months of mine waste and would
not require a Schedule 2 Amendment.
Project capital expenditures at Rainy River during the second
quarter totalled $107 million, bringing the total project development capital spending through June 30, 2016 to $501 million. Based
on the development capital spent to date, and assuming a C$1.30/US$ exchange rate on capital expenditures going forward, the total
Rainy River capital cost is expected to be approximately $940 million. The total capital cost estimate includes the previously
announced $35 million of additional capital required to adjust the design of the water and tailings management facilities.
Overall, the Rainy River project enhances New Gold's growth
pipeline through its manageable capital costs, significant production scale at below current industry average costs and exciting
longer-term exploration potential in a great mining jurisdiction. Rainy River is expected to generate significant gold production
growth for New Gold at costs below the company's 2016 guidance for all-in sustaining costs. Relative to the company's consolidated
2016 gold production guidance of 360,000 to 400,000 ounces, Rainy River alone is expected to produce an average of 325,000 ounces
of gold annually, which will more than offset the decrease in production and cash flow arising from the transition of Cerro San
Pedro to residual leaching. The company looks forward to advancing the Rainy River project and providing further updates on its
development.
BLACKWATER
The company's Blackwater project, located in south-central
British Columbia, is expected to produce an average of 485,000 ounces of gold per year at below industry average costs. The current
focus at Blackwater is attaining the approval of the Environmental Assessment ("EA"). The coordinated Federal and Provincial
EA technical review is in progress and New Gold is in the process of responding to the comments received from the Federal government,
Provincial agencies and local Indigenous communities. The company continues to anticipate approval of the Blackwater Provincial
EA by early 2017.
Capital expenditures at Blackwater during the second quarter
and first half of 2016 were $3 million and $4 million, respectively.
EL MORRO PROPERTY – 4% GOLD STREAM
As part of New Gold's 2015 sale of its 30% interest in the
El Morro property to Goldcorp Inc. ("Goldcorp"), the company retained a 4% stream on future gold production from El Morro.
The El Morro property forms part of Goldcorp and Teck Resources Limited's NuevaUnión project (formerly Project Corridor).
A pre-feasibility study is expected to commence for NuevaUnión in the fourth quarter of 2016 and is expected to be completed
in mid-2017. Environmental Impact Assessment baseline studies are expected to commence in the second half of 2016.
As at the end of 2015, 4% of the El Morro mineral reserves
represented 357,000 ounces of gold. For a detailed breakdown of mineral reserves by category, as well as key assumptions, parameters
and risks, refer to New Gold's Annual Information Form for the year ended December 31, 2015 filed on www.sedar.com.
WEBCAST AND CONFERENCE CALL
A webcast and conference call to discuss these results will
be held on Thursday, July 28, 2016 beginning at 9:30 a.m. Eastern time. Participants may participate via webcast by registering
on our website at www.newgold.com. You may also listen to the conference call by calling toll free 1-888-231-8191, or 1-647-427-7450
outside of the U.S. and Canada. A recorded playback of the conference call will be available until August 28, 2016 by calling toll
free 1-855-859-2056, or 1-416-849-0833 outside of the U.S. and Canada, passcode 45491569. An archived webcast will also be available
until October 28, 2016 at www.newgold.com.
ABOUT NEW GOLD INC.
New Gold is an intermediate gold mining company. The company
has a portfolio of four producing assets and two significant development projects. The New Afton Mine in Canada, the Mesquite Mine
in the United States, the Peak Mines in Australia and the Cerro San Pedro Mine in Mexico, provide the company with its current
production base. In addition, New Gold owns 100% of the Rainy River and Blackwater projects, both in Canada, as well as a 4% gold
stream on the El Morro project located in Chile. New Gold's objective is to be the leading intermediate gold producer, focused
on the environment and social responsibility. For further information on the company, please visit www.newgold.com.
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS
Certain information contained in this news release, including
any information relating to New Gold's future financial or operating performance are "forward looking". All statements
in this news release, other than statements of historical fact, which address events, results, outcomes or developments that New
Gold expects to occur are "forward-looking statements". Forward-looking statements are statements that are not historical
facts and are generally, but not always, identified by the use of forward-looking terminology such as "plans", "expects",
"is expected", "budget", "scheduled", "targeted", "estimates", "forecasts",
"intends", "anticipates", "projects", "potential", "believes" or variations of
such words and phrases or statements that certain actions, events or results "may", "could", "would",
"should", "might" or "will be taken", "occur" or "be achieved" or the negative
connotation of such terms. Forward-looking statements in this news release include, among others, statements with respect to: guidance
for production, total cash costs and all-in sustaining costs, and the factors contributing to those expected results, as well as
expected capital and other expenditures; planned activities for 2016 and beyond at the Company's projects; the expected production,
costs, economics and operating parameters of the Rainy River project; targeting timing for development and other activities related
to the Rainy River project; and statements with respect to the payment of the remaining $75 million from Royal Gold.
All forward-looking statements in this news release are based
on the opinions and estimates of management as of the date such statements are made and are subject to important risk factors and
uncertainties, many of which are beyond New Gold's ability to control or predict. Certain material assumptions regarding such forward-looking
statements are discussed in this news release, New Gold's annual and quarterly management's discussion and analysis ("MD&A"),
its Annual Information Form and its Technical Reports filed at www.sedar.com. In addition to, and subject to, such assumptions
discussed in more detail elsewhere, the forward-looking statements in this news release are also subject to the following assumptions:
(1) there being no significant disruptions affecting New Gold's operations; (2) political and legal developments in jurisdictions
where New Gold operates, or may in the future operate, being consistent with New Gold's current expectations; (3) the accuracy
of New Gold's current mineral reserve and mineral resource estimates; (4) the exchange rate between the Canadian dollar, Australian
dollar, Mexican peso and U.S. dollar being approximately consistent with current levels; (5) prices for diesel, natural gas, fuel
oil, electricity and other key supplies being approximately consistent with current levels; (6) equipment, labour and materials
costs increasing on a basis consistent with New Gold's current expectations; (7) arrangements with Indigenous groups in respect
of the Rainy River and Blackwater projects being consistent with New Gold's current expectations; (8) all required permits, licenses
and authorizations being obtained from the relevant governments and other relevant stakeholders within the expected timelines;
(9) the results of the feasibility study for the Rainy River project being realized; (10) in the case of all-in sustaining
cost outlooks at the Rainy River project, the assumed exchange rate being C$1.25/US$; and (11) conditions to the payment of the
remaining $75 million from Royal Gold being satisfied later in 2016.
Forward-looking statements are necessarily based on estimates
and assumptions that are inherently subject to known and unknown risks, uncertainties and other factors that may cause actual results,
level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking
statements. Such factors include, without limitation: significant capital requirements and the availability and management of capital
resources; additional funding requirements; price volatility in the spot and forward markets for metals and other commodities;
fluctuations in the international currency markets and in the rates of exchange of the currencies of Canada, the United States,
Australia and Mexico; discrepancies between actual and estimated production, between actual and estimated mineral reserves and
mineral resources and between actual and estimated metallurgical recoveries; changes in national and local government legislation
in Canada, the United States, Australia and Mexico or any other country in which New Gold currently or may in the future carry
on business; taxation; controls, regulations and political or economic developments in the countries in which New Gold does or
may carry on business; the speculative nature of mineral exploration and development, including the risks of obtaining and
maintaining the validity and enforceability of the necessary licenses and permits and complying with the permitting requirements
of each jurisdiction in which New Gold operates, including, but not limited to: in Canada, obtaining the necessary permits for
the Rainy River, New Afton C-zone and Blackwater projects; and in Mexico, where Cerro San Pedro has a history of ongoing legal
challenges related to our environmental authorization; the lack of certainty with respect to foreign legal systems, which may not
be immune from the influence of political pressure, corruption or other factors that are inconsistent with the rule of law; the
uncertainties inherent to current and future legal challenges New Gold is or may become a party to; diminishing quantities or grades
of reserves and resources; competition; loss of key employees; rising costs of labour, supplies, fuel and equipment; actual results
of current exploration or reclamation activities; uncertainties inherent to mining economic studies including the feasibility studies
for the Rainy River, New Afton C-zone and Blackwater projects; the uncertainty with respect to prevailing market conditions necessary
for a positive development decision at Blackwater; changes in project parameters as plans continue to be refined; accidents; labour
disputes; defective title to mineral claims or property or contests over claims to mineral properties; unexpected delays and costs
inherent to consulting and accommodating rights of Indigenous groups; risks, uncertainties and unanticipated delays associated
with obtaining and maintaining necessary licenses, permits and authorizations and complying with permitting requirements, including
those associated with the environmental assessment process for Blackwater. In addition, there are risks and hazards associated
with the business of mineral exploration, development and mining, including environmental events and hazards, industrial accidents,
unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion losses (and the risk of inadequate insurance or
inability to obtain insurance to cover these risks) as well as "Risk Factors" included in New Gold's disclosure documents
filed on and available at www.sedar.com. Forward-looking statements are not guarantees of future performance, and actual results
and future events could materially differ from those anticipated in such statements. All of the forward-looking statements contained
in this news release are qualified by these cautionary statements. New Gold expressly disclaims any intention or obligation to
update or revise any forward-looking statements whether as a result of new information, events or otherwise, except in accordance
with applicable securities laws.
TECHNICAL INFORMATION
The scientific and technical information in this news release
has been reviewed and approved by Mark A. Petersen, Vice President, Exploration of New Gold. Mr. Petersen is a SME Registered Member,
AIPG Certified Professional Geologist and a "Qualified Person" as defined under National Instrument 43-101.
For additional technical information on New Gold's material
properties, including a detailed breakdown of Mineral Reserves and Mineral Resources by category, as well as key assumptions, parameters
and risks, refer to New Gold's Annual Information Form for the year ended December 31, 2015 filed on www.sedar.com.
NON-GAAP MEASURES
(1) ALL-IN SUSTAINING COSTS AND SUSTAINING COSTS
"All-in sustaining costs" per ounce is a non-GAAP financial measure. Consistent with guidance announced in 2013 by the
World Gold Council, an association of various gold mining companies from around the world of which New Gold is a member, New Gold
defines "all-in sustaining costs" per ounce as the sum of total cash costs, capital expenditures that are sustaining
in nature, corporate general and administrative costs, capitalized and expensed exploration that is sustaining in nature and environmental
reclamation costs, all divided by the ounces of gold sold to arrive at a per ounce figure. New Gold believes this non-GAAP financial
measure provides further transparency into costs associated with producing gold and assists analysts, investors and other stakeholders
of the company in assessing the company's operating performance, its ability to generate free cash flow from current operations
and its overall value. This data is furnished to provide additional information and is a non-GAAP financial measure. All-in sustaining
costs presented do not have a standardized meaning under IFRS and may not be comparable to similar measures presented by other
mining companies. It should not be considered in isolation or as a substitute for measures of performance prepared in accordance
with IFRS and is not necessarily indicative of cash flow from operations under IFRS or operating costs presented under IFRS. Further
details regarding historical all-in sustaining costs and a reconciliation to the nearest IFRS measures are provided below and in
the MD&A accompanying New Gold's financial statements filed from time to time on www.sedar.com.
"Sustaining costs" is a non-GAAP financial measure.
New Gold defines sustaining costs as the difference between all-in sustaining costs and total cash costs, being the sum of capital
expenditures that are sustaining in nature, corporate general and administrative costs, capitalized and expensed exploration that
is sustaining in nature, and environmental reclamation costs. Management uses sustaining costs to understand the aggregate
net result of the drivers of all-in sustaining costs other than total cash costs. The line items between cash costs and all
in sustaining costs in the tables below break down the components of sustaining costs. Sustaining costs is intended to provide
additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures
presented by other mining companies. It should not be considered in isolation or as a substitute for measures of performance prepared
in accordance with IFRS.
(2) TOTAL CASH COSTS
"Total cash costs" per ounce is a non-GAAP financial measure which is calculated in accordance with a standard developed
by The Gold Institute, a worldwide association of suppliers of gold and gold products that ceased operations in 2002. Adoption
of the standard is voluntary and the cost measures presented may not be comparable to other similarly titled measures of other
companies. New Gold reports total cash costs on a sales basis. The company believes that certain investors use this information
to evaluate the company's performance and ability to generate liquidity through operating cash flow to fund future capital expenditures
and working capital needs. This measure, along with sales, is considered to be a key indicator of the company's ability to
generate operating earnings and cash flow from its mining operations. Total cash costs include mine site operating costs such as
mining, processing and administration costs, royalties, production taxes, and realized gains and losses on fuel contracts, but
are exclusive of amortization, reclamation, capital and exploration costs and net of by-product sales. Total cash costs are then
divided by ounces of gold sold to arrive at a per ounce figure. Co-product cash costs remove the impact of other metal sales that
are produced as a by-product of gold production and apportion the cash costs to each metal produced on a percentage of revenue
basis, and subsequently divides the amount by the total ounces of gold or silver or pounds of copper sold, as the case may be,
to arrive at per ounce or per pound figures. Unless otherwise indicated, all total cash cost information in this news release is
net of by-product sales. This data is furnished to provide additional information and is a non-GAAP financial measure. Total cash
costs and co-product cash costs presented do not have a standardized meaning under IFRS and may not be comparable to similar measures
presented by other mining companies. It should not be considered in isolation or as a substitute for measures of performance prepared
in accordance with IFRS and is not necessarily indicative of cash flow from operations under IFRS or operating costs presented
under GAAP. Further details regarding historical total cash costs and a reconciliation to the nearest IFRS measures are provided
below and in the MD&A accompanying New Gold's financial statements filed from time to time on www.sedar.com.
TOTAL CASH COSTS AND ALL-IN SUSTAINING COSTS RECONCILIATION |
|
|
|
|
|
|
|
|
|
Three months ended June 30 |
Six months ended June 30 |
(in millions of U.S. dollars, unless otherwise noted) |
2016 |
2015 |
2016 |
2015 |
|
|
|
|
|
Operating expenses |
$84.7 |
$98.2 |
$166.6 |
$197.8 |
Treatment and refining charges on concentrate sales |
3.8 |
8.5 |
7.3 |
15.9 |
Adjustments |
0.6 |
1.0 |
(0.2) |
1.7 |
Total cash costs before by-product revenue |
89.1 |
107.7 |
173.7 |
215.4 |
By-product copper and silver sales |
(55.1) |
(71.7) |
(109.3) |
(134.5) |
Total cash costs net of by-product revenue |
34.0 |
36.0 |
64.4 |
80.9 |
Gold ounces sold |
101,820 |
87,754 |
187,851 |
180,152 |
Total cash costs per gold ounce sold ($/ounce) |
$334 |
$410 |
$343 |
$449 |
Total cash costs per gold ounce sold on a co-product basis ($/ounce) |
$609 |
$704 |
$625 |
$717 |
Total cash costs net of by-product revenue |
34.0 |
36.0 |
64.4 |
80.9 |
Sustaining capital expenditure |
27.1 |
35.7 |
49.5 |
75.0 |
Sustaining exploration - expensed |
1.8 |
1.2 |
4.2 |
1.6 |
Corporate G&A including share-based compensation |
8.7 |
7.1 |
17.4 |
15.1 |
Reclamation expenses |
1.3 |
0.9 |
2.4 |
2.0 |
Total all-in sustaining costs |
72.9 |
80.9 |
137.9 |
174.6 |
All-in sustaining costs per gold ounce sold ($/ounce) |
$717 |
$922 |
$736 |
$969 |
All-in sustaining costs per gold ounce sold on a co-product basis ($/ounce) |
$871 |
$1,007 |
$885 |
$1,038 |
|
|
|
|
|
(3) CASH GENERATED FROM OPERATIONS BEFORE CHANGES IN WORKING
CAPITAL
"Cash generated from operations before changes in working capital" is a non-GAAP financial measures with no standard
meaning under IFRS, which exclude changes in non-cash operating working capital. Management uses this measure to evaluate the Company's
ability to generate cash from its operations before temporary working capital changes.
CASH GENERATED FROM OPERATIONS BEFORE CHANGES IN WORKING CAPITAL RECONCILIATION |
|
|
|
|
Three months ended June 30 |
Six months ended June 30 |
(in millions of U.S. dollars) |
2016 |
2015 |
2016 |
2015 |
|
|
|
|
|
Cash generated from operations |
$79.2 |
$56.9 |
$140.7 |
$126.7 |
|
Add back (deduct): Change in non-cash operating working capital |
3.2 |
5.8 |
3.8 |
3.4 |
Cash generated from operations before changes in non-cash working capital |
82.4 |
62.7 |
144.5 |
130.1 |
|
|
|
|
|
|
|
|
|
|
|
(4) ADJUSTED NET (LOSS)/EARNINGS
"Adjusted net (loss)/earnings" and "adjusted net (loss)/earnings per share" are non-GAAP financial measures.
Net (loss)/earnings have been adjusted and tax affected for the group of costs in "Other gains and losses" on the condensed
consolidated income statement. The adjusted entries are also impacted for tax to the extent that the underlying entries are impacted
for tax in the unadjusted net (loss)/earnings from continuing operations. The company uses this measure for its own internal purposes.
Management's internal budgets and forecasts and public guidance do not reflect fair value changes on senior notes and non-hedged
derivatives, foreign currency translation and fair value through profit or loss and financial asset gains/losses.
Consequently, the presentation of adjusted net earnings and
adjusted net earnings per share enables investors and analysts to better understand the underlying operating performance of our
core mining business through the eyes of management. Management periodically evaluates the components of adjusted net earnings
and adjusted net earnings per share based on an internal assessment of performance measures that are useful for evaluating the
operating performance of our business and a review of the non-GAAP measures used by mining industry analysts and other mining companies.
Adjusted net (loss)/earnings and adjusted net (loss)/earnings per share are intended to provide additional information only and
do not have any standardized meaning under IFRS and may not be comparable to similar measures presented by other companies. They
should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measures
are not necessarily indicative of operating profit or cash flows from operations as determined under IFRS.
ADJUSTED NET EARNINGS RECONCILIATION |
|
|
|
|
|
|
|
|
|
|
Three months ended June 30 |
Six months ended June 30 |
(in millions of U.S. dollars, except per share amounts) |
2016 |
2015 |
2016 |
2015 |
|
|
|
|
|
Net (loss) earnings before taxes |
($3.0) |
$10.3 |
$18.2 |
($26.7) |
|
Other losses (gains) |
22.7 |
(10.5) |
1.0 |
20.9 |
|
Inventory write-down |
(0.7) |
(0.6) |
- |
(0.8) |
Adjusted net earnings (loss) before tax |
19.0 |
(0.8) |
19.2 |
(6.6) |
|
Income tax expense |
(5.8) |
(0.9) |
(0.2) |
(7.7) |
|
Income tax adjustments |
0.5 |
0.4 |
(5.6) |
7.9 |
Adjusted income tax (expense) recovery |
(5.3) |
(0.5) |
(5.8) |
0.2 |
Adjusted net earnings (loss) |
13.7 |
(1.3) |
13.4 |
(6.4) |
Adjusted earnings (loss) per share (basic) |
0.03 |
- |
0.03 |
(0.01) |
Adjusted effective tax rate |
28% |
68% |
30% |
(2%) |
|
|
|
|
|
(5) AVERAGE REALIZED PRICE
"Average realized price per ounce or pound sold" is a non-GAAP financial measure with no standard meaning under IFRS.
Management uses this measure to better understand the price realized in each reporting period for gold, silver, and copper sales.
Average realized price is intended to provide additional information only and does not have any standardized definition under IFRS;
it should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Other
companies may calculate this measure differently and this measure is unlikely to be comparable to similar measures presented by
other companies.
(6) OPERATING MARGIN
"Operating margin" is a non-GAAP financial measure with no standard meaning under IFRS, which management uses to evaluate
the Company's aggregated and mine-by-mine contribution to net earnings before non-cash depreciation and depletion charges.
OPERATING MARGIN RECONCILIATION |
|
|
|
|
|
|
|
|
|
|
Three months ended June 30 |
Six months ended June 30 |
(in millions of U.S. dollars) |
2016 |
2015 |
2016 |
2015 |
|
|
|
|
|
Revenues |
$180.3 |
$167.7 |
$334.8 |
$336.6 |
Less: Operating expenses |
(84.7) |
(98.2) |
(166.6) |
(197.8) |
Operating margin |
95.6 |
69.5 |
168.2 |
138.8 |
|
|
|
|
|
CONDENSED CONSOLIDATED INCOME STATEMENTS (unaudited) |
|
|
|
|
|
|
|
|
Three months ended June |
Six months ended June |
(in millions of U.S. dollars, except per share amounts) |
2016 |
2015 |
2016 |
2015 |
Revenues |
180.3 |
167.7 |
334.8 |
336.6 |
Operating expenses |
84.7 |
98.2 |
166.6 |
197.8 |
Depreciation and depletion |
62.3 |
50.9 |
119.9 |
106.0 |
Earnings from mine operations |
33.3 |
18.6 |
48.3 |
32.8 |
|
|
|
|
|
Corporate administration |
5.9 |
5.5 |
11.6 |
11.5 |
Share-based payment expenses |
2.8 |
1.9 |
5.8 |
4.0 |
Exploration and business development |
2.0 |
1.2 |
4.5 |
2.3 |
Earnings from operations |
22.6 |
10.0 |
26.4 |
15.0 |
|
|
|
|
|
Finance income |
0.2 |
0.4 |
0.5 |
0.6 |
Finance costs |
(3.1) |
(10.6) |
(7.7) |
(21.4) |
Other (losses) gains |
(22.7) |
10.5 |
(1.0) |
(20.9) |
|
|
|
|
|
(Loss) earning before taxes |
(3.0) |
10.3 |
18.2 |
(26.7) |
Income tax expense |
(5.8) |
(0.9) |
(0.2) |
(7.7) |
Net (loss) earnings |
(8.8) |
9.4 |
18.0 |
(34.4) |
|
|
|
|
|
(Loss) earnings per share |
|
|
|
|
Basic |
(0.02) |
0.02 |
0.04 |
(0.07) |
Diluted |
(0.02) |
0.02 |
0.04 |
(0.07) |
|
|
|
|
|
Weighted average number of shares outstanding (in millions) |
|
|
|
|
Basic |
511.2 |
509.1 |
510.4 |
508.8 |
Diluted |
511.2 |
509.8 |
511.6 |
508.8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CONDENSED CONSOLIDATED STATEMENTS OF FINANCIAL POSITION (unaudited) |
|
|
|
|
As at June 30 |
As at December 31 |
(in millions of U.S. dollars) |
2016 |
2015 |
ASSETS |
|
|
Current assets |
|
|
Cash and cash equivalents |
219.5 |
335.5 |
Trade and other receivables |
106.0 |
109.0 |
Inventories |
141.0 |
145.9 |
Current income tax receivable |
13.7 |
19.2 |
Prepaid expenses and other |
5.4 |
5.0 |
Total current assets |
485.6 |
614.6 |
|
|
|
Non-current inventories |
140.3 |
115.4 |
Mining interests |
2,966.5 |
2,803.2 |
Deferred tax assets |
177.7 |
138.9 |
Other |
3.6 |
3.4 |
Total assets |
3,773.7 |
3,675.5 |
LIABILITIES AND EQUITY |
|
|
Current liabilities |
|
|
Trade and other payables |
160.0 |
141.1 |
Current income tax payable |
3.6 |
6.2 |
Total current liabilities |
163.6 |
147.3 |
|
|
|
Reclamation and closure cost obligations |
72.4 |
67.5 |
Gold stream obligation |
13.6 |
9.2 |
Provisions |
207.3 |
147.6 |
Derivative liabilities |
2.1 |
2.1 |
Long-term debt |
788.5 |
787.6 |
Deferred tax liabilities |
410.0 |
414.4 |
Other |
0.2 |
0.2 |
Total liabilities |
1,657.7 |
1,575.9 |
|
|
|
Equity |
|
|
Common shares |
2,854.2 |
2,841.0 |
Contributed surplus |
100.8 |
102.3 |
Other reserves |
(10.7) |
2.6 |
Deficit |
(828.3) |
(846.3) |
Total equity |
2,116.0 |
2,099.6 |
Total liabilities and equity |
3,773.7 |
3,675.5 |
|
|
|
CONDENSED CONSOLIDATED STATEMENTS OF CASH FLOW (unaudited) |
|
|
|
|
|
|
|
|
|
Three months ended June |
Six months ended June |
(in millions of U.S. dollars) |
2016 |
2015 |
2016 |
2015 |
OPERATING ACTIVITIES |
|
|
|
|
Net (loss) earnings |
(8.8) |
9.4 |
18.0 |
(34.4) |
Adjustments for: |
|
|
|
|
Foreign exchange losses (gains) |
4.9 |
(4.2) |
(29.0) |
31.8 |
Reclamation and closure costs paid |
- |
(0.1) |
(0.9) |
(0.2) |
Depreciation and depletion |
62.6 |
50.7 |
120.2 |
105.8 |
Other non-cash adjustments |
6.0 |
(0.6) |
4.8 |
(5.2) |
Income tax expense |
5.8 |
0.9 |
0.2 |
7.7 |
Finance income |
(0.2) |
(0.4) |
(0.5) |
(0.6) |
Finance costs |
3.1 |
10.6 |
7.7 |
21.4 |
Unrealized loss on gold stream liability |
10.4 |
- |
25.5 |
- |
|
83.8 |
66.3 |
146.0 |
126.3 |
Change in non-cash operating working capital |
(3.2) |
(5.8) |
(3.8) |
(3.4) |
Income taxes (paid) refunded |
(1.4) |
(3.6) |
(1.5) |
3.8 |
Cash generated from operations |
79.2 |
56.9 |
140.7 |
126.7 |
INVESTING ACTIVITIES |
|
|
|
|
Mining interests |
(138.2) |
(73.9) |
(245.6) |
(143.1) |
Government grant received |
- |
- |
- |
0.8 |
Proceeds from the sale of assets |
- |
- |
(2.1) |
- |
Gold price option contract investment costs |
0.6 |
0.6 |
1.1 |
0.6 |
Interest received |
0.2 |
0.4 |
0.5 |
- |
Cash used by investing activities |
(137.4) |
(72.9) |
(246.1) |
(141.7) |
|
|
|
|
|
FINANCING ACTIVITY |
|
|
|
|
Proceeds received from exercise of options and warrants |
6.4 |
- |
7.2 |
0.1 |
Financing initiation costs |
- |
- |
(0.3) |
- |
Interest paid |
(26.7) |
(26.1) |
(27.5) |
(26.1) |
Cash used by financing activities |
(20.3) |
(26.1) |
(20.6) |
(26.0) |
Effect of exchange rate changes on cash and cash equivalents |
(0.3) |
3.1 |
10.0 |
(2.7) |
|
|
|
|
|
Change in cash and cash equivalents |
(78.8) |
(39.0) |
(116.0) |
(43.7) |
Cash and cash equivalents, beginning of period |
298.3 |
365.8 |
335.5 |
370.5 |
Cash and cash equivalents, end of period |
219.5 |
326.8 |
219.5 |
326.8 |
|
|
|
|
|
Cash and cash equivalents are comprised of: |
|
|
|
|
Cash |
154.2 |
232.8 |
154.2 |
232.8 |
Short-term money market instruments |
65.3 |
94.0 |
65.3 |
94.0 |
|
219.5 |
326.8 |
219.5 |
326.8 |
SOURCE New Gold Inc.
%CIK: 0000800166
For further information: Hannes Portmann, Executive Vice President,
Business Development, Direct: +1 (416) 324-6014, Email: info@newgold.com
CO: New Gold Inc.
CNW 17:01e 27-JUL-16
This regulatory filing also includes additional resources:
ex991.pdf
New Gold (AMEX:NGD)
Historical Stock Chart
From Mar 2024 to Apr 2024
New Gold (AMEX:NGD)
Historical Stock Chart
From Apr 2023 to Apr 2024